RM11-20-000
Comments in Response to Underfrequency Load Shedding NOPR

Comments in Response to Notice of Proposed Rulemaking regarding Automatic Underfrequency Load Shedding And Load Shedding Plans Reliability Standards.  Docket No. RM11-20-000

12/23/2011
RM11-18-000
Comments of NERC in Response to NOPR on Transmission Planning Reliability Standards Table 1, Footnote 'b'

NERC files Comments in Response to Notice of Proposed Rulemaking regarding a proposed revision to footnote ‘b’ of Table 1 in four proposed Transmission Planning Reliability Standards.  Docket No. RM11-18-000​

12/21/2011
RM12-4-000
Petition for Approval of Proposed Reliability Standard FAC-003-2 - Transmission Vegetation Management

NERC files a Petition for Approval of Proposed Reliability Standard FAC-003-2 — Transmission Vegetation Management.  Docket No. RM12-4-000​

12/21/2011
NP12-5-000
Supplemental Information regarding Spreadsheet NOP - NP12-5-00

NERC submits supplemental information regarding the spreadsheet Notice of Penalty violations for Public Utility District No. 1 of Clark County which were filed on November 30, 2011.  Docket No. NP12-5-000

12/20/2011
RM05-17-000, RM05-25-000, RM06-16-000
NERC Standards Development Plan 2012-2014 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure

NERC submits the Standards Development Plan 2012-2014 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure detailing current and upcoming Standards projects and timelines.  Docket Nos. RM05-17-000, RM05-25-000, RM06-16-000

12/13/2011
RM11-11-000
Reply Comments in response to Notice of Proposed Rulemaking on CIP Version 4 Reliability Standards

NERC submits reply comments in response to comments filed in response to the Notice of Proposed Rulemaking on CIP Version 4 Reliability Standards.  Docket No. RM11-11-000

12/5/2011
RC11-1-000, RC11-2-000
Compliance Filing in accordance with the June 16, 2011 Order

NERC submits a filing in compliance with the directives in the Commission’s Order issued June 16, 2011. The June 16 Order upheld the registration of Cedar Creek Wind Energy and Milford Wind Corridor Phase I and required them to comply with a list of Transmission Owner and Transmission Operator Reliability Standards and Requirements that apply to the entities. Docket Nos. RC11-1-000 and RC11-2-000

12/2/2011
RC11-5-000
Response to Request for Production and Request for Confidential Treatment

NERC submits a Response to Request for Production and Request for Confidential Treatment in response to the request of City of Holland. Docket No. RC11-5-000​

12/2/2011
RR12-3-000
Petition for Approval of Definition and Capitalization Revisions to the NERC Rules of Procedure

NERC submits a petition for approval of Definition and Capitalization Revisions to the NERC Rules of Procedure. The purposes of the proposed revisions are (1) to place all definitions of defined terms used anywhere in the ROP in a single, readily-accessible location (proposed new Appendix 2); (2) to capitalize defined terms throughout the ROP where such terms are intended to be used in their defined meanings; and (3) to lower-case other terms that are currently capitalized in the ROP but are not defined terms.  Docket No. RR12-3-000

11/29/2011
RM06-16-000
Third Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693

NERC submits the Third Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2011.  Docket No. RM06-16-000

11/23/2011
RM08-13-001
Motion for an Extension of Time regarding a new Generator Relay Loadability Reliability Standard

NERC submits a Motion for Extension of Time to address the directive in Order No. 733 to develop a new generator relay loadability standard, in accordance with NERC’s Reliability Standards Development Plan 2012-2014.  Docket No. RM08-13-001

11/22/2011
RM09-25-000
Motion for Extension of Time regarding System Personnel Training Reliability Standard

NERC submits a Motion for Extension of Time to address the directive in Order No. 742 regarding whether personnel that support EMS applications should be included in a Support Personnel Training Reliability Standard, in accordance with NERC’s Reliability Standards Development Plan 2012-2014.  Docket No. RM09-25-000

11/22/2011
RR12-2-000
Petition of NERC for Approval of Amendments to Delegation Agreement with WECC

NERC submits a petition requesting the Commission’s approval of amendments to the Amended and Restated Delegation Agreement  between NERC and the Western Electricity Coordinating Council (WECC), one of the NERC Regional Entities (the WECC RDA). The proposed amendments to the WECC RDA consist of amendments to Exhibit B – the WECC Bylaws, and to Exhibit C – the WECC Regional Reliability Standards Development Procedure (RSDP). Docket No. RR12-2-000

11/22/2011
RM11-16-000
Comments in Response to NOPR on Reliability Standard PRC-023-2

NERC submits comments in response to the Notice of Proposed Rulemaking on proposed Reliability Standard PRC-023-2 (Transmission Relay Loadability). Docket No. RM11-16-000

11/21/2011
RM11-11-000
Comments in Response to NOPR on Version 4 CIP Reliability Standards

NERC submits comments in response to the Notice of Proposed Rulemaking on the Version 4 Critical Infrastructure Protection Reliability Standards.  Docket No. RM11-11-000

11/21/2011
RC11-6-000
Motion for Leave to Answer and Answer

NERC submits a Motion for Leave to Answer and Answer in response to the Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Informational Filing Regarding NERC’s Efforts to Refocus Implementation of its Compliance Monitoring and Enforcement Program. NERC’s Answer is limited and will clarify certain concerns raised in the comments of the ISO/RTO Council (IRC). Docket No. RC11-6-000

11/14/2011
RR12-1-000
Petition for Approval of a Revision to the Rules of Procedure- Correction to Section 1.3 of Appendix 4D  

NERC submits a Petition for Approval of a Revision to the Rules of Procedure of the North American Electric Reliability Corporation – Correction to Section 1.3 of Appendix 4D, “Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards.”  Docket No. RR12-1-000

11/14/2011
RC11-1-000, RC11-2-000
Joint Motion for Extension of Time to Submit Compliance Filing

NERC, WECC, et al. submit a joint motion for extension of time from November 14, 2011 to December 2, 2011 to allow NERC to submit a compliance filing in response to the Commission’s June 16, 2011 Order regarding the registration of Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC. The Commission directed NERC to submit a compliance filing identifying the Reliability Standards and Requirements that will be applicable to Cedar Creek and Milford. Docket Nos. RC11-1-000 and RC11-2-000

11/10/2011
RR10-11-004
Compliance Filng in Response to the October 7, 2011 Order

NERC submits a Compliance Filing in Response to the October 7, 2011 Order.  Specifically, in the October 7, 2011 Order, the Commission rejected NERC's proposal to delete Section 402.1.3.2 of the NERC Rules of Procedure; this compliance filing is made to restore Section 402.1.3.2 to the NERC Rules of Procedure.  Docket No. RR10-11-004

11/7/2011
RR06-1-000, RR09-7-000
Informational Report of NERC on Analysis of Standards Process Results for the Third Quarter 2011

NERC submits an informational report on the analysis of NERC Standards Process Results for the Third Quarter 2011 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010.  Docket Nos. RR06-1-000 and RR09-7-000

10/31/2011
RM12-1-000
Petition for Approval of a Revised Transmission Planning System Performance Requirements Reliability Standard TPL-001-2

NERC submits a petition for approval of a Revised Transmission Planning System Performance Requirements Reliability Standard TPL-001-2 and five new glossary terms and for retirement of four existing Reliability Standards.  Docket No. RM12-1-000

10/19/2011
RC11-5-000
Motion to Intervene and Comments regarding City of Holland, Michigan Board of Public Works

NERC submits a Motion to Intervene and Comments in response to the appeal of the City of Holland, Michigan Board of Pubilc Works.  Docket No. RC11-5-000

10/3/2011
RC11-6-000
Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Find Fix and Track (FFT) Informational Filing 

NERC submits a Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Find Fix and Track (FFT) Informational Filing in Docket No. RC11-6-000. (Spreadsheet Attachment to the Filing)

9/30/2011
RR10-1-000
First Annual Annual Report of NERC on Wide-Area Analysis of Technical Feasibility Exceptions

NERC files the first Annual Report of the North American Electric Reliability Corporation on Wide-Area Analysis of Technical Feasibility Exceptions.  Docket No. RR10-1-000

9/28/2011
NP11-238-000
Additional Comments in Support of NP11-238

NERC submits additional comments in support of the Notice of Penalty filed on July 28, 2011 regarding a Notice of Penalty for Southwestern Power Administration. Docket No. NP11-238-000

9/19/2011
RC11-1-000, RC11-2-000
Joint Motion for Extension of Time

NERC and WECC submit a joint motion for extension of time from September 14, 2011 to November 14, 2011 to allow NERC to submit a compliance filing in response to the Commission’s June 16, 2011 Order regarding the registration of Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC.  The Commission directed NERC to submit a compliance filing identifying the Reliability Standards and Requirements that will be applicable to Cedar Creek and Milford. Docket Nos. RC11-1-000 and RC11-2-000 

9/13/2011
RD11-12-000
Petition for Approval of Interpretations to Requirements of Reliability Standards EOP-001-0b and EOP-001-2b (Emergency Operations Planning)

NERC files a petition for approval of interpretations to EOP-001-0 Requirements R1 and R3.2, and to EOP-001-2 Requirements R1 and R2.2. Docket No. RD11-12-000

9/9/2011
RM06-16-000
Second Quarter 2011 Compliance Filing of the NERC in Response to Paragraph 629 of Order No. 693

NERC files the Second Quarter 2011 Compliance Filing of the NERC in Response to Paragraph 629 of Order No. 693. Docket No. RM06-16-000

8/31/2011
RR11-7-000
Request of NERC for Acceptance of 2012 Business Plan and Budget and the 2012 Business Plans and Budget of Regional Entities

NERC files a Request for Acceptance of 2012 Business Plan and Budget and the 2012 Business Plans and Budget of Regional Entities and for Approval of Proposed Assessments to Fund Budgets.  Docket No. RR11-7-000

8/24/2011
RM09-13-000
Motion to Further Defer Action on Time Error Correction Reliability Standard

NERC submits a Motion to Further Defer Action on the Time Error Correction Reliability Standard.  Docket No. RM09-13-000

8/11/2011
RR06-1-000, RR09-7-000
Informational Report of NERC on Analysis of Standard Process Results for the Second Quarter 2011

NERC submits a quarterly Informational Report on Analysis of Standard Process Results for the Second Quarter 2011.  Docket Nos. RR06-1-000, RR09-7-000

7/29/2011
RR09-6-003
Informational Report on NERC Standards Status and Timetable for Addressing Regulatory Directives

NERC submits a report summarizing the progress made, and plans for addressing the standards-related directives received from applicable ERO governmental authorities.  Docket No. RR09-6-003

7/26/2011
RM11-11-000
Filing in Support of June 20, 2011 WECC Compliance Filing in Response to Order Nos. 751 and 752

NERC submits a filing in support of the June 20, 2011 compliance filing of The Western Electricity Coordinating Council in Response to Order Numbers 751 and 752 on Version One Regional Reliability Standards.  Docket Nos. RM11-11-000

7/21/2011
RM08-13-000
Informational Filing of the NERC in Response to Order 733-A on Rehearing, Clarification, and Request for an Extension of Time

NERC submits an Informational Filing of the NERC in Response to Order 733-A on Rehearing, Clarification, and Request for an Extension of Time addressing certain aspects of the August 14, 2003 blackout investigation relative to operation of protective relays in response to stable power swings. Docket No. RM08-13-000

7/21/2011
NP11-206-000
Supplemental Filing for a Notice of Penalty - Docket No. NP11-206

North American Electric Reliability Corporation submits a Supplemental Filing regarding a Notice of Penalty for an Unidentified Registered Entity in Docket No. NP11-206-000.

7/20/2011
RC11-1-001, RC11-2-001
Request for Clarification or, in the Alternative, Rehearing of the Order Denying Appeals of Compliance Registry Determinations of Milfod and Cedar Creek

NERC files a Request for Clarification or, in the Alternative, Rehearing of the Order Denying Appeals of Electric Reliability Organization Registration Determinations concerning Milford Wind Corridor Phase I, LLC, and Cedar Creek Wind Energy.  Docket Nos. RC11-1-001 and RC11-2-001

7/18/2011
NP11-213-000
Supplemental Informational Filing - NP11-213

NERC submitted a supplemental informational filing regarding the June 29, 2011 Notice of Penalty for an Unidentified Registered Entity.  Docket No. NP11-213-000

7/15/2011
RM10-6-000
Comments of NERC in Support of the Supplemental Comments in the July 13th Filing of the Trade Associations

NERC submits comments in support of the Supplemental Comments of Edison Electric Institute, the American Public Power Association, the National Rural Electric Cooperative Association, the Electric Power Supply Association, the Transmission Access Policy Study Group, and the Canadian Electricity Association regarding the proposed interpretation of Reliability Standard TPL-002, Requirement R1.3.10.  Docket No. RM10-6-000

7/13/2011
NP11-184-000
NERC and ReliabilityFirst Corporation Response to the June 24, 2011 Data Request

Response of NERC and ReliabilityFirst Corporation to the June 24, 2011 Letter Order Requesting Data and Documents filed with FERC in Docket No. NP11-184-000

7/8/2011
RM11-11-000
Response of NERC to April 12 , 2011 CIP Data Request - Part II

NERC submits part II of its response to the April 12, 2011 FERC Data Request concerning CIP Version 4 Reliability Standards. Doket No. RM11-11-000​

6/30/2011
RM11-12-000
Comments of NERC in Response to the Notice of Proposed Rulemaking on the Availability of e-Tag Information to the Commission Staff

NERC files comments in response to Notice of Proposed Rulemaking on the Availability of e-Tag Information to Commission Staff.  Docket No. RM11-12-000​

6/27/2011
RM10-29-000
Comments on Notice of Proposed Rulemaking Regarding Interpretation of TOP-001-1

NERC submits comments in support of FERC's proposal in the Notice of Proposed Rulemaking Regarding Interpretation of TOP-001-1.  Docket No. RM10-29-000​

6/24/2011
RD11-6-000
Petition for Approval of Reliability Standard CIP-001-2a (Sabotage Reporting) with a Regional Variance for the Texas Reliability Entity

NERC submits a petition for approval of Reliability Standard CIP-001-2a (Sabotage Reporting) with a Regional Variance for Texas Reliability Entity. Docket No. RD11-6-000

6/21/2011
RM11-28-000
Petition for Approval of Proposed Reliability Standard FAC-008-3 (Facility Ratings)

NERC submits a petition for approval of proposed Reliability Standard FAC-008-3 (Facility Ratings). Docket No. RM11-28-000

6/15/2011
RR11-5-000
Petition for Approval of Appendices 3B and 3D to the NERC ROP Regarding the Election Procedure for Members of NERC SC and RBB Criteria

NERC files a petition for Approval of Appendices 3B and 3D to the NERC Rules of Procedure Regarding the Election Procedure for Members of NERC Standards Committee and Registered Ballot Body Criteria.  Docket No. RR11-5-000​

6/13/2011
RM11-18-000
Response to FERC's 5/17/11 Letter

NERC submits a Response to the Commission’s May 17, 2011 Letter Requesting Additional Information Regarding NERC’s Request for Approval of Four Transmission Planning System Performance Reliability Standards.  Docket No. RM11-18-000​

6/7/2011
RM11-11-000
Supplemental Information Regarding CIP Version 4 VRFs and VSLs

In response to a FERC staff request, NERC submits a supplemental filing including the CIP Version 4 VRFs and VSLs in Docket No. RM11-11-000.​

6/6/2011
RM06-16-000
First Quarter 2011 Compliance Filing in Response to Paragraph 629 of Order No. 693

NERC submits the First Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693.  Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2011.  Docket No. RM06-16-000​

5/31/2011
RD11-8-000
Petition for Approval of Proposed NPCC Regional Reliability Standard PRC-002-NPCC-01 (Disturbance Monitoring)

NERC submits a petition for approval of proposed NPCC regional Reliability Standard PRC-002-NPCC-01 (Disturbance Monitoring).  Docket No. RD11-8-000​

5/31/2011
RR11-4-000
Report of Comparisons of Budgeted to Actual Costs for 2010

NERC submits a true-up Report of Comparisons of Budgeted to Actual Costs for 2010 for NERC and the Regional Entities  Docket No. RR11-4-000​

5/31/2011
RC11-3-000
Doc-Less Motion to Intervene in RC11-3-000

NERC submitted a doc-less Motion to Intervene regarding the Joint Petition for Authorization to Intervene in a CEA Hearing, for Expedited Consideration and for Alternative Relief. Docket No. RC11-3-000​

5/27/2011
RM11-11-000
Response of NERC to April 12, 2011 CIP Data Request

NERC submits a Response to the Federal Energy Regulatory Commission Office of Electric Reliability’s April 12, 2011 Data Request.  Docket No. RM11-11-000​

5/27/2011
RR11-3-000
Petition for Approval of Amendments to Delegation Agreement with NPCC, Inc.

NERC submmits a petition that seeks approval of proposed amendments to NERC’s Delegation Agreement with the Northeast Power Coordinating Council, Inc. (NPCC) and approval of amendments to NPCC’s Bylaws and Regional Reliability Standards Development Procedure (included in Exhibits B and C to the Delegation Agreement) as “Regional Entity Rules.”  Docket No. RR11-3-000​

5/25/2011
RR11-2-000
Petition for Approval of CMEP Agreement Between NPCC and WECC and Related Amendment to Delegation Agreements

NERC submits a petition that seeks approval of (1) an Agreement Between Northeast Power Coordinating Council [NPCC] and Western Electricity Coordinating Council [WECC] Concerning Compliance Monitoring and Enforcement of WECC Registered Functions, (2) to the extent necessary, an Agreement between NERC and WECC concerning termination of their existing Agreement Concerning Compliance Monitoring and Enforcement of WECC Registered Functions, and (3) related amendments to the Delegation Agreements between NERC and NPCC and NERC and WECC.  Docket No. RR11-2-000​

5/25/2011
RM11-12-000
Errata to Petition for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-Frequency Load Shedding

NERC submits an errata to the Petition of the North American Electric Reliability Corporation for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-frequency Load-Shedding.  Docket No. RM11-12-000​

5/17/2011
RR10-12-001
Supplemental Information Regarding the Meaning of "Necessary" in NERC's 12/1/10 Compliance Filing in Response to FERC's 9/3/10 Order

NERC submits a letter to FERC regarding the meaning of the work "necessary" in NERC’s December 1, 2010 Compliance Filing in Response to Federal Energy Regulatory Commission’s September 3, 2010 Order Approving Petition and Directing Compliance Filing. Docket No. RR10-12-001

5/17/2011
RM05-17-000, RM05-25-000, RM06-16-000
Supplemental Filing to NERC's April 5, 2011 Informational Filing of the RSDP 2011-2013

NERC files a supplemental Filing to the Reliability Standards Development Plan 2011-2013 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure made on April 5, 2011 to provide additional documents.  Docket Nos. RM05-17-000, RM05-25-000, and RM06-16-000​

5/13/2011
NP11-181-000
Errata to the April 29, 2011 ACP Filing

NERC submits an errata to the April 29, 2011 Administrative Citation Process Notice of Penalty filing. (Spreadsheet) Docket No. NP11-181-000​

5/11/2011
AD11-8-000
Comments in Response to LBNL's Frequency Response Report

NERC submits comments in response to the January 20, 2011 release of the FERC-sponsored report prepared by the Lawrence Berkeley National Laboratory on the Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation and its five supporting papers. Docket No. AD11-8-000​

5/6/2011
RM06-16-000, RD10-14-000
Request to Withdraw Prior Request to Terminate Quarterly Informational Filing

Request to withdraw request to terminate the quarterly informational filing obligation in Order No. 693, Paragraph 629 under Docket Nos. RM06-16-000 and RD10-14-000.​

5/6/2011
RR06-1-000, RR09-7-000
First Quarter 2011 Analysis of NERC Standards Process Results

NERC submits its Analysis of NERC Standards Process Results for the First Quarter 2011 under Docket Nos. RR06-1-000 and RR09-7-000.​

5/2/2011
RD11-7-000
Petition for Approval of a Personnel Performance, Training, and Qualifications Reliability Standard PER-003-1

NERC submits a Petition for Approval of a Personnel Performance, Training, and Qualifications Reliability Standard PER-003-1.  Docket No. RD11-7-000​

4/29/2011
RM06-16-009, RM11-18-000
Errata to Petition for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards

NERC submits an errata to the Petition of NERC for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards correcting an implementation date stated in the body of the filing.  Docket No. RM06-16-009 and RM11-18-000​

4/26/2011
RR11-1-000, RR11-1-001
Motion to Intervene, Request to Consolidate of Dockets, and Response of NERC the NPPD and SPP RE Petition for Review of NERC's Denial of Request

NERC submits a Motion to Intervene, Request to Consolidate Dockets, and Response of NERC to Petitions of the NPPD and SPP RE for Review of NERC’s Denial of Request to Amend Two Delegation Agreements and to Transfer Registration.  Docket Nos. RR11-1-000 and RR11-1-001​

4/21/2011
RM10-15-000
Request for Clarification of Order No. 748 Regarding Mandatory Reliability Standards for Interconnection Reliability Operating Limits

NERC submits a request for clarification of Order No. 748 regarding three key elements regarding Mandatory Reliability Standards for Interconnection Reliability Operating Limits.  Docket No. RM10-15-000​

4/18/2011
RM10-16-000
Request for Clarification of Order No. 749 Regarding System Restoration Reliability Standards

NERC submits a Request for Clarification of Order No. 749 Regarding System Restoration Reliability Standards.  Docket No. RM10-16-000​

4/18/2011
NP10-18-002
Request for for Clarification, or, in the Alternative, Rehearing and Motion To Intervene Out-Of-Time of FRCC, MRO, NPCC, SPP RE and Texas RE - NP10-18

NERC, FRCC, MRO, NPCC, SPP RE, Texas RE and WECC submit a Request for Clarification, or, in the Alternative, Rehearing and Motion to Intervene Out-Of-Time of FRCC, MRO, NPCC, SPP RE and Texas RE under Docket No. NP10-18-002.​

4/18/2011
RM11-23-000
Petition for Approval of an Interpretation to Reliabiliity Standard TOP-002-2a

NERC submits a petition for approval of an interpretation to Requirement R10 of Reliability Standard TOP-002-2a (Normal Operations Planning). The interpretation is called TOP-002-2b. Docket No. RM11-23-000​

4/15/2011
RD11-5-000
Petition for Approval of Interpretations to Reliability Standard PRC-004-1 and PRC-005-1

NERC submits a Petition for Approval of Interpretations of Requirements R1 and R3 to Reliability Standard PRC-004-1— Analysis and Mitigation of Transmission and Generation Protection System Misoperations and Requirements R1 and R2 to Reliability Standard PRC-005-1 — Transmission and Generation Protection System Maintenance and Testing.  Docket No. RD11-5-000​

4/15/2011
RM11-11-000, RM06-22-000
Request for an Extension of Time to Respond to April 12, 2011 Data Request Regarding Petition for Approval of CIP Version 4 Reliability Standards

NERC submits a Request for an Extension of Time to Respond to the April 12, 2011 Data Request Regarding the NERC Petition for Approval of CIP Version 4 Reliability Standards.  Docket Nos. RM11-11-000 and RM06-22-000​

4/13/2011
RM06-22-000
Errata to Petition for Approval of CIP Version 4 Reliability Standards

NERC submits an Errata to the Petition for Approval of Critical Infrastructure Protection (CIP) Reliability Standards Version 4 correcting several parts of the original petition.  Docket No. RM06-22-000​

4/12/2011
RM11-2-000
Comments in Response to January 31, 2011 Technical Conference Regarding Smart Grid Interoperability Standards

NERC submits comments following the January 31, 2011 Technical Conference on NIST's five foundational families of smart grids and NERC recommendations.  Docket No. RM11-2-000​

4/8/2011
RM05-17-000 , RM05-25-000, RM06-16-000
Informational Filing of Reliability Standards Development Plan 2011-2013 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure

NERC submits an informational filing containing the Reliability Standards Development Plan for 2011-2013 Pursuant to Section 310 of the NERC Rules of Procedure.  Docket No. RM05-17-000 , RM05-25-000, and RM06-16-000​

4/5/2011
NP11-162-000
Errata Regarding Administrative Citation Process Notice of Penalty for Eight Registered Entities

NERC submits an errata concerning it's March 31, 2011 Administrative Citation Process Notice of Penalty regarding eight registered entities, including The Detroit Edison Company. By this filing, NERC clarifies that the penalty amount associated with the VAR-002-1 R3.1 violation should be $5,000 instead of $10,000.  Docket No, NP11-162-000​

4/4/2011
RM06-16-009, RM11-18-000
Petition for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards

NERC submits a Petition for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards. NERC requests that FERC approve four revised Reliability Standards: TPL-001-1, TPL-002-1b, TPL-003-1a, andTPL-004-1. NERC also seeks the concurrent retirement of four existing Reliability Standards: TPL-001-0.1, TPL-002-0b, TPL-003-0a, and TPL-004-0.  Docket No. RM06-16-009 and RM11-18-000​

3/31/2011
RM11-20-000
Petition for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-Frequency Load-Shedding

NERC submits a Petition for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-Frequency Load-Shedding.  In this filing, NERC requests the FERC to approve PRC-006-1 and EOP-003-2 and requests FERC approval for implementation plans that call for the retirement of  PRC-006-0, PRC-007-0, PRC-009-0 and EOP-003-1.  Docket No. RM11-20-000​

3/31/2011
RM11-19-000
Petition for Approval of a Proposed Modification to Protection System Definition

NERC submits a Petition of NERC for Approval of a Proposed Modification to the Glossary of Terms Used in Reliability Standards Definition of “Protection System.”  Docket No. RM11-19-000​

3/30/2011
AD11-6-000
Comments of NERC Following the February 8, 2011 Technical Conference on Priorities for Addressing Risks to the Reliability of the Bulk-Power System

NERC files comments following the February 8, 2011 Technical Conference on Priorities for Addressing Risks to the Reliability of the Bulk-Power System.  Docket No. AD11-6-000​

3/21/2011
RD10-6-000, RD09-7-002
Compliance Filing in Response to January 20, 2011 Order on Violation Risk Factors and Violation Severity Levels for CIP Reliability Standards

NERC submits a Compliance Filing in Response to January 20, 2011 Order on Violation Risk Factors (VFRs) and Violation Severity Levels (VSLs) for Critical Infrastructure Protection Reliability Standards.  Docket No. RD10-6-000, RD09-7-002​

3/21/2011
RR08-4-000, RR08-4-001, RR08-4-002, RR08-4-005
Supplemental Information to the NERC Compliance Filing in Response to the Order on Violation Severity Levels Proposed by the ERO

Supplemental Information to the NERC Compliance Filing in Response to the Order on Violation Severity Levels (VSLs) Proposed by NERC.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002, and RR08-4-005​

3/21/2011
RM08-13-000
Petition for Approval of a Protection and Control (PRC) Reliability Standard PRC-023-2

NERC submits a petition for approval of PRC-023-2 – Transmission Relay Loadability.  NERC also requests FERC approval of a proposed addition to the NERC Rules of Procedure, Section 1700 – Challenges to Determinations. This filing satisfies certain directives the Commission issued in Order No. 733 pertaining to developing modifications to PRC-023-1.  Docket No. RM08-13-000​

3/18/2011
NP11-114-000
Supplemental Information regarding a Notice of Penalty - NP11-114

NERC submits supplemental information regarding a Notice of Penalty for Texas Municipal Power Agency.  Docket No. NP11-114-000​

3/18/2011
NP11-128-000
Supplemental Information regarding a Notice of Penalty - NP11-128

NERC submits supplemental information regarding a Notice of Penalty for an Unidentified Registered Entity.  Docket No. NP11-128-000​

3/18/2011
RR09-7-000, AD10-14-000
Informational Filing in Response to FERC's September 16, 2010 Order Regarding NERC's Three Year Performance Assessment

NERC submits an Informational Filing in Response to FERC's September 16, 2010 Order regarding NERC's Three Year ERO Performance Assessment Report.  The September 16, 2010 Order contained a number of specific directives and other actions that NERC was to address in an informational filing to be submitted within six months.  NERC is commenting on or providing current information concerning its activities with respect to a number of the areas of additional guidance.  Docket Nos. RR09-7-000 and AD10-14-000​

3/16/2011
RM10-11-000
Comments of NERC on November 18, 2010 NOPR on the Integration of Variable Energy Resources

NERS submits comments on the November 18, 2010 Notice of Proposed Rulemaking on the Integration of Variable Energy Resources and FERC's proposal to “reform the pro forma Open Access Transmission Tariff to remove unduly discriminatory practices and to ensure just and reasonable rates for Commission-jurisdictional services.”  Docket No. RM10-11-000​

3/2/2011
RM06-16-000
Fourth Qtr. 2010 Compliance Filing in Response to Para. 629 of Order No. 693 and Request to Terminate Compliance Filing Obligation

NERC submits a Fourth Quarter 2010 Compliance Filing in Response to Paragraph 629 Of Order No. 693 and requests to terminate the compliance filing obligation.  Docket No. RM06-16-000​

2/28/2011
RM10-5-000
Comments in Response to NOPR on Interpretation to Reliability Standard PRC-005-1

NERC submits comments in response to FERC's Notice of Proposed Rulemaking on the proposed interpretation to PRC-005-1.  Docket No. RM10-5-000​

2/25/2011
RM09-9-000
Comments in Response to Notice of Proposed Rulemaking Concerning Regional Reliability Standards for the WECC Region

NERC submits comments in response to  FERC's Notice of Proposed Rulemaking regarding Regional Reliability Standards FAC-501-WECC-1 –Transmission Maintenance; PRC-004-WECC-1 – Protection System and Remedial Action Scheme Misoperation; VAR-002-WECC-1 – Automatic Voltage Regulators, and VAR-501-WECC-1 – Power System Stabilizer (“WECC NOPR”).  Docket No. RM09-9-000​

2/22/2011
RD10-4-000
Compliance Filing in Response to January 6, 2011 Order Approving Reliability Standards Revisions to Withdraw two MISO Waivers

NERC submits a Compliance Filing in Response to FERC's January 6, 2011 Order Approving NERC’s November 20, 2009 Petition for Approval of two Reliability Standards Revisions to Withdraw MISO Waivers.  Docket No RD10-4-000.​

2/22/2011
RM09-13-000
Status Report Regarding BAL-004-1 Time Error Correction Reliability Standard

NERC submits a Status Report Regarding BAL-004-1 Time Error Correction Reliability Standard completing a committment made in a August 20, 2010 Motion to Defer Action.  Docket No RM09-13-000​

2/22/2011
RR10-11-000
Compliance Filing in Response to October 21, 2010 Order

NERC submits a compliance filing including revised pro forma delegation agreement, revised Sections 100-1600 of the ROP, revised Appendix 4A to the ROP and revised Appendix 4C to the ROP.  This filing responds to an October 21, 2010 Order ordering that further revisions be made to the pro forma and individual Delegation Agreements, to certain provisions of the ROP, to the Bylaws of FRCC and MRO, and certain additional explanatory information.  Docket No. RR10-11-000​

2/18/2011
RM10-29-000
Response of NERC to January 28, 2011 Request for Additional Information Regarding Interpretation to TOP-008-1 R8

NERC submits a Response to the Commission's January 28, 2011 Request for Data regarding NERC’s July 16, 2010 petition seeking approval for an interpretation of Requirement R8 of NERC Reliability Standard TOP-001-1 – Reliability Responsibilities and Authorities.  Docket No. RM10-29-000​

2/14/2011
RM11-4-000
Petition for Approval of One Emergency Preparedness and Operations Reliability Standard EOP-008-1 and Retirement of EOP-008-0

NERC files a Petition for Approval of One Emergency Preparedness and Operations Reliability Standard EOP-008-1 and Retirement of One Existing Reliability Standard EOP-008-0.  Docket No. RM11-4-000​

2/11/2011
RM11-11-000
Petition for Approval of Critical Infrastructure Protection (CIP) Reliability Standards Version 4

NERC submits a Petition for Approval of Critical Infrastructure Protection (CIP) Reliability Standards Version 4, associated implementation plans, and VRFs and VSLs.  Docket No. RM11-11-000​

2/10/2011
RM10-8-000
Comments in Response to NOPR on Interpretations to IRO-005-1 and TOP-005-1

NERC submits comments in response to FERC's December 16, 2010 NOPR concerning interpretations to Reliability Standards IRO-005-1 and TOP-005-1.  Docket No. RM10-8-000​

2/7/2011
RR06-1-000, RR09-7-000
Informational Filing of NERC Analysis of NERC Standard Process Results Fourth Quarter 2010

NERC submits an informational filing, Analysis of NERC Standard Process Results Fourth Quarter 2010.  Docket No. RR06-1-000 and RR09-7-000​

1/31/2011
RM08-19-000, RD11-3-000
Petition for Approval of a Facilities Design, Connections, and Maintenance Reliability Standard

NERC submits a Petition for Approval of a Facilities Design, Connections, and Maintenance Reliability Standard FAC-013-2.  Docket Nos. RM08-19-000 and RD11-3-000​

1/28/2011
RM08-19-000
Letter to FERC Regarding WestConnect Utilities Request for Extension of Compliance Date and Request for Expedited Consideration

NERC submits a letter to FERC regarding the December 30th, 2010 Motion filed by WestConnect Utilities requesting and eighteen-month extension of time to become compliant with MOD Reliability Standards approved by the Commission in Order No. 729.  Docket No. RM08-19-000​

1/26/2011
RM10-15-000
Comments in Response to NOPR on Interconnection Reliability Operating Limits Reliability Standards

NERC submits comments in response to FERC's November 18, 2010 NOPR on Mandatory Reliability Standards for Interconnection Reliability Operating Limits.  Docket No. RM10-15-000​

1/24/2011
RM10-16-000
Comments of NERC in Response to NOPR on System Restoration Reliability Standards

NERC submits comments in response to Notice of Proposed Rulemaking on System Restoration Reliability Standards.  Docket No. RM10-16-000​

1/24/2011
RR10-13-002
Petition for Approval of Amendment to the 2011 Business Plan and Budget of Texas Reliability Entity, Inc.

NERC submitted a petition for approval of Amendment to the 2011 Business Plan and Budget of Texas Reliability Entity, Inc. and Amendment to Exhibit E to Delegation Agreement with Texas Reliability Entity, Inc.  Docket No. RR10-13-002​

1/24/2011
RM08-19-000
Comments Regarding the Request for Ext. of Compliance Date and Request for Expedited Consideration of the Westconnect Utilities

NERC files Comments Regarding the Request for Extension of Compliance Date and Request for Expedited Consideration of the Westconnect Utilities. Docket No. RM08-19-000​

1/14/2011
RM06-16-000
Petition for Approval of IRO-006-5 and IRO-006-EAST-1, Glossary Term, and Implementation Plan

NERC files a Petition for Approval of Proposed New Interconnection Reliability Operations and Coordination Reliability Standards, Glossary Term and Implementation Plan for IRO-006-5 and IRO-006-EAST-1.  Docket No. RM06-16-000​

1/13/2011
RM09-19-000
Comments on Notice of Proposed Rulemaking Regarding Regional Reliability Standard IRO-006-WECC-1

NERC submits comments in response to the October 21, 2010 NOPR regarding the Regional Reliability Standard IRO-006-WECC-1.  Docket No. RM09-19-000​

1/11/2011
RR09-6-000
Errata to January 10, 2011 Filing Regarding December 23, 2010 Compliance Filing Regarding Section 300 of NERC's Rules of Procedure

NERC submits an errata to the December 23, 2010 filing concerning Section 300 of NERC's Rules of Procedure.  Docket No. RR09-6-000​

1/11/2011
RR10-7-001, RR10-11-000
Compliance Filing in Response to FERC Orders on CMEP Agreements with SERC, FRCC, and SPP RE

NERC submits a Compliance Filing in Response to the July 12, 2010 and December 1, 2010 Commission Orders Relating to Compliance Monitoring and Enforcement Agreements Between SERC Reliability Corporation and Florida Reliability Coordinating Council and Southwest Power Pool Regional Entity and Related Amendments To Delegation Agreementsl.  Docket Nos. RR10-7-001 and RR10-11-000. ​

1/10/2011
RR09-6-003
Errata Filing to December 23, 2010 Compliance Filing Regarding the Standard Processes Manual

NERC submits an errata to the December 23, 2010 Compliance Filing in Response to the March 18, 2010 Commission Order Directing Revisions to the standards development procedure.  FERC Docket No. RR09-6-003​

1/10/2011
RM10-10-000
Motion to File Reply Comment and Reply Comments Regarding Comments Received on NOPR Regarding BAL-502-RFC-02

NERC submits a Motion for Leave to File Reply Comments and Reply Comments Regarding Comments Received on Notice of Proposed Rulemaking concerning the BAL-502-RFC-02 Reliability Standard.  Docket No. RM10-10-000

1/10/2011
RM08-11-002, RM08-11-003
Compliance Filing in Response to December 7, 2010 Order Approving NERC's May 29, 2010 and July 6, 2010 Compliance Filings

NERC submits a Compliance Filing in Response to December 7, 2010 Order Approving NERC’s May 29, 2010 and July 6, 2010 Compliance Filings in Response to Order No. 722 concerning FAC VSLs.  Docket Nos. Docket Nos. RM08-11-002, RM08-11-003​

1/6/2011
 

home | account log-in/register | legal and privacy/trademark policy | site map | careers | contact us

Atlanta Office | 3353 Peachtree Road, NE Suite 600 North Tower, Atlanta, GA 30326 | 404-446-2560
Washington Office | 1325 G Street, NW Suite 600, Washington, DC 20005| 202-400-3000

Copyright 2016 North American Electric Reliability Corporation. All rights reserved.