Event Summary
 
  FILE SAVED AS: ICTE_1330_20100129_1845.htm  
 
 Incident:   ICTE_1330_20100129_1845   Date:  01/29/2010   Reliability Coordinator:  ICTE 
 Initial Conditions:   N/A
 Flowgate:   1330 - McAdams500-230 for loss of McA...   Rating:  615   LODF:  46.65%
 TLR Direction:   Normal 
 Effective StartTime:   01/29/2010 18:45   Effective EndTime:  01/29/2010 23:35   TLR Duration:  4 Hours and 50 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Jan 29 
 18:36 
 TLR 4   CURRENT 
 1-NS 
 Total 
 1 / 0 
 1  /  0 
 11 
 122 
 1.0 
 1.0 
 11 
 11 
 1.0 
 1.0 
 0 
 0 
 0.0 
 0.0 
 NONE   NONE   417   654   510 N/A
 NEXT 
 1-NS 
 6-NN 
 Total 
 1 / 0 
 1 / 0 
 2  /  0 
 11 
 100 
 122 
 1.0 
 6.6 
 7.6 
 11 
 100 
 111 
 1.0 
 6.6 
 7.6 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE   NONE 
 Jan 29 
 19:26 
 TLR 4   CURRENT   NONE   NONE   NONE   405   650   526 N/A
 NEXT 
 6-NN 
 Total 
 1 / 0 
 1  /  0 
 154 
 154 
 15.8 
 15.8 
 154 
 154 
 15.8 
 15.8 
 0 
 0 
 0.0 
 0.0 
 NONE   NONE 
 Jan 29 
 20:28 
 TLR 1   CURRENT   NONE   NONE   NONE   370   560   409 N/A
 Jan 29 
 23:23 
 TLR 0   CURRENT   NONE   NONE   NONE   303   530   487 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   2   22   22   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   2   254   254   0 
 7   0   0   0   0 
 Total   4   276   276   0 
 

01/30/2010 00:34:46 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2010 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.