Event Summary
 
  FILE SAVED AS: ICTE_1345_20090420_1235.htm  
 
 Incident:   ICTE_1345_20090420_1235   Date:  04/20/2009   Reliability Coordinator:  ICTE 
 Initial Conditions:   N/A
 Flowgate:   1345 - Mabelvale-Bryant for the loss ...   Rating:  159   LODF:  11.48%
 TLR Direction:   Normal 
 Effective StartTime:   04/20/2009 12:35   Effective EndTime:  04/20/2009 14:00   TLR Duration:  1 Hour and 25 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Apr 20 
 12:22 
 TLR 4   CURRENT   NONE   NONE   NONE   0   0   0 N/A
 NEXT   NONE   NONE   NONE 
 Apr 20 
 12:45 
 TLR 5A   NEXT 
 7-F 
 Total 
 20 / 0 
 20  /  0 
 131 
 131 
 7.3 
 7.3 
 131 
 131 
 7.3 
 7.3 
 0 
 0 
 0.0 
 0.0 
 EES 
 Total 
 68.0 
 68.0 
 68.0 
 68.0 
 NONE   65   187   1063 N/A
 Apr 20 
 13:03 
 TLR 5A 
 PRELIM 
 NEXT 
 7-F 
 Total 
 15 / 0 
 15  /  0 
 33 
 33 
 1.9 
 1.9 
 0 
 0 
 0.0 
 0.0 
 0 
 0 
 0.0 
 0.0 
 EES 
 Total 
 20.0 
 20.0 
 68.0 
 68.0 
 NONE   65   187   1063 N/A
 Apr 20 
 13:33 
 TLR 0   CURRENT   NONE   NONE   NONE   59   165   924 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   0 
 7   35   164   131   0 
 Total   35   164   131   0 
 
TLR NNL Totals
 CA   NNL Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 EES   88.0   88.0 
 Total   88.0   88.0 
 

05/26/2009 13:14:23 (CST)