Event Summary |
FILE SAVED AS: MISO_15718_20090421_0700.htm
|
|
Incident:
|
MISO_15718_20090421_0700
|
Date: 04/21/2009
|
Reliability Coordinator: MISO
|
|
Initial Conditions:
|
N/A
|
|
Flowgate:
|
15718 - Adams - Beaver Creek 161kV (fl...
|
Rating: 0
|
LODF: 17.30%
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
04/21/2009 07:00
|
Effective EndTime: 04/21/2009 08:00
|
TLR Duration: 1 Hour and 0 Minutes
|
|
TLR Actions |
Apr 21 06:32
|
TLR 3A
|
NEXT
|
|
|
|
|
|
|
|
|
NONE
|
|
|
|
|
0
|
0
|
0
|
Apr 21 07:46
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
0
|
0
|
0
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
0 |
0 |
0 |
0 |
| 2 |
1 |
50 |
50 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
1 |
50 |
50 |
0 |
|
|
|
TLR Market Flow Totals |
| MISO |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.7 |
0.7 |
| FIRM-7 |
0.0 |
0.0 |
| Total for MISO |
0.7 |
0.7 |
| Total |
0.7 |
0.7 |
|
|
| |
|