Event Summary
 
  FILE SAVED AS: MISO_16089_20100114_1210.htm  
 
 Incident:   MISO_16089_20100114_1210   Date:  01/14/2010   Reliability Coordinator:  MISO 
 Initial Conditions:   flows increasing above schedule across B10T
 Flowgate:   16089 - McHenry-Velva 115kV (flo) Lela...   Rating:  120   LODF:  42.80%
 TLR Direction:   Normal 
 Effective StartTime:   01/14/2010 12:10   Effective EndTime:  01/14/2010 15:00   TLR Duration:  2 Hours and 50 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Jan 14 
 11:57 
 TLR 3A   NEXT 
 2-NH 
 Total 
 1 / 0 
 1  /  0 
 34 
 34 
 12.2 
 12.2 
 34 
 34 
 12.2 
 12.2 
 0 
 0 
 0.0 
 0.0 
 NONE   NONE   60   156   225 to TLR 3A
 Jan 14 
 12:29 
 TLR 3A   NEXT   NONE   NONE   NONE   0   0   0 N/A
 Jan 14 
 13:27 
 TLR 3A   NEXT   NONE   NONE   NONE   0   0   0 N/A
 Jan 14 
 14:32 
 TLR 0   CURRENT   NONE   NONE   NONE   0   0   0 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   1   34   34   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   0 
 7   0   0   0   0 
 Total   1   34   34   0 
 

01/14/2010 17:22:43 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2010 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.