| Event Summary |
FILE SAVED AS: MISO_3665_20110721_1900.htm
|
|
Incident:
|
MISO_3665_20110721_1900
|
Date: 07/21/2011 (CST)
|
Reliability Coordinator: MISO
|
|
Initial Conditions:
|
N/A
|
|
Flowgate:
|
3665 - W Lafayette-Cumberland 138kV (...
|
Rating: 0
|
LODF: 43.21%
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
07/21/2011 19:00 (CST)
|
Effective EndTime: 07/21/2011 19:40 (CST)
|
TLR Duration: 40 Minutes
|
|
TLR Actions |
Jul 21
18:31 (CST)
|
TLR 3A
|
NEXT
|
NONE
|
NONE
|
|
|
MISO
|
|
PJM
|
|
MISO
|
|
PJM
|
|
MISO
|
|
PJM
|
|
|
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
5.0
|
|
5.0
|
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
5.0
|
|
5.0
|
|
0
|
0
|
0
|
Jul 21
19:27 (CST)
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
0
|
0
|
0
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
0 |
0 |
0 |
0 |
| 2 |
0 |
0 |
0 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
0 |
0 |
0 |
0 |
|
|
|
TLR Market Flow Totals |
| MISO |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total MISO |
0.0 |
0.0 |
| PJM |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
5.0 |
5.0 |
| Total for PJM |
5.0 |
5.0 |
| Total |
5.0 |
5.0 |
|
|
| |