FILE SAVED AS: MISO_6002_20100113_1300.htm
|
|
Incident:
|
MISO_6002_20100113_1300
|
Date: 01/13/2010
|
Reliability Coordinator: MISO
|
|
Initial Conditions:
|
N/A
|
|
Flowgate:
|
6002 - MHEX_S
|
Rating: 0
|
LODF: N/A
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
01/13/2010 13:00
|
Effective EndTime: 01/13/2010 14:00
|
TLR Duration: 1 Hour and 0 Minutes
|
|
TLR Actions |
Jan 13 12:31
|
TLR 3A
|
NEXT
|
|
|
|
|
|
|
|
|
NONE
|
|
|
|
|
0
|
N/A
|
N/A
|
Jan 13 13:28
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
0
|
N/A
|
N/A
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
0 |
0 |
0 |
0 |
| 2 |
0 |
0 |
0 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
1 |
6 |
6 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
1 |
6 |
6 |
0 |
|
|
|
TLR Market Flow Totals |
| MISO |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total for MISO |
0.0 |
0.0 |
| Total |
0.0 |
0.0 |
|
|
| |
|