Event Summary |
FILE SAVED AS: SWPP_15622_20090421_1645.htm
|
|
Incident:
|
SWPP_15622_20090421_1645
|
Date: 04/21/2009
|
Reliability Coordinator: SWPP
|
|
Initial Conditions:
|
load increasing
|
|
Flowgate:
|
15622 - Temp14 Randall-Palo Duro 115kV...
|
Rating: 109
|
LODF: 20.44%
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
04/21/2009 16:45
|
Effective EndTime: 04/21/2009 20:45
|
TLR Duration: 4 Hours and 0 Minutes
|
|
TLR Actions |
Apr 21 16:36
|
TLR 3B
|
CURRENT
|
NONE
|
NONE
|
|
|
|
|
49
|
86
|
183
|
|
NEXT
|
NONE
|
NONE
|
|
|
|
|
Apr 21 17:30
|
TLR 3A
|
NEXT
|
NONE
|
NONE
|
|
|
|
|
49
|
85
|
180
|
Apr 21 18:28
|
TLR 3A
|
NEXT
|
NONE
|
NONE
|
|
|
|
|
48
|
84
|
177
|
Apr 21 19:29
|
TLR 3A
|
NEXT
|
NONE
|
NONE
|
|
|
|
|
46
|
79
|
164
|
Apr 21 20:33
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
42
|
71
|
143
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
0 |
0 |
0 |
0 |
| 2 |
0 |
0 |
0 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
0 |
0 |
0 |
0 |
|
|
|
TLR Market Flow Totals |
| SWPP |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total for SWPP |
0.0 |
0.0 |
| Total |
0.0 |
0.0 |
|
|
| |
|