Event Summary
 
  FILE SAVED AS: SWPP_15622_20090423_0800.htm  
 
 Incident:   SWPP_15622_20090423_0800   Date:  04/23/2009   Reliability Coordinator:  SWPP 
 Initial Conditions:   Increasing Flows
 Flowgate:   15622 - Temp14 Randall-Palo Duro 115kV...   Rating:  109   LODF:  20.45%
 TLR Direction:   Normal 
 Effective StartTime:   04/23/2009 08:00   Effective EndTime:  04/23/2009 16:25   TLR Duration:  8 Hours and 25 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Apr 23 
 07:28 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 54   92   189 N/A
 Apr 23 
 08:32 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 42   71   146 N/A
 Apr 23 
 09:28 
 TLR 5A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 FIRM-CREDIT 
 Total 
 SWPP 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 12.0 
 0.0 
 12.0 
 0.0 
 0.0 
 12.0 
 0.0 
 12.0 
 43   73   147 Feasiability
 Apr 23 
 10:28 
 TLR 5A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 FIRM-CREDIT 
 Total 
 SWPP 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 13.0 
 0.0 
 13.0 
 0.0 
 0.0 
 13.0 
 0.0 
 13.0 
 40   67   133 N/A
 Apr 23 
 11:27 
 TLR 5A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 FIRM-CREDIT 
 Total 
 SWPP 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 16.0 
 0.0 
 16.0 
 0.0 
 0.0 
 16.0 
 0.0 
 16.0 
 42   71   144 N/A
 Apr 23 
 12:27 
 TLR 5A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 FIRM-CREDIT 
 Total 
 SWPP 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 16.0 
 0.0 
 16.0 
 0.0 
 0.0 
 16.0 
 0.0 
 16.0 
 41   70   142 N/A
 Apr 23 
 13:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 10.0 
 0.0 
 10.0 
 0.0 
 10.0 
 0.0 
 10.0 
 37   63   131 N/A
 Apr 23 
 14:33 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 4.0 
 0.0 
 4.0 
 0.0 
 4.0 
 0.0 
 4.0 
 33   56   113 N/A
 Apr 23 
 15:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 3.0 
 0.0 
 3.0 
 0.0 
 3.0 
 0.0 
 3.0 
 29   49   98 N/A
 Apr 23 
 16:12 
 TLR 0   CURRENT   NONE   NONE   NONE   29   48   96 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   0 
 7   0   0   0   0 
 Total   0   0   0   0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 SWPP   ED-2   0.0   0.0 
 ED-6   17.0   17.0 
 FIRM-7   57.0   57.0 
 Total for SWPP   74.0   74.0 
 Total   74.0   74.0 
 

04/23/2009 16:13:30 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2009 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.