Event Summary
 
  FILE SAVED AS: SWPP_16017_20100122_0640.htm  
 
 Incident:   SWPP_16017_20100122_0640   Date:  01/22/2010   Reliability Coordinator:  SWPP 
 Initial Conditions:   increasing load
 Flowgate:   16017 - Temporary 5 - Tolk - Tuco 230k...   Rating:  351   LODF:  23.36%
 TLR Direction:   Normal 
 Effective StartTime:   01/22/2010 06:40   Effective EndTime:  01/22/2010 14:35   TLR Duration:  7 Hours and 55 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Jan 22 
 06:26 
 TLR 3B   CURRENT 
 1-NS 
 6-NN 
 Total 
 1 / 0 
 1 / 0 
 2  /  0 
 50 
 10 
 60 
 6.3 
 1.6 
 7.8 
 50 
 10 
 60 
 6.3 
 1.6 
 7.8 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 9.0 
 0.0 
 9.0 
 0.0 
 9.0 
 0.0 
 9.0 
 275   349   321 N/A
 NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 Jan 22 
 07:26 
 TLR 3A   NEXT 
 6-NN 
 Total 
 1 / 0 
 1  /  0 
 5 
 5 
 0.8 
 0.8 
 5 
 5 
 0.8 
 0.8 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 9.3 
 0.0 
 9.3 
 0.0 
 9.3 
 0.0 
 9.3 
 257   326   296 N/A
 Jan 22 
 08:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 274   345   304 N/A
 Jan 22 
 09:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 273   342   296 N/A
 Jan 22 
 10:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 3.0 
 0.0 
 3.0 
 0.0 
 3.0 
 0.0 
 3.0 
 270   340   300 N/A
 Jan 22 
 11:25 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 235   311   328 N/A
 Jan 22 
 12:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 196   269   315 N/A
 Jan 22 
 13:28 
 TLR 3A   NEXT 
 6-NN 
 Total 
 1 / 0 
 1  /  0 
 10 
 10 
 1.6 
 1.6 
 10 
 10 
 1.6 
 1.6 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 21.0 
 0.0 
 21.0 
 0.0 
 21.0 
 0.0 
 21.0 
 231   302   305 N/A
 Jan 22 
 14:22 
 TLR 0   CURRENT   NONE   NONE   NONE   215   284   296 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   1   50   50   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   3   25   25   0 
 7   0   0   0   0 
 Total   4   75   75   0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 SWPP   ED-2   0.0   0.0 
 ED-6   42.3   42.3 
 FIRM-7   0.0   0.0 
 Total for SWPP   42.3   42.3 
 Total   42.3   42.3 
 

01/22/2010 14:24:27 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2010 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.