Event Summary
 
  FILE SAVED AS: SWPP_16045_20091231_2315.htm  
 
 Incident:   SWPP_16045_20091231_2315   Date:  12/31/2009   Reliability Coordinator:  SWPP 
 Initial Conditions:   loading
 Flowgate:   16045 - Temporary 26 - Neosho-Columbus...   Rating:  215   LODF:  11.46%
 TLR Direction:   Normal 
 Effective StartTime:   12/31/2009 23:15   Effective EndTime:  01/01/2010 10:20   TLR Duration:  11 Hours and 5 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Dec 31 
 23:05 
 TLR 3B   CURRENT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 162   204   368 N/A
 NEXT 
 6-NN 
 Total 
 0 / 1 
 0  /  1 
 0 
 0 
 0.0 
 0.0 
 0 
 0 
 0.0 
 0.0 
 10 
 10 
 0.6 
 0.6 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 Jan 01 
 00:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 20.0 
 0.0 
 20.0 
 0.0 
 20.0 
 0.0 
 20.0 
 146   185   347 N/A
 Jan 01 
 01:28 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 18.0 
 0.0 
 18.0 
 0.0 
 18.0 
 0.0 
 18.0 
 167   203   321 N/A
 Jan 01 
 02:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 13.0 
 0.0 
 13.0 
 0.0 
 13.0 
 0.0 
 13.0 
 163   195   284 N/A
 Jan 01 
 03:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 23.0 
 0.0 
 23.0 
 0.0 
 23.0 
 0.0 
 23.0 
 163   197   299 N/A
 Jan 01 
 04:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 14.0 
 0.0 
 14.0 
 0.0 
 14.0 
 0.0 
 14.0 
 163   197   298 N/A
 Jan 01 
 05:34 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 157   185   251 N/A
 Jan 01 
 06:28 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 28.0 
 0.0 
 28.0 
 0.0 
 28.0 
 0.0 
 28.0 
 174   202   245 N/A
 Jan 01 
 07:28 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 13.0 
 0.0 
 13.0 
 0.0 
 13.0 
 0.0 
 13.0 
 180   211   271 N/A
 Jan 01 
 08:31 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 30.0 
 0.0 
 30.0 
 0.0 
 30.0 
 0.0 
 30.0 
 173   202   258 N/A
 Jan 01 
 09:32 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 172   199   241 N/A
 Jan 01 
 10:08 
 TLR 0   CURRENT   NONE   NONE   NONE   148   174   234 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   10 
 7   0   0   0   0 
 Total   0   0   0   10 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 SWPP   ED-2   0.0   0.0 
 ED-6   159.0   159.0 
 FIRM-7   0.0   0.0 
 Total for SWPP   159.0   159.0 
 Total   159.0   159.0 
 

01/01/2010 10:09:31 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2010 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.