Event Summary
 
  FILE SAVED AS: SWPP_16045_20100124_0855.htm  
 
 Incident:   SWPP_16045_20100124_0855   Date:  01/24/2010   Reliability Coordinator:  SWPP 
 Initial Conditions:   increasing load
 Flowgate:   16045 - Temporary 26 - Neosho-Columbus...   Rating:  215   LODF:  12.02%
 TLR Direction:   Normal 
 Effective StartTime:   01/24/2010 08:55   Effective EndTime:  01/24/2010 18:45   TLR Duration:  9 Hours and 50 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Jan 24 
 08:43 
 TLR 3B   CURRENT 
 6-NN 
 Total 
 1 / 0 
 1  /  0 
 20 
 40 
 2.2 
 2.2 
 20 
 20 
 2.2 
 2.2 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 167   198   265 N/A
 NEXT 
 6-NN 
 Total 
 1 / 0 
 1  /  0 
 80 
 40 
 8.7 
 8.7 
 80 
 80 
 8.7 
 8.7 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 Jan 24 
 09:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 160   194   288 N/A
 Jan 24 
 10:26 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 159   192   275 N/A
 Jan 24 
 11:26 
 TLR 3A   NEXT 
 6-NN 
 Total 
 1 / 0 
 1  /  0 
 10 
 10 
 1.4 
 1.4 
 10 
 10 
 1.4 
 1.4 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 153   182   246 N/A
 Jan 24 
 12:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 160   192   271 N/A
 Jan 24 
 13:29 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 156   186   252 N/A
 Jan 24 
 14:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 154   183   243 N/A
 Jan 24 
 15:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 141   163   189 N/A
 Jan 24 
 16:27 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 141   161   169 N/A
 Jan 24 
 17:29 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 143   160   148 N/A
 Jan 24 
 18:29 
 TLR 0   CURRENT   NONE   NONE   NONE   149   162   116 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   3   110   110   0 
 7   0   0   0   0 
 Total   3   110   110   0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 SWPP   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for SWPP   0.0   0.0 
 Total   0.0   0.0 
 

01/24/2010 18:50:12 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2010 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.