Event Summary |
FILE SAVED AS: SWPP_5196_20100120_0325.htm
|
|
Incident:
|
SWPP_5196_20100120_0325
|
Date: 01/20/2010
|
Reliability Coordinator: SWPP
|
|
Initial Conditions:
|
load increasing
|
|
Flowgate:
|
5196 - SPS North - South
|
Rating: 680
|
LODF: N/A
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
01/20/2010 03:25
|
Effective EndTime: 01/20/2010 04:35
|
TLR Duration: 1 Hour and 10 Minutes
|
|
TLR Actions |
Jan 20 03:15
|
TLR 3B
|
CURRENT
|
NONE
|
NONE
|
|
|
|
|
679
|
N/A
|
N/A
|
|
NEXT
|
NONE
|
NONE
|
|
|
|
|
Jan 20 04:23
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
584
|
N/A
|
N/A
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
0 |
0 |
0 |
0 |
| 2 |
0 |
0 |
0 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
0 |
0 |
0 |
0 |
|
|
|
TLR Market Flow Totals |
| SWPP |
ED-2 |
0.0 |
0.0 |
| ED-6 |
40.0 |
40.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total for SWPP |
40.0 |
40.0 |
| Total |
40.0 |
40.0 |
|
|
| |
|