Event Summary |
FILE SAVED AS: SWPP_5203_20090421_1505.htm
|
|
Incident:
|
SWPP_5203_20090421_1505
|
Date: 04/21/2009
|
Reliability Coordinator: SWPP
|
|
Initial Conditions:
|
load increasing
|
|
Flowgate:
|
5203 - HppValPitVal
|
Rating: 315
|
LODF: 24.81%
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
04/21/2009 15:05
|
Effective EndTime: 04/21/2009 15:50
|
TLR Duration: 45 Minutes
|
|
TLR Actions |
Apr 21 14:48
|
TLR 3A
|
NEXT
|
|
|
|
|
|
|
|
|
NONE
|
|
|
|
|
192
|
291
|
400
|
Apr 21 15:41
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
188
|
279
|
369
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
2 |
50 |
50 |
0 |
| 2 |
3 |
81 |
81 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
5 |
131 |
131 |
0 |
|
|
|
TLR Market Flow Totals |
| SWPP |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total for SWPP |
0.0 |
0.0 |
| Total |
0.0 |
0.0 |
|
|
| |
|