Event Summary
 
  FILE SAVED AS: SWPP_5203_20090421_1505.htm  
 
 Incident:   SWPP_5203_20090421_1505   Date:  04/21/2009   Reliability Coordinator:  SWPP 
 Initial Conditions:   load increasing
 Flowgate:   5203 - HppValPitVal   Rating:  315   LODF:  24.81%
 TLR Direction:   Normal 
 Effective StartTime:   04/21/2009 15:05   Effective EndTime:  04/21/2009 15:50   TLR Duration:  45 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
 Apr 21 
 14:48 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 Total 
 2 / 0 
 3 / 0 
 5  /  0 
 50 
 81 
 131 
 3.1 
 10.1 
 13.2 
 50 
 81 
 131 
 3.1 
 10.1 
 13.2 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 SWPP 
 SWPP 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 192   291   400 N/A
 Apr 21 
 15:41 
 TLR 0   CURRENT   NONE   NONE   NONE   188   279   369 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   2   50   50   0 
 2   3   81   81   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   0 
 7   0   0   0   0 
 Total   5   131   131   0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 SWPP   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for SWPP   0.0   0.0 
 Total   0.0   0.0 
 

04/21/2009 15:50:34 (CST)
 OATI IDC Support Phone: 763-201-2010    Fax: 763-553-2813
Copyright 2009 - Interchange Distribution Calculator (OATI IDC) - Open Access Technology International, Inc. All Rights Reserved.