Event Summary |
FILE SAVED AS: SWPP_5247_20100131_1515.htm
|
|
Incident:
|
SWPP_5247_20100131_1515
|
Date: 01/31/2010
|
Reliability Coordinator: SWPP
|
|
Initial Conditions:
|
limit reduced due to 345 kv outage
|
|
Flowgate:
|
5247 - SPPSPSTIES
|
Rating: 165
|
LODF: N/A
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
01/31/2010 15:15
|
Effective EndTime: 01/31/2010 15:40
|
TLR Duration: 25 Minutes
|
|
TLR Actions |
Jan 31 14:58
|
TLR 3A
|
NEXT
|
NONE
|
NONE
|
|
|
|
|
242
|
N/A
|
N/A
|
Jan 31 15:27
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
159
|
N/A
|
N/A
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
0 |
0 |
0 |
0 |
| 2 |
0 |
0 |
0 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
0 |
0 |
0 |
0 |
|
|
|
TLR Market Flow Totals |
| SWPP |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total for SWPP |
0.0 |
0.0 |
| Total |
0.0 |
0.0 |
|
|
| |
|