| Event Summary |
FILE SAVED AS: SWPP_6152_20110902_1500.htm
|
|
Incident:
|
SWPP_6152_20110902_1500
|
Date: 09/02/2011 (CST)
|
Reliability Coordinator: SWPP
|
|
Initial Conditions:
|
increasing load
|
|
Flowgate:
|
6152 - St. Joe-Midway 161kV flo Fairp...
|
Rating: 171
|
LODF: 13.37%
|
|
TLR Direction:
|
Normal
|
|
Effective StartTime:
|
09/02/2011 15:00 (CST)
|
Effective EndTime: 09/02/2011 15:30 (CST)
|
TLR Duration: 30 Minutes
|
|
TLR Actions |
Sep 02
14:41 (CST)
|
TLR 3A
|
NEXT
|
|
|
|
|
|
|
|
|
NONE
|
|
|
MISO
|
|
SWPP
|
|
MISO
|
|
SWPP
|
|
MISO
|
|
SWPP
|
|
|
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
0.0
|
|
117
|
151
|
259
|
Sep 02
15:20 (CST)
|
TLR 0
|
CURRENT
|
NONE
|
NONE
|
NONE
|
113
|
147
|
257
|
|
|
|
TLR Schedule Totals |
| 0 |
0 |
0 |
0 |
0 |
| 1 |
2 |
10 |
10 |
0 |
| 2 |
1 |
25 |
25 |
0 |
| 3 |
0 |
0 |
0 |
0 |
| 4 |
0 |
0 |
0 |
0 |
| 5 |
0 |
0 |
0 |
0 |
| 6 |
0 |
0 |
0 |
0 |
| 7 |
0 |
0 |
0 |
0 |
| Total |
3 |
35 |
35 |
0 |
|
|
|
TLR Market Flow Totals |
| MISO |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total MISO |
0.0 |
0.0 |
| SWPP |
ED-2 |
0.0 |
0.0 |
| ED-6 |
0.0 |
0.0 |
| FIRM-7 |
0.0 |
0.0 |
| Total for SWPP |
0.0 |
0.0 |
| Total |
0.0 |
0.0 |
|
|
| |