Event Summary
 
  FILE SAVED AS: SWPP_6152_20110902_1500.htm  
 
 Incident:   SWPP_6152_20110902_1500   Date:  09/02/2011 (CST)   Reliability Coordinator:  SWPP 
 Initial Conditions:   increasing load
 Flowgate:   6152 - St. Joe-Midway 161kV flo Fairp...   Rating:  171   LODF:  13.37%
 TLR Direction:   Normal 
 Effective StartTime:   09/02/2011 15:00 (CST)   Effective EndTime:  09/02/2011 15:30 (CST)   TLR Duration:  30 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Sep 02 
14:41 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 Total 
 2 / 0 
 1 / 0 
 3  /  0 
 10 
 25 
 35 
 0.5 
 1.3 
 1.8 
 10 
 25 
 35 
 0.5 
 1.3 
 1.8 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 117   151   259 N/A
Sep 02 
15:20 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   113   147   257 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   2   10   10   0 
 2   1   25   25   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   0 
 7   0   0   0   0 
 Total   3   35   35   0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total MISO   0.0   0.0 
 SWPP   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for SWPP   0.0   0.0 
 Total   0.0   0.0