DOCUMENT TITLE |
DATE |
DEPARTMENT |
| EEA 3 Report - Lafayette Utilities System (06/30/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/09/09) |
07.13.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (10/05/09) |
10.14.08 |
Events Analysis |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (Alberta) |
05.13.09 |
About NERC |
| Informational Filing of 2010 Development Plan Pursuant to Section 310 of The NERC Rules of Procedure |
12.02.09 |
About NERC |
| 1. General Counsel Memorandum |
05.05.10 |
Programs |
| 1. General Counsel Memorandum |
05.05.10 |
Programs |
| 1. Summary of Proposed Rule Changes |
03.16.10 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (Alberta) |
05.13.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (British Columbia) |
05.05.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (Manitoba) |
05.05.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (National Energy Board) |
05.05.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (New Brunswick) |
05.05.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (Ontario) |
05.05.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (Quebec) |
05.05.09 |
About NERC |
| 15 Reliability Standards That Contain Errata Changes (Saskatchewan) |
05.05.09 |
About NERC |
| 1989 Geomagnetic Disturbance |
08.01.90 |
Assessments & Trends |
| 1992 System Disturbances |
09.19.92 |
Events Analysis |
| 1993 System Disturbances |
09.19.93 |
Events Analysis |
| 1994 System Disturbances |
09.19.94 |
Events Analysis |
| 1995 System Disturbances |
09.19.95 |
Events Analysis |
| 1996 System Disturbances |
10.14.96 |
Events Analysis |
| 1997 System Disturbances |
04.26.97 |
Events Analysis |
| 1997-2001 Generating Availability Report |
03.19.03 |
Assessments & Trends |
| 1998 System Disturbances |
05.16.98 |
Events Analysis |
| 1998-2002 Generating Availability Report |
10.17.03 |
Assessments & Trends |
| 1999 System Disturbances |
03.27.99 |
Events Analysis |
| 1999-2003 Generating Availability Report |
01.26.05 |
Assessments & Trends |
| 1999-2003 Generating Unit Statistical Brochure - All Units Reporting |
01.25.05 |
Assessments & Trends |
| 1999-2003 Generating Unit Statistical Brochure - Units Reporting Events |
01.25.05 |
Assessments & Trends |
| 2. Industry Phasor Data Sharing Agreement Form |
05.05.10 |
Programs |
| 2. Redlined Text of Proposed Changes to Rules of Procedure |
03.16.10 |
About NERC |
| 2. Researchers Phasor Data Sharing Agreement Form |
05.05.10 |
Programs |
| 2000 NERC Compliance Enforcement Program |
11.10.00 |
Compliance |
| 2000 System Disturbances |
09.28.00 |
Events Analysis |
| 2000-2004 Generating Availability Report |
10.31.05 |
Assessments & Trends |
| 2000-2004 Generating Unit Statistical Brochure - All Units Reporting |
09.23.05 |
Assessments & Trends |
| 2000-2004 Generating Unit Statistical Brochure - Units Reporting Events |
09.23.05 |
Assessments & Trends |
| 2001 NERC Compliance Enforcement Program |
04.05.02 |
Compliance |
| 2001 System Disturbances |
04.22.01 |
Events Analysis |
| 2001-2005 Generating Availability Report |
12.01.06 |
Assessments & Trends |
| 2001-2005 Generating Unit Statistical Brochure - All Units Reporting |
11.20.06 |
Assessments & Trends |
| 2001-2005 Generating Unit Statistical Brochure - Units Reporting Events |
11.20.06 |
Assessments & Trends |
| 2002 NERC Compliance Enforcement Program |
05.07.03 |
Compliance |
| 2002 System Disturbances |
08.18.02 |
Events Analysis |
| 2002-2006 Generating Availability Report |
12.01.07 |
Assessments & Trends |
| 2002-2006 Generating Unit Statistical Brochure - All Units Reporting |
11.11.07 |
Assessments & Trends |
| 2002-2006 Generating Unit Statistical Brochure - Units Reporting Events |
11.07.07 |
Assessments & Trends |
| 2003 Generating Unit Statistical Brochure - All Units Reporting |
01.25.05 |
Assessments & Trends |
| 2003 Generating Unit Statistical Brochure - Units Reporting Events |
01.25.05 |
Assessments & Trends |
| 2003 Long-Term Reliability Assessment |
12.23.03 |
Assessments & Trends |
| 2003 NERC Compliance Enforcement Program |
05.19.04 |
Compliance |
| 2003 Summer Assessment |
05.15.03 |
Assessments & Trends |
| 2003 System Disturbances |
02.20.03 |
Events Analysis |
| 2003-2007 Generating Availability Report |
03.26.09 |
Assessments & Trends |
| 2003-2007 Generating Unit Statistical Brochure - All Units Reporting (Revised 04/09) |
04.14.09 |
Assessments & Trends |
| 2003-2007 Generating Unit Statistical Brochure - Units Reporting Events (Revised 04/09) |
04.14.09 |
Assessments & Trends |
| 2003/2004 Winter Assessment |
11.13.02 |
Assessments & Trends |
| 2004 Generating Unit Statistical Brochure - All Units Reporting |
09.23.05 |
Assessments & Trends |
| 2004 Generating Unit Statistical Brochure - Units Reporting Events |
09.23.05 |
Assessments & Trends |
| 2004 Long-Term Reliability Assessment |
09.09.04 |
Assessments & Trends |
| 2004 NERC Compliance Enforcement Program |
05.24.05 |
Compliance |
| 2004 Summer Assessment |
04.11.04 |
Assessments & Trends |
| 2004 System Disturbances |
02.20.04 |
Events Analysis |
| 2004-2008 Generating Availability Report |
08.25.09 |
Assessments & Trends |
| 2004-2008 Generating Unit Statistical Brochure - All Units Reporting |
08.25.09 |
Assessments & Trends |
| 2004-2008 Generating Unit Statistical Brochure - Units Reporting Events |
08.25.09 |
Assessments & Trends |
| 2004/2005 Winter Assessment |
10.18.04 |
Assessments & Trends |
| 2005 Generating Unit Statistical Brochure - All Units Reporting |
11.20.06 |
Assessments & Trends |
| 2005 Generating Unit Statistical Brochure - Units Reporting Events |
11.20.06 |
Assessments & Trends |
| 2005 Long-Term Reliability Assessment |
09.01.05 |
Assessments & Trends |
| 2005 NERC Compliance Enforcement Program |
07.31.06 |
Compliance |
| 2005 Summer Assessment |
05.19.05 |
Assessments & Trends |
| 2005 System Disturbances |
02.20.05 |
Events Analysis |
| 2005-2008 Generating Unit Statistical Brochure - Units Reporting Events |
07.30.10 |
Assessments & Trends |
| 2005-2009 Generating Availability Report |
08.02.10 |
Assessments & Trends |
| 2005-2009 Generating Unit Statistical Brochure - All Units Reporting |
07.30.10 |
Assessments & Trends |
| 2005/2006 Winter Assessment |
10.21.05 |
Assessments & Trends |
| 2006 Generating Unit Statistical Brochure - All Units Reporting |
11.07.07 |
Assessments & Trends |
| 2006 Generating Unit Statistical Brochure - Units Reporting Events |
11.07.07 |
Assessments & Trends |
| 2006 Long-Term Reliability Assessment |
10.16.06 |
Assessments & Trends |
| 2006 NERC Compliance Enforcement Program |
06.06.07 |
Compliance |
| 2006 Summer Assessment |
05.15.06 |
Assessments & Trends |
| 2006 System Disturbances |
02.20.06 |
Events Analysis |
| 2006/2007 Winter Assessment |
11.16.06 |
Assessments & Trends |
| 2007 Audit Schedule |
09.22.08 |
Compliance |
| 2007 Compliance and Enforcement Program Requirements and Implementation Process (RFC) |
12.12.05 |
Compliance |
| 2007 Compliance Enforcement Plan (SERC) |
11.30.06 |
Compliance |
| 2007 Compliance Enforcemnt Program Implementation Plan (WECC) |
12.22.06 |
Compliance |
| 2007 Compliance Monitoring and Enforcement Program (FRCC) |
12.08.06 |
Compliance |
| 2007 Compliance Monitoring and Enforcement Program Implementation Plan (NPCC) |
02.08.07 |
Compliance |
| 2007 Generating Unit Statistical Brochure - All Units Reporting (Revised 04/09) |
04.14.09 |
Assessments & Trends |
| 2007 Generating Unit Statistical Brochure - Units Reporting Events (Revised 04/09) |
04.14.09 |
Assessments & Trends |
| 2007 Long-Term Reliability Assessment |
10.16.07 |
Assessments & Trends |
| 2007 NERC Compliance Enforcement Program |
07.01.08 |
Compliance |
| 2007 Regional Compliance Monitoring and Enforcement Implementation Plan (MRO) |
07.12.07 |
Compliance |
| 2007 Regional Compliance Plan (SPP) |
02.13.07 |
Compliance |
| 2007 Summer Assessment |
05.18.07 |
Assessments & Trends |
| 2007 System Disturbances |
01.30.07 |
Events Analysis |
| 2007/2008 Winter Assessment |
11.19.07 |
Assessments & Trends |
| 2008 Annual Report |
05.06.09 |
About NERC |
| 2008 Audit Schedule |
10.17.08 |
Compliance |
| 2008 CMEP Reporting Requirements |
09.26.07 |
Compliance |
| 2008 Compliance Monitoring and Enforcement Program Annual Plan (SERC) |
12.31.07 |
Compliance |
| 2008 Compliance Monitoring and Enforcement Program Implementation Plan (FRCC) |
12.31.07 |
Compliance |
| 2008 Compliance Monitoring and Enforcement Program Implementation Plan (RFC) |
11.01.07 |
Compliance |
| 2008 Compliance Monitoring and Enforcement Program Implementation Plan (WECC) |
11.01.06 |
Compliance |
| 2008 Compliance Monitoring and Enforcement Program Manual (SPP) |
01.01.08 |
Compliance |
| 2008 Generating Unit Statistical Brochure - All Units Reporting |
08.25.09 |
Assessments & Trends |
| 2008 Generating Unit Statistical Brochure - Units Reporting Events |
08.25.09 |
Assessments & Trends |
| 2008 Implementation of NERC Compliance Monitoring and Enforcement Program (NPCC) |
10.29.07 |
Compliance |
| 2008 Implementation Plan |
09.26.07 |
Compliance |
| 2008 Long-Term Reliability Assessment |
10.31.08 |
About NERC |
| 2008 Long-Term Reliability Assessment |
03.26.09 |
Assessments & Trends |
| 2008 NERC Compliance Enforcement Program |
08.13.09 |
Compliance |
| 2008 Regional Compliance Monitoring and Enforcement Implementation Plan (MRO) |
12.04.07 |
Compliance |
| 2008 Regional Implementation Plan to Monitor and Enforce Compliance with NERC Reliability Standards (TRE) |
11.01.07 |
Compliance |
| 2008 Summer Assessment |
05.14.08 |
Assessments & Trends |
| 2008-RTA-007 Process Bulletin - Registered Entity Submission of Violation Statements |
08.09.10 |
Compliance |
| 2008-RTA-008 Process Bulletin - NERC Requirements - Electronically-Submitted CMEP Materials |
08.09.10 |
Compliance |
| 2008/2009 Winter Assessment |
11.18.08 |
Assessments & Trends |
| 2009 Annual Report |
05.01.10 |
About NERC |
| 2009 Audit Schedule |
11.29.09 |
Compliance |
| 2009 CE Provider User Guide |
01.30.09 |
Programs |
| 2009 CMEP Reliability Standards - Version 1.2 |
01.05.09 |
Compliance |
| 2009 Data - GADS Data Reporting Honor Roll |
04.07.10 |
Assessments & Trends |
| 2009 Generating Unit Statistical Brochure - All Units Reporting |
07.30.10 |
Assessments & Trends |
| 2009 Generating Unit Statistical Brochure - Units Reporting Events |
07.30.10 |
Assessments & Trends |
| 2009 Implementation Plan |
10.01.08 |
Compliance |
| 2009 Long-Term Reliability Assessment |
10.29.09 |
Assessments & Trends |
| 2009 Scenario Reliability Assessment |
10.29.09 |
Assessments & Trends |
| 2009 Summer Assessment |
05.19.09 |
Assessments & Trends |
| 2009 System Disturbances |
06.15.10 |
Events Analysis |
| 2009-2011 Reliability Standards Development Plan |
02.03.09 |
About NERC |
| 2009-2011 Standards Development Plan (Alberta) |
05.13.09 |
About NERC |
| 2009-2011 Standards Development Plan (British Columbia) |
05.05.09 |
About NERC |
| 2009-2011 Standards Development Plan (Manitoba) |
05.05.09 |
About NERC |
| 2009-2011 Standards Development Plan (National Energy Board) |
05.05.09 |
About NERC |
| 2009-2011 Standards Development Plan (New Brunswick) |
05.05.09 |
About NERC |
| 2009-2011 Standards Development Plan (Ontario) |
05.05.09 |
About NERC |
| 2009-2011 Standards Development Plan (Quebec) |
05.05.09 |
About NERC |
| 2009-2011 Standards Development Plan (Saskatchewan) |
05.05.09 |
About NERC |
| 2009-CAG-001 Process Bulletin - Regional Self-Certifications |
05.26.10 |
Compliance |
| 2009-CAG-002 Process Bulletin - Compliance Audit Certification Letter |
05.26.10 |
Compliance |
| 2009-CAG-003 Process Bulletin - Regional Compliance Auditor Training Requirements |
07.06.10 |
Compliance |
| 2009-CAG-004 Process Bulletin - Extension of Self-Certification Deadlines |
05.26.10 |
Compliance |
| 2009/2010 Winter Assessment |
11.24.09 |
Assessments & Trends |
| 2010 Actively Monitored Reliability Standards |
05.05.10 |
Compliance |
| 2010 Audit Schedule |
08.10.10 |
Compliance |
| 2010 Implementation Plan |
10.01.09 |
Compliance |
| 2010 NERC Performance Goals and Objectives |
03.01.10 |
About NERC |
| 2010 Special Reliability Scenario Assessment: Potential Reliability Impacts of Swift Demand Growth After a Long-Term Recession |
08.02.10 |
Assessments & Trends |
| 2010 Summer Assessment |
05.26.10 |
Assessments & Trends |
| 2010-2012 Reliability Standards Development Plan - Volume I, II, III |
05.24.10 |
Standards |
| 2010-2012 Reliability Standards Development Plan Volume I, II, and III |
10.22.09 |
Standards |
| 2010-CAG-001 Process Directive - Regional Entity Compliance Audit Report Processing |
05.26.10 |
Compliance |
| 2010-CAG-001 Process Directive - Regional Entity Compliance Audit Report Processing (Templates Only) |
05.26.10 |
Compliance |
| 2011-2013 Reliability Standards Development Plan |
08.17.10 |
Standards |
| 2011-2013 Reliability Standards Development Plan |
08.24.10 |
About NERC |
| 3. Appendix A - Data Recipient Protection and Confidentiality Acknowledgment |
05.05.10 |
Programs |
| 3. Appendix R1 - Researcher Confidentiality and Data Protection Statement |
05.05.10 |
Programs |
| 3. Redlined Text of Proposed Changes to Appendix 4A |
03.16.10 |
About NERC |
| 4. Contact Information Form |
05.05.10 |
Programs |
| 4. Contact Information Form |
05.05.10 |
Programs |
| 4. Redlined Text of Proposed Changes to Appendix 4B |
03.16.10 |
About NERC |
| 5. Redlined Text of Proposed Changes to Appendix 4C |
03.16.10 |
About NERC |
| 706B Implementation Plan Purpose |
03.08.10 |
Compliance |
| About NERC & Reliability Standards |
07.01.08 |
About NERC |
| About the Compliance & Enforcement Program |
06.02.08 |
Compliance |
| Active Standards Work Plan Cross Reference - Sorted by Project Number |
08.17.10 |
Standards |
| Active Standards Work Plan Cross Reference - Sorted by Standard |
08.17.10 |
Standards |
| Additional Compliance Filing in Response to October 18, 2007 Order |
04.01.09 |
About NERC |
| Additional Compliance Filing of the NERC in Response to October 18, 2007 Order |
04.01.08 |
About NERC |
| Adequate Level of Reliability |
03.18.10 |
Standards |
| Administrative Assistant to Chief Security Officer (CSO) |
07.23.10 |
About NERC |
| Agenda for Workshop on Delegation Agreements |
10.26.09 |
About NERC |
| Aggregated Actual and Forecast Demands and Net Energy for Load |
11.24.08 |
Compliance |
| Aggregated Actual and Forecast Demands and Net Energy for Load |
10.29.08 |
Standards |
| Agreement between NERC, NPCC and Regie de l'energie |
05.08.09 |
About NERC |
| Amended and Restated Delegation Agreement between NERC and Texas Reliability Entity, Inc. - Effective July 1, 2010 |
06.03.10 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (Alberta) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (British Columbia) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (Manitoba) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (NEB) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (New Brunswick) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (Nova Scotia) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (Ontario) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (Quebec) |
04.18.07 |
About NERC |
| Amendment to Application for Recognition of Reliability Standards (Saskatchewan) |
04.18.07 |
About NERC |
| Amendment to March 3, 2008 Compliance Filing to Include Complete Copy of Exhibit A |
03.04.08 |
About NERC |
| Analysis and Documentation of Underfrequency Load Shedding |
01.13.10 |
Compliance |
| Analysis and Documentation of Underfrequency Load Shedding Performance Following an Underfrequency Event |
02.02.05 |
Standards |
| Analysis and Mitigation of Transmission and Generation Protection System Misoperations |
02.07.06 |
Standards |
| Analysis and Mitigation of Transmission and Generation Protection System Misoperations |
11.02.09 |
Compliance |
| Analysis and Mitigation of Transmission and Generation Protection System Misoperations |
08.05.10 |
Standards |
| Analysis and Repair of Power Line Carriers |
04.14.10 |
About NERC |
| Annex 1 to the NERC Confidentiality Agreement for Electric System Operating Reliability Data -- Version 3 |
05.06.09 |
About NERC |
| Annex 2 to the NERC Confidentiality Agreement for Electric System Operating Reliability Data -- Version 3 |
05.06.09 |
About NERC |
| Announcement: Comment Period Open for Development Plan 2010-2012 |
08.28.09 |
Standards |
| Answer and Answer of NERC to Comments on Compliance Filing in Response to December 19, 2008 Order |
03.18.09 |
About NERC |
| Answer to U.S. Department of Energy's Motion for Stay |
10.22.09 |
About NERC |
| APPA Comments |
05.29.09 |
About NERC |
| Appendix A - Change in Unit Status Report Form |
12.02.09 |
Assessments & Trends |
| Appendix B1 - Component Cause Codes - Fossil Steam |
12.02.09 |
Assessments & Trends |
| Appendix B2 - Component Cause Codes - Fluidized Bed |
12.02.09 |
Assessments & Trends |
| Appendix B3 - Component Cause Codes - Nuclear |
12.02.09 |
Assessments & Trends |
| Appendix B4 - Component Cause Codes - Diesel |
12.02.09 |
Assessments & Trends |
| Appendix B5 - Component Cause Codes - Hydro/Pumped Storage |
12.02.09 |
Assessments & Trends |
| Appendix B6 - Component Cause Codes - Gas Turbine |
12.02.09 |
Assessments & Trends |
| Appendix B7 - Component Cause Codes - Jet Engine |
12.02.09 |
Assessments & Trends |
| Appendix B8 - Component Cause Codes - Combined Cycle or Co-Generation Blocks |
12.02.09 |
Assessments & Trends |
| Appendix B9 - Component Cause Codes - Geothermal |
12.02.09 |
Assessments & Trends |
| Appendix C - Utility and Unit Identification Codes |
12.02.09 |
Assessments & Trends |
| Appendix D - List of Major Components |
12.02.09 |
Assessments & Trends |
| Appendix E - Unit Design Data - Introduction |
12.02.09 |
Assessments & Trends |
| Appendix E1 - Unit Design Data - Fossil Steam |
12.02.09 |
Assessments & Trends |
| Appendix E2 - Unit Design Data - Fluidized Bed Combustion |
12.02.09 |
Assessments & Trends |
| Appendix E3 - Unit Design Data - Nuclear |
12.02.09 |
Assessments & Trends |
| Appendix E4 - Unit Design Data - Diesel |
12.02.09 |
Assessments & Trends |
| Appendix E5 - Unit Design Data - Hydro/Pumped Storage |
12.02.09 |
Assessments & Trends |
| Appendix E6 - Unit Design Data - Gas Turbine or Jet Engine |
12.02.09 |
Assessments & Trends |
| Appendix E7 - Unit Design Data - Combined Cycle or Co-Generation Blocks |
12.02.09 |
Assessments & Trends |
| Appendix E8 - Unit Design Data - Miscellaneous |
12.02.09 |
Assessments & Trends |
| Appendix F - Performance Indices and Equations |
12.02.09 |
Assessments & Trends |
| Appendix G - Examples and Recommended Methods |
12.02.09 |
Assessments & Trends |
| Appendix H - GADS Failure Mechanism Codes |
12.02.09 |
Assessments & Trends |
| Appendix I - GADS Data Release Guidelines |
12.02.09 |
Assessments & Trends |
| Appendix J - Cause Code Amplification Codes |
12.02.09 |
Assessments & Trends |
| Appendix K - Outside Plant Management Control |
12.02.09 |
Assessments & Trends |
| Appendix L1 - Calculating Combined Cycle and Co-generation Block Data |
12.02.09 |
Assessments & Trends |
| Appendix L2 - Calculating Combined Cycle and Co-generation Block Data |
12.02.09 |
Assessments & Trends |
| Appendix M - Differences Between GADS and ISO Data Collection System |
12.02.09 |
Assessments & Trends |
| Applicability of Federal Power Act Section 215 |
05.18.07 |
About NERC |
| Application for Approval of Reliability Standards of the North American Electric Reliability Corporation (Nova Scotia) |
06.30.10 |
About NERC |
| Application for Recognition as the ERO (Alberta) |
04.04.06 |
About NERC |
| Application for Recognition as the ERO (NEB) |
04.04.06 |
About NERC |
| Application for Recognition as the ERO (Nova Scotia) |
04.04.06 |
About NERC |
| Application for Recognition as the ERO (Ontario) |
04.04.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (Alberta) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (British Columbia) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (Manitoba) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (NEB) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (New Brunswick) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (Nova Scotia) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (Ontario) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (Quebec) |
09.11.06 |
About NERC |
| Application for Recognition of Proposed Reliability Standards (Saskatchewan) |
09.11.06 |
About NERC |
| Application for Recognition of Reliability Standards (Alberta) |
04.04.06 |
About NERC |
| Application for Recognition of Reliability Standards (NEB) |
04.04.06 |
About NERC |
| Application for Recognition of Reliability Standards (Nova Scotia) |
04.04.06 |
About NERC |
| Application for Recognition of Reliability Standards (Ontario) |
04.04.06 |
About NERC |
| Application to Become an Approved CE Provider |
12.24.09 |
Programs |
| Approval of Amendments to the NERC Bylaws (Alberta) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (British Columbia) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (Manitoba) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (National Energy Board) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (New Brunswick) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (Nova Scotia) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (Ontario) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (Quebec) |
08.19.08 |
About NERC |
| Approval of Amendments to the NERC Bylaws (Saskatchewan) |
08.19.08 |
About NERC |
| Approval of an Amendment to the 2008 Business Plan and Budget of the WECC |
02.15.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Alberta) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (British Columbia) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Manitoba) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (NB) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (NEB) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Nova Scotia) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Ontario) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Quebec) |
08.04.08 |
About NERC |
| Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Saskatchewan) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Alberta) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (British Columbia) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Manitoba) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (NB) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (NEB) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Nova Scotia) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Ontario) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Quebec) |
08.04.08 |
About NERC |
| Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Saskatchewan) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Regional Standard BAL-004-WECC-01 (Alberta) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Regional Standard BAL-004-WECC-01 (British Columbia) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Regional Standard BAL-004-WECC-01 (NEB) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Reliability Standard PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Reliability Standard PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 |
11.02.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-002-WECC-1 (Alberta) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-002-WECC-1 (British Columbia) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-002-WECC-1 (National Energy Board) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (Alberta) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (British Columbia) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (Manitoba) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (National Energy Board) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (New Brunswick) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (Ontario) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (Quebec) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard BAL-004-1 (Saskatchewan) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (Alberta) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (British Columbia) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (Manitoba) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (National Energy Board) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (New Brunswick) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (Ontario) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (Quebec) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard IRO-006-4 (Saskatchewan) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (Alberta) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (British Columbia) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (Manitoba) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (National Energy Board) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (New Brunswick) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (Ontario) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (Quebec) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard MOD-004-1 (Saskatchewan) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (Alberta) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (British Columbia) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (Manitoba) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (NB) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (NEB) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (Nova Scotia) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (Ontario) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (Quebec) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard PRC-023-1 (Saskatchewan) |
08.04.08 |
About NERC |
| Approval of Petition for Proposed Standard TOP-007-WECC-1 (Alberta) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard TOP-007-WECC-1 (British Columbia) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard TOP-007-WECC-1 (National Energy Board) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard WECC Tier Standards (Alberta) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard WECC Tier Standards (British Columbia) |
04.07.09 |
About NERC |
| Approval of Petition for Proposed Standard WECC Tier Standards (National Energy Board) |
04.07.09 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Alberta) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (British Columbia) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Manitoba) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (NEB) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (New Brunswick) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Nova Scotia) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Ontario) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Quebec) |
11.27.07 |
About NERC |
| Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Saskatchewan) |
11.27.07 |
About NERC |
| Approved CE Provider Renewal Application |
07.06.07 |
Programs |
| Approved Errata Procedure |
01.15.10 |
Standards |
| April 14, 2009 Meeting Agenda Package |
04.13.09 |
Standards |
| April 23-24, 2007 in San Diego, CA |
08.20.07 |
Standards |
| April 27, 2009 Meeting Agenda Package |
04.27.09 |
Standards |
| April 29-30, 2008 in San Diego, CA |
05.16.08 |
Standards |
| April 6-7, 2005 in Atlanta, Georgia |
04.11.05 |
Standards |
| Area Interchange Methodology |
08.26.08 |
Standards |
| Assessment of the 1999 NERC "Pilot" Compliance Program |
11.17.99 |
Compliance |
| Assessment of the Design and Effectiveness of UVLS Program |
11.02.09 |
Compliance |
| Assuring Consistency of Entity Underfrequency Load Shedding Programs |
02.02.05 |
Standards |
| Assuring Consistency of Entity Underfrequency Load Shedding Programs with Regional Reliability Organ |
01.13.10 |
Compliance |
| ATC Comments |
05.29.09 |
About NERC |
| Audit Report - Alabama Electric Cooperative, Inc. (11/29/07) |
11.29.07 |
Compliance |
| Audit Report - Montana - Dakota Utilities (08/11/09 - 08/12/09) |
09.02.10 |
Compliance |
| Audit Report - Power and Water Resources Pooling Authority (03/03/09) |
07.16.09 |
Compliance |
| Audit Guide for Providers |
11.10.08 |
Programs |
| Audit of Regional Entity Compliance Programs |
01.18.07 |
About NERC |
| Audit Report - Arthur Kill Power LLC (03/14/08 - 03/25/08) |
03.14.08 |
Compliance |
| Audit Report - Calpine Energy Services (08/24/09 - 09/15/09) |
12.22.09 |
Compliance |
| Audit Report - City of Roseville (03/17/08 - 03/18/08) |
06.29.10 |
Compliance |
| Audit Report - Del Ranch, LP (06/23/08) |
11.21.08 |
Compliance |
| Audit Report - ACE Cogeneration Company (04/08/10) |
06.14.10 |
Compliance |
| Audit Report - Adams Rural Electric Cooperative, Inc. (04/02/08 - 04/08/08) |
02.19.09 |
Compliance |
| Audit Report - AES Huntington Beach LLC (07/30/08) |
03.29.10 |
Compliance |
| Audit Report - AES Redondo Beach LLC (06/04/08) |
05.17.10 |
Compliance |
| Audit Report - AES Thames LLC (03/18/08 - 04/04/08) |
03.18.08 |
Compliance |
| Audit Report - Air Liquide Large Industires US LP (09/24/08 - 09/25/08) |
12.04.08 |
Compliance |
| Audit Report - Alabama Municipal Electric Authority (11/13/07) |
11.13.07 |
Compliance |
| Audit Report - Alcoa Power Generating, Inc - Yadkin Division (09/08/08 - 09/10/08) |
05.05.10 |
Compliance |
| Audit Report - Alcoa Power Generating, Inc. - Tapoco Division (09/08/08 - 09/10/08) |
05.05.10 |
Compliance |
| Audit Report - Alcoa Power Marketing, LLC (04/07/10) |
07.01.10 |
Compliance |
| Audit Report - Allegheny Electric Cooperative, Inc. (04/05/10 - 04/16/10) |
06.28.10 |
Compliance |
| Audit Report - Alliant Energy (12/12/07 - 12/13/07) |
12.12.07 |
Compliance |
| Audit Report - Altura Cogen, LLC (08/13/08 - 08/14/08) |
11.04.08 |
Compliance |
| Audit Report - Ameren - Illinois, Ameren - Missouri and Ameren Services Company |
12.18.08 |
Compliance |
| Audit Report - AmerGen Energy Company, LLC (08/18/08 - 08/20/08) |
12.16.08 |
Compliance |
| Audit Report - American Bituminous Power Partners, LP (03/16/09 - 03/24/09) |
05.05.09 |
Compliance |
| Audit Report - American Electric Power Energy Partners (03/16/10 - 03/18/10) |
05.11.10 |
Compliance |
| Audit Report - American Electric Power Service Corp. (03/16/10 - 03/18/10) |
05.11.10 |
Compliance |
| Audit Report - American Electric Power Service Corp. (06/19/07 -06/20/07) |
06.19.07 |
Compliance |
| Audit Report - American Electric Power Service Corp. (09/22/09 - 09/24/09) |
12.22.09 |
Compliance |
| Audit Report - American PowerNet Management LP (06/14/10 - 06/15/10) |
07.21.10 |
Compliance |
| Audit Report - American Transmission Company (12/03/07 - 12/05/07) |
12.03.07 |
Compliance |
| Audit Report - ANP Bellingham Energy Company, LLC (02/28/08 - 03/24/08) |
02.28.08 |
Compliance |
| Audit Report - ANP Blackstone Energy Company (02/22/08 - 02/29/08) |
02.22.08 |
Compliance |
| Audit Report - ANP Funding, 1 LLC (02/22/08 - 03/05/08) |
02.22.08 |
Compliance |
| Audit Report - ANP Funding, LLC (05/05/09 - 05/07/09) |
07.28.09 |
Compliance |
| Audit Report - APS Energy Services (03/18/08) |
10.16.08 |
Compliance |
| Audit Report - ArcLight Energy Marketing, LLC (05/21/08) |
11.14.08 |
Compliance |
| Audit Report - Arkansas Electric Cooperative Corporation (04/01/08 - 04/03/08) |
04.01.08 |
Compliance |
| Audit Report - Associated Electric Cooperative Inc. (06/19/07) |
03.17.10 |
Compliance |
| Audit Report - Associated Electric Cooperative, Inc. (09/22/08 - 09/25/08) |
01.08.09 |
Compliance |
| Audit Report - Astoria Energy LLC (02/24/09 - 03/10/09) |
10.02.09 |
Compliance |
| Audit Report - Astoria Gas Turbine (03/12/08 - 03/25/08) |
03.12.08 |
Compliance |
| Audit Report - Astoria Generating Company, L.P. (03/17/08 - 03/20/08) |
03.17.08 |
Compliance |
| Audit Report - Atlantic City Electric (05/20/08 - 05/22/08) |
10.20.08 |
Compliance |
| Audit Report - Atlantic Municipal Utilities (07/20/09 - 07/31/09) |
09.25.09 |
Compliance |
| Audit Report - Avista Corporation (07/09/07 - 07/11/07) |
05.10.10 |
Compliance |
| Audit Report - Baconton Power LLC (09/25/07) |
09.25.07 |
Compliance |
| Audit Report - Bandera Electric CO OP (08/20/08 - 08/21/08) |
10.29.08 |
Compliance |
| Audit Report - Bangor Hydro Electric Company (12/09/08 - 12/22/08) |
01.20.09 |
Compliance |
| Audit Report - Barclays Bank PLC (02/23/09 - 04/07/09) |
10.02.09 |
Compliance |
| Audit Report - Barclays Bank, PLC (03/19/08) |
10.16.08 |
Compliance |
| Audit Report - Basin Electric Power Cooperative (10/22/09 - 10/23/09) |
06.14.10 |
Compliance |
| Audit Report - Bastrop Energy Partners (01/23/08) |
01.23.08 |
Compliance |
| Audit Report - Bayswater Peaking Facility (09/03/08 - 10/16/08) |
12.08.08 |
Compliance |
| Audit Report - Bear Swamp Power Company, LLC (04/07/08 - 04/30/08) |
11.14.08 |
Compliance |
| Audit Report - Benton Rural Electric Association (11/03/09) |
06.24.10 |
Compliance |
| Audit Report - Berkshire Power Company LLC (01/20/10 - 02/18/10) |
04.06.10 |
Compliance |
| Audit Report - Bethpage Energy Center 3, LLC (04/17/08 - 04/22/08) |
10.28.08 |
Compliance |
| Audit Report - BG Dighton Power LLC (04/21/08 - 05/09/08) |
10.28.08 |
Compliance |
| Audit Report - Big Brown Power Company LLC (06/15/10 - 06/17/10) |
08.18.10 |
Compliance |
| Audit Report - Big Rivers Electric Corporation (11/10/08 - 11/11/08) |
03.10.09 |
Compliance |
| Audit Report - Black Hills Wyoming, Inc (06/17/09) |
05.05.10 |
Compliance |
| Audit Report - Black Oak Energy, LLC (04/28/08 - 05/30/08) |
10.28.08 |
Compliance |
| Audit Report - Black River Generation, LLC (05/09/08 - 05/22/08) |
10.28.08 |
Compliance |
| Audit Report - Bluebonnet Electric Co Op Inc. (01/21/09 - 01/22/09) |
04.10.09 |
Compliance |
| Audit Report - Boston Generating Company, LLC (05/10/08 - 05/14/08) |
10.28.08 |
Compliance |
| Audit Report - Boylston Municipal Light Department (03/06/09 - 03/24/09) |
10.02.09 |
Compliance |
| Audit Report - BP Energy Company (03/31/08) |
10.20.08 |
Compliance |
| Audit Report - BP Energy Company (05/19/08 - 06/02/08) |
10.28.08 |
Compliance |
| Audit Report - Braintree Electric Light Department (05/26/08 - 07/09/08) |
10.28.08 |
Compliance |
| Audit Report - Brazos Electric Power Co Op, Inc. (02/27/10 - 02/28/10) |
04.27.10 |
Compliance |
| Audit Report - Brazos Electric Power Coop. (9/13/07) |
09.13.07 |
Compliance |
| Audit Report - Brick Power Holdings LLC (02/27/09 - 04/10/09) |
10.14.09 |
Compliance |
| Audit Report - Brooklyn Navy Yard Cogeneration Partners LP (03/16/09 - 03/30/09) |
10.02.09 |
Compliance |
| Audit Report - Brownsville Public Utility Board (01/28/09 - 01/29/09) |
04.20.09 |
Compliance |
| Audit Report - Brownsville Public Utility Board AEP (02/02/10 - 02/04/10) |
08.18.10 |
Compliance |
| Audit Report - Brownsville Publicd Utility Board (02/02/10 - 02/04/10) |
04.28.10 |
Compliance |
| Audit Report - Bryan Municipal Utilities (05/04/09 - 05/07/09) |
07.08.09 |
Compliance |
| Audit Report - Bryan Texas Utilities (06/25/08 - 06/26/08) |
04.28.09 |
Compliance |
| Audit Report - BTU QSE Services Inc. (01/16/08) |
04.27.10 |
Compliance |
| Audit Report - Bucksport Energy LLC (09/29/08 - 10/08/08) |
12.08.08 |
Compliance |
| Audit Report - Burlington Electric Department (06/11/08 - 06/24/08) |
10.28.08 |
Compliance |
| Audit Report - Cabrillo Power I, LLC (02/09/10) |
04.29.10 |
Compliance |
| Audit Report - Cabrillo Power II, LLC (02/10/10) |
06.24.10 |
Compliance |
| Audit Report - Caithness Long Island, LLC (02/03/10) |
04.06.10 |
Compliance |
| Audit Report - CalPeak Power Panoche, LLC (03/05/09) |
09.02.10 |
Compliance |
| Audit Report - Calpine Corporation (06/09/08) |
06.04.10 |
Compliance |
| Audit Report - Calpine Corporation (08/24/09 - 09/15/09) |
12.22.09 |
Compliance |
| Audit Report - Calpine Corporation (CC) (02/10/09 - 02/26/09) |
05.10.09 |
Compliance |
| Audit Report - Calpine Energy Services (02/19/09 - 02/26/09) |
05.05.09 |
Compliance |
| Audit Report - Calpine Energy Services (09/02/08 - 09/30/08) |
11.13.08 |
Compliance |
| Audit Report - Calpine Energy Services and Calpine Corp. (06/09/08 - 06/12/08) |
03.11.10 |
Compliance |
| Audit Report - Calpine Power Management (03/18/09 - 03/20/09) |
06.08.09 |
Compliance |
| Audit Report - CAMS Mackinaw Power & Mackinaw Power LLC (05/14/08 - 05/15/08) |
03.17.10 |
Compliance |
| Audit Report - Capital District Energy Center Cogeneration (06/26/08 - 07/09/08) |
10.28.08 |
Compliance |
| Audit Report - Cargill Power Market, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Cargill Power Market, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Cargill Power Markets, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Cargill Power Markets, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Cargill Power Markets, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Cargill Power Markets, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Cargill Power Markets, LLC (03/05/09) |
04.06.09 |
Compliance |
| Audit Report - Carthage Water & Electric Plant (04/15/10) |
06.11.10 |
Compliance |
| Audit Report - Castleton Power, LLC (03/03/10 - 03/12/10) |
04.06.10 |
Compliance |
| Audit Report - CenterPoint Energy Houston Electric LLC (07/08/09 - 07/09/09) |
09.30.09 |
Compliance |
| Audit Report - Central Electric Coop/PNGC (03/12/08 - 03/13/08) |
10.20.08 |
Compliance |
| Audit Report - Central Hudson Gas & Electric Corporation (07/07/08 - 08/07/08) |
10.28.08 |
Compliance |
| Audit Report - Central Maine Power Co. (10/02/07) |
10.02.07 |
Compliance |
| Audit Report - Central Maine Power Company (09/14/09 - 09/17/09) |
01.12.10 |
Compliance |
| Audit Report - Central Minnesota Municipal Power Agency (08/26/08 - 08/27/08) |
10.10.08 |
Compliance |
| Audit Report - Central Vermont Public Service (11/06/07 -11/07/07) |
11.06.07 |
Compliance |
| Audit Report - Chicopee Municipal Lighting Plant (07/14/08 - 08/12/08) |
10.28.08 |
Compliance |
| Audit Report - Citigroup (07/25/08 - 08/27/08) |
10.28.08 |
Compliance |
| Audit Report - Citigroup Energy Inc. (04/02/08 - 04/04/08) |
08.04.08 |
Compliance |
| Audit Report - Citigroup Energy, Inc. (03/03/09) |
07.16.09 |
Compliance |
| Audit Report - Citizen's Electric Company of Lewisburg, PA (05/04/09 - 05/11/09) |
05.29.09 |
Compliance |
| Audit Report - City of Abbeville (04/13/10) |
06.11.10 |
Compliance |
| Audit Report - City of Alexandria, Louisiana (07/08/08 - 07/09/08) |
01.08.09 |
Compliance |
| Audit Report - City of Ames Electric Services (02/01/10 - 02/04/10) |
03.16.10 |
Compliance |
| Audit Report - City of Anaheim (03/11/08 - 03/12/08) |
10.16.08 |
Compliance |
| Audit Report - City of Austin DBA Austin Energy (01/30/08) |
01.30.08 |
Compliance |
| Audit Report - City of Banning (03/03/09) |
07.16.09 |
Compliance |
| Audit Report - City of Burbank Q1 (03/10/08 - 03/12/08) |
07.26.10 |
Compliance |
| Audit Report - City of Burbank Q2 (06/11/08) |
07.26.10 |
Compliance |
| Audit Report - City of College Station (05/21/08 - 05/22/08) |
08.21.08 |
Compliance |
| Audit Report - City of Columbia, Missouri (06/21/07) |
03.17.10 |
Compliance |
| Audit Report - City of Columbus, Ohio, Dept of Public Utilities (10/14/08 - 10/17/08) |
01.27.09 |
Compliance |
| Audit Report - City of Dalton d/b/a/ Dalton Utilities (05/13/08 - 5/14/08) |
11.14.08 |
Compliance |
| Audit Report - City of Ellensburg (03/08/10) |
04.29.10 |
Compliance |
| Audit Report - City of Fort Collins (03/18/08) |
10.16.08 |
Compliance |
| Audit Report - City of Garland (04/06/10 - 04/08/10) |
06.22.10 |
Compliance |
| Audit Report - City of Garland (07/06/07) |
07.06.07 |
Compliance |
| Audit Report - City of Garland (QSE) (01/08/08) |
01.08.08 |
Compliance |
| Audit Report - City of Georgetown (04/22/09 - 04/23/09) |
07.16.09 |
Compliance |
| Audit Report - City of Healdsburg ((11/05/09) |
05.11.10 |
Compliance |
| Audit Report - City of Idaho Falls (06/16/08) |
04.08.10 |
Compliance |
| Audit Report - City of Idaho Falls Electric Light Divsion (03/11/08 - 03/12/08) |
06.04.10 |
Compliance |
| Audit Report - City of Marshall, MI (04/02/08 - 04/04/08) |
10.21.08 |
Compliance |
| Audit Report - City of Orrville, Ohio (09/03/08 - 09/09/08) |
12.08.08 |
Compliance |
| Audit Report - City of Painesville (5/28/08 - 5/30/08) |
09.15.08 |
Compliance |
| Audit Report - City of Palo Alto (09/30/08) |
06.04.10 |
Compliance |
| Audit Report - City of Radford VA (04/02/08 - 04/04/08) |
10.29.08 |
Compliance |
| Audit Report - City of Riverside Public Utilities (08/18/09 - 08/19/09) |
05.17.10 |
Compliance |
| Audit Report - City of Roseville (06/17/08) |
03.29.10 |
Compliance |
| Audit Report - City of San Antonio Public Service (03/05/08 - 03/06/08) |
03.05.08 |
Compliance |
| Audit Report - City of Shasta Lake (03/09/10) |
05.14.10 |
Compliance |
| Audit Report - City of Shelby (09/02/08 - 09/12/08) |
03.04.09 |
Compliance |
| Audit Report - City of Springfield, IL (03/30/09 - 04/0/09) |
08.29.09 |
Compliance |
| Audit Report - City of St. George (08/20/09 -08/21/09) |
05.25.10 |
Compliance |
| Audit Report - City of St. Mary's (09/09/08 - 09/12/08) |
10.21.08 |
Compliance |
| Audit Report - City of Westerville Electric Division (10/17/08 - 10/23/08) |
01.27.09 |
Compliance |
| Audit Report - City Power Marketing, LLC (10/13/08 - 10/17/08) |
01.19.09 |
Compliance |
| Audit Report - City Utilities of Springfield Missouri (05/13/08 - 05/15/08) |
11.14.08 |
Compliance |
| Audit Report - City Water & Light of Jonesboro, Arkansas (06/24/08 - 06/31/08) |
01.08.09 |
Compliance |
| Audit Report - Clearview Electric Inc (03/20/09 - 05/14/09) |
10.14.09 |
Compliance |
| Audit Report - Clearwater Power Company (03/11/09) |
04.28.10 |
Compliance |
| Audit Report - CMEEC Bozrah Light and Power Company (08/13/08 - 09/02/08) |
10.28.08 |
Compliance |
| Audit Report - CMEEC Groton Utilities (08/18/08 - 09/02/08) |
10.28.08 |
Compliance |
| Audit Report - Cogen Technologies Linden Venture, L.P. (09/23/08 - 10/02/08) |
11.14.08 |
Compliance |
| Audit Report - Coleto Creek Power LP (02/12/08 -02/14/08) |
02.12.08 |
Compliance |
| Audit Report - Colorado Energy Management - BCM (03/13/09) |
05.17.10 |
Compliance |
| Audit Report - Colorado Energy Management - BIV (03/15/09) |
05.14.09 |
Compliance |
| Audit Report - Colorado Energy Management - CPP (03/13/09) |
05.17.10 |
Compliance |
| Audit Report - Colorado Energy Management - RMP (03/26/09) |
05.14.09 |
Compliance |
| Audit Report - Colorado Energy Management - SJC (03/25/09) |
05.05.09 |
Compliance |
| Audit Report - Colorado Green Holdings, LLC (04/20/10) |
07.30.10 |
Compliance |
| Audit Report - Columbia River People's Utility District (03/12/09) |
05.17.10 |
Compliance |
| Audit Report - Connecticut Jet Power (09/29/08 - 10/25/08) |
12.30.08 |
Compliance |
| Audit Report - Connecticut Light & Power Co. (12/03/08 - 12/11/08) |
01.20.09 |
Compliance |
| Audit Report - Connecticut Municipal Electric Energy (08/05/08 - 09/03/08) |
10.28.08 |
Compliance |
| Audit Report - Connecticut Resources Recovery Authority (09/23/08 - 10/30/08) |
12.30.08 |
Compliance |
| Audit Report - Consolidated Edison Co. of New York, Inc. (08/21/07) |
08.21.07 |
Compliance |
| Audit Report - Consolidated Edison Energy Inc. (04/03/09 - 04/14/09) |
10.02.09 |
Compliance |
| Audit Report - Consolidated Edison of NY (03/30/09 - 04/06/09) |
10.02.09 |
Compliance |
| Audit Report - Consolidated Edison Solutions Inc (04/03/09 - 04/14/09) |
10.14.09 |
Compliance |
| Audit Report - Consolidated Electric Cooperative Inc. (04/05/10 - 04/16/10) |
06.09.10 |
Compliance |
| Audit Report - Constellation Energy Commodities (03/31/09 - 04/02/09) |
06.23.09 |
Compliance |
| Audit Report - Constellation Energy Commodities Group (12/1/08 - 12/05/08) |
01.21.09 |
Compliance |
| Audit Report - Constellation Energy Commodities Group Maine, LLC (11/24/08 - 12/17/08) |
01.20.09 |
Compliance |
| Audit Report - Constellation Energy Commodities Group, Inc. (04/06/10 - 04/16/10) |
06.28.10 |
Compliance |
| Audit Report - Constellation New Energy, Inc. (04/06/10 - 04/16/10) |
06.28.10 |
Compliance |
| Audit Report - Constellation NewEnergy, Inc. (12/03/08 - 12/12/08) |
01.20.09 |
Compliance |
| Audit Report - Consumer's Power Inc. (06/16/09) |
08.02.10 |
Compliance |
| Audit Report - Continental Divide Electric Cooperative (03/18/08) |
10.16.08 |
Compliance |
| Audit Report - Corn Belt Power Cooperative (03/26/08 -03/27/08) |
03.26.08 |
Compliance |
| Audit Report - Coso Energy Developers (03/04/09) |
07.28.09 |
Compliance |
| Audit Report - Cottonwood Energy LP (10/30/07) |
03.17.10 |
Compliance |
| Audit Report - Covanta Delaware (04/07/20 - 04/23/10) |
07.21.10 |
Compliance |
| Audit Report - Covanta Essex (04/07/10 - 04/23/10) |
07.21.10 |
Compliance |
| Audit Report - Covanta Mid-Conn, Inc. (03/27/09 - 05/27/09) |
07.17.09 |
Compliance |
| Audit Report - Covanta Niagra, LP (03/30/09 - 05/27/09) |
07.17.09 |
Compliance |
| Audit Report - Covanta Onondaga, LP (04/06/09 - 05/27/09) |
07.17.09 |
Compliance |
| Audit Report - Covanta SEMASS, LLC (04/08/09 - 05/27/09) |
07.17.09 |
Compliance |
| Audit Report - CPS Energy (05/19/09 - 05/21/09) |
08.12.09 |
Compliance |
| Audit Report - Craven County Wood Energy, LP (11/06/07) |
03.17.10 |
Compliance |
| Audit Report - Crockett Cogeneration (06/18/08) |
05.20.10 |
Compliance |
| Audit Report - Crockett Cogeneration, a California Limited Partnership (08/18/09) |
05.17.10 |
Compliance |
| Audit Report - Cross Sound Cable Company LLC (04/27/09 - 05/08/09) |
10.14.09 |
Compliance |
| Audit Report - DAI Oildale Inc. (03/27/09) |
04.08.10 |
Compliance |
| Audit Report - Dairyland Power Cooperative (01/30/08 - 01/31/08) |
03.08.10 |
Compliance |
| Audit Report - Danvers Electric Division (05/11/09 - 05/15/09) |
10.14.09 |
Compliance |
| Audit Report - DB Energy Trading, LLC (08/25/09 - 08/28/09) |
10.14.09 |
Compliance |
| Audit Report - DC Energy, LLC (10/21/08) |
12.01.08 |
Compliance |
| Audit Report - Delmarva Power & Light Company (05/20/08 - 05/22/08) |
10.20.08 |
Compliance |
| Audit Report - Denton Municipal Electric (07/10/07) |
04.27.10 |
Compliance |
| Audit Report - Denver City Energy Associates, LP (08/24/09 - 08/25/09) |
11.29.09 |
Compliance |
| Audit Report - Desert Sky Wind Farm, LP (05/04/10 - 05/06/10) |
07.30.10 |
Compliance |
| Audit Report - Detroit Lakes Public Utilities (03/01/10 - 03/05/10) |
04.22.10 |
Compliance |
| Audit Report - Devon Power LLC (05/25/09 - 06/11/09) |
07.20.09 |
Compliance |
| Audit Report - Direct Energy Business LLC (08/24/09 - 09/04/09) |
12.22.09 |
Compliance |
| Audit Report - Direct Energy LP (04/29/08 - 04/30/08) |
02.04.09 |
Compliance |
| Audit Report - Direct Energy Marketing Inc. (06/01/09 - 06/19/09) |
01.13.10 |
Compliance |
| Audit Report - Dixie Escalante Rural Electric Association, Inc. (02/25/10) |
06.24.10 |
Compliance |
| Audit Report - Dominion Energy Brayton Point, LLC (10/24/08 - 11/21/08) |
12.30.08 |
Compliance |
| Audit Report - Dominion Energy Kewaunee, Inc. (05/10/10 - 05/26/10) |
07.30.10 |
Compliance |
| Audit Report - Dominion Energy Manchester Street Inc. (10/24/08 - 11/21/08) |
12.30.08 |
Compliance |
| Audit Report - Dominion Energy Marketing Inc. (10/24/08 - 11/10/08) |
02.04.09 |
Compliance |
| Audit Report - Dominion Energy New England, Inc. (10/24/08 - 11/21/08) |
12.30.08 |
Compliance |
| Audit Report - Dominion Energy Salem Harbor, LLC (10/24/08 - 11/21/08) |
12.30.08 |
Compliance |
| Audit Report - Dominion Nuclear Connecticut, Inc. (10/24/08 - 11/21/08) |
12.30.08 |
Compliance |
| Audit Report - Dominion Retail Inc. (10/24/08 - 11/10/08) |
02.04.09 |
Compliance |
| Audit Report - Dominion Virginia Power (08/21/07 - 08/22/07) |
08.21.07 |
Compliance |
| Audit Report - Dow Pipeline Company (07/12/10 - 07/13/10) |
08.17.10 |
Compliance |
| Audit Report - Doyle 1, LLC (09/27/07) |
03.17.10 |
Compliance |
| Audit Report - DPS Gregory, LLC (05/25/10 - 05/27/10) |
07.30.10 |
Compliance |
| Audit Report - DTE Energy Trading (04/01/08 - 04/02/08) |
08.12.08 |
Compliance |
| Audit Report - DTE Energy Trading, Inc. (06/05/09 - 06/15/09) |
09.25.09 |
Compliance |
| Audit Report - DTE Pontiac North, LLC (05/04/09 - 05/15/09) |
07.20.09 |
Compliance |
| Audit Report - Duke Energy Carolinas (04/21/08 - 04/24/08) |
11.17.08 |
Compliance |
| Audit Report - Duke Energy Corportation |
01.28.10 |
Compliance |
| Audit Report - Duke Energy Generation Services (09/28/09 - 09/28/09) |
03.11.10 |
Compliance |
| Audit Report - Dunkirk Power (05/25/09 - 06/11/09) |
07.20.09 |
Compliance |
| Audit Report - Duquesne Light Energy (06/03/08 -06/13/08) |
08.14.08 |
Compliance |
| Audit Report - Duquesne Power LLC (05/28/08 - 06/04/08) |
08.14.08 |
Compliance |
| Audit Report - Dynegy Inc (06/08/09 - 07/10/09) |
01.13.10 |
Compliance |
| Audit Report - Dynegy Inc. (06/16/10) |
08.18.10 |
Compliance |
| Audit Report - Dynegy Power Marketing (06/23/09 - 07/07/09) |
01.13.10 |
Compliance |
| Audit Report - Dynegy Power Marketing (10/15/08 - 10/17/08) |
01.19.09 |
Compliance |
| Audit Report - E. ON U.S. Services, Inc. for LG&E & KU Companies (02/23/09 - 02/26/09) |
09.08.09 |
Compliance |
| Audit Report - E.I. du Pont Nemours and Company (08/04/09 - 08/05/09) |
12.11.09 |
Compliance |
| Audit Report - Eagle Energy Partners I, L.P. (05/28/08 - 06/04/08) |
09.25.08 |
Compliance |
| Audit Report - Eagle Energy Partners I, LP (08/16/07) |
08.16.07 |
Compliance |
| Audit Report - East Coast Power Linden Holding, LLC ((11/09/09 - 11/17/09) |
03.10.10 |
Compliance |
| Audit Report - East Kentucky Power Cooperative (03/23/09 - 03/25/09) |
09.08.09 |
Compliance |
| Audit Report - EDF Trading North America, LLC (02/09/10 - 02/11/10) |
05.11.10 |
Compliance |
| Audit Report - Edgecombe Genco, LLC/Edgecombe Operating Services (06/08/09 - 06/10/09) |
08.21.09 |
Compliance |
| Audit Report - Edison Marketing & Trading, Inc. (08/13/08 - 08/14/08) |
01.28.09 |
Compliance |
| Audit Report - Edison Mission Marketing & Trading Inc (10/15/09 - 10/24/09) |
01.13.10 |
Compliance |
| Audit Report - Edison Mission Marketing and Trading, LLC (05/27/08 - 05/30/08) |
09.15.08 |
Compliance |
| Audit Report - Edison Sault Electric Company (10/13/08 - 10/23/08) |
01.27.09 |
Compliance |
| Audit Report - EFS Parlin Holdings LLC (11/09/09 - 11/12/09) |
12.22.09 |
Compliance |
| Audit Report - El Paso Electric Company (02/02/09 - 02/06/09) |
06.04.10 |
Compliance |
| Audit Report - Electric Energy, Inc. (10/20/08 - 10/22/08) |
03.11.10 |
Compliance |
| Audit Report - Electric Transmission Texas LLC (09/222/09 - 09/24/09) |
12.22.09 |
Compliance |
| Audit Report - Elizabethtown & Lumberton (11/08/07 - 11/09/07) |
03.19.10 |
Compliance |
| Audit Report - Elk Hills Power (06/24/08) |
07.26.10 |
Compliance |
| Audit Report - Entergy Nuclear James Fitzpatrick (09/10/07) |
03.24.10 |
Compliance |
| Audit Report - Entergy Power Ventures, LP (08/12/08 - 08/14/08) |
01.20.09 |
Compliance |
| Audit Report - Eugene Water & Electric Board (10/20/09 - 10/22/09) |
06.14.10 |
Compliance |
| Audit Report - Exelon Generating Company, LLC (07/15/09 - 08/05/09) |
01.13.10 |
Compliance |
| Audit Report - Exeter Energy LP (07/24/09 - 08/18/09) |
01.13.10 |
Compliance |
| Audit Report - ExxonMobil Oil Corporation - Beaumont (07/22/09 - 07/23/09) |
12.11.09 |
Compliance |
| Audit Report - Farmington Electric Utility System (02/11/08 - 02/15/08) |
07.26.10 |
Compliance |
| Audit Report - FirstLight Hydro Generating Company ( 07/29/09 - 08/17/09) |
01.14.10 |
Compliance |
| Audit Report - FirstLight Power Resources Management (07/31/09 -08/11/09) |
01.13.10 |
Compliance |
| Audit Report - Fitchburg Gas & Electric Light Company (08/10/09 - 08/25/09) |
01.13.10 |
Compliance |
| Audit Report - Flat Rock Windpower LLC (09/09/09 - 09/29/09) |
01.14.10 |
Compliance |
| Audit Report - Flathead Electric Cooperative, Inc. (02/23/10) |
04.09.10 |
Compliance |
| Audit Report - Florida Municipal Power Pool (02/16/09 - 02/20/09) |
04.10.09 |
Compliance |
| Audit Report - Florida Power & Light Company (02/15/10 - 02/19/10) |
05.05.10 |
Compliance |
| Audit Report - Florida Power and Light - New England Division (08/17/09 - 09/09/09) |
01.14.10 |
Compliance |
| Audit Report - Fore River Development LLC (08/10/09 - 08/24/09) |
01.14.10 |
Compliance |
| Audit Report - Formosa Utility Venture, LTD (05/14/08 - 05/15/08) |
08.13.08 |
Compliance |
| Audit Report - Fortis Energy Marketing & Trading GP (02/10/09) |
09.25.09 |
Compliance |
| Audit Report - Fortis Energy Marketing & Trading GP (02/10/09) |
04.17.09 |
Compliance |
| Audit Report - Fortistar North Tonawanda (08/18/09 - 08/27/09) |
01.14.10 |
Compliance |
| Audit Report - Fountain Valley Power (08/11/08) |
05.10.10 |
Compliance |
| Audit Report - FPL Energy (02/11/08 - 02/13/08) |
03.19.10 |
Compliance |
| Audit Report - FPL Energy Duane Arnold, LLC (08/05/08 - 08/15/08) |
10.10.08 |
Compliance |
| Audit Report - FPL Energy Seabrook, LLC (10/02/07) |
10.02.07 |
Compliance |
| Audit Report - Front Range Power Company, LLC (04/21/10) |
06.24.10 |
Compliance |
| Audit Report - Frontera Generation Limited Partnership (10/15/08 - 10/16/08) |
12.08.08 |
Compliance |
| Audit Report - Fulcrum Power Services, LP (02/18/09 - 02/19/09) |
05.20.09 |
Compliance |
| Audit Report - GEN~SYS Energy (02/08/10 - 02/10/10) |
03.16.10 |
Compliance |
| Audit Report - Georgia System Operations Corporation (06/16/08 - 06/18/08) |
12.16.08 |
Compliance |
| Audit Report - Georgia Transmission Corporation (06/18/08 - 06/19/08) |
12.16.08 |
Compliance |
| Audit Report - GEUS (04/13/10 - 04/15/10) |
06.22.10 |
Compliance |
| Audit Report - GEUS (08/17/07) |
08.17.07 |
Compliance |
| Audit Report - Golden Spread Electric Cooperative, Inc. (03/23/10 - 03/25/10) |
06.11.10 |
Compliance |
| Audit Report - Golden Spread Electric Cooperative, Inc. (06/24/08 - 06/27/08) |
01.20.09 |
Compliance |
| Audit Report - Grand River Dam Authority (04/08/08 - 04/10/08) |
03.12.09 |
Compliance |
| Audit Report - Grant Energy Inc. (08/25/09) |
11.17.09 |
Compliance |
| Audit Report - Grays Harbor PUD (06/19/09) |
09.02.10 |
Compliance |
| Audit Report - Great Lakes Energy LLC (02/11/09) |
04.06.10 |
Compliance |
| Audit Report - Green Mountain Power Corporation (08/24/09 - 09/09/09) |
01.14.10 |
Compliance |
| Audit Report - Gregory Power Partners, LP (05/25/10 - 05/27/10) |
07.30.10 |
Compliance |
| Audit Report - Guadalupe Power Partners, LP (08/28/08 - 08/29/08) |
11.11.08 |
Compliance |
| Audit Report - Guadalupe Valley Electric Cooperative, Inc. (04/16/08 -04/17/08) |
04.16.08 |
Compliance |
| Audit Report - Guernsey Muskingum EC (08/24/09 - 09/04/09) |
12.22.09 |
Compliance |
| Audit Report - Gulf Power Company (09/14/09 - 09/15/09) |
01.25.10 |
Compliance |
| Audit Report - GWF Energy LLC (03/27/09) |
04.08.10 |
Compliance |
| Audit Report - GWF Power Systems, LP (02/09/10) |
04.29.10 |
Compliance |
| Audit Report - Hancock-Wood Electric Cooperative, Inc (08/24/09 - 08/28/09) |
09.30.09 |
Compliance |
| Audit Report - Handsome Lake Energy, LLC (04/05/10 - 04/16/10) |
06.28.10 |
Compliance |
| Audit Report - Harney Electric Cooperative, Inc. (03/10/10) |
05.07.10 |
Compliance |
| Audit Report - Hartwell Energy Limited Partnership (08/11/08 - 08/12/08) |
12.16.08 |
Compliance |
| Audit Report - Hastings Utilities (10/21/08 - 10/30/08) |
12.17.08 |
Compliance |
| Audit Report - Hays Energy LP (02/12/08 - 02/14/08) |
02.12.08 |
Compliance |
| Audit Report - Henderson Municipal Power & Light (11/12/08 - 11/13/08) |
04.23.10 |
Compliance |
| Audit Report - High Desert Power Project, LLC (04/14/09 - 04/16/09) |
04.08.10 |
Compliance |
| Audit Report - High Plains Power, Inc. (03/31/08) |
10.27.08 |
Compliance |
| Audit Report - High Trail Wind Farm, LLC (04/05/10 -04/16/10) |
07.21.10 |
Compliance |
| Audit Report - Hingham Municipal Lighting Plant (09/05/09 - 09/21/09) |
01.14.10 |
Compliance |
| Audit Report - Holland Energy, LLC (08/31/09 - 09/02/09) |
01.25.10 |
Compliance |
| Audit Report - HQ Energy Services US Inc (08/28/09 - 09/21/09) |
01.14.10 |
Compliance |
| Audit Report - HQ Energy Services US Inc. (08/28/09 - 09/21/09) |
10.27.09 |
Compliance |
| Audit Report - Hudson Light and Power Department (07/13/09 - 07/28/09) |
01.14.10 |
Compliance |
| Audit Report - Huntley Power LLC (11/02/09 - 11/16/09) |
01.14.10 |
Compliance |
| Audit Report - Iberdrola Renewables (07/16/08) |
08.24.10 |
Compliance |
| Audit Report - Iberdrola Renewables (07/30/08 - 07/31/08) |
01.20.09 |
Compliance |
| Audit Report - Iberdrola Renewables (08/25/08 - 08/29/08) |
10.02.08 |
Compliance |
| Audit Report - Ingleside Cogeneration LP (08/13/09) |
11.18.09 |
Compliance |
| Audit Report - Inland Power & Light Company (03/10/10) |
05.12.10 |
Compliance |
| Audit Report - Integrys Energy Services Inc. (07/13/09 - 07/27/09) |
01.14.10 |
Compliance |
| Audit Report - Integrys Energy Services of New York (07/07/09 - 07/21/09) |
01.15.10 |
Compliance |
| Audit Report - Integrys Energy Services, Inc. (03/27/08) |
10.16.08 |
Compliance |
| Audit Report - IPA Operations Inc. (11/18/09 - 12/14/09) |
01.14.10 |
Compliance |
| Audit Report - IPA Trading, LLC (05/05/09 - 05/07/09) |
07.28.09 |
Compliance |
| Audit Report - ISO New England Inc. (04/20/09 - 04/24/09) |
10.14.09 |
Compliance |
| Audit Report - ITC Transmission (09/16/08 - 09/18/08) |
02.05.09 |
Compliance |
| Audit Report - J. Aron & Company (11/3/09 - 11/05/09) Multi-Regional |
12.22.09 |
Compliance |
| Audit Report - J.P. Morgan Ventures Energy Corporation (02/10/09) |
05.17.10 |
Compliance |
| Audit Report - James River Cogeneration Company (12/04/07) |
12.04.07 |
Compliance |
| Audit Report - JEA (08/04/08 - 09/17/08) |
02.18.09 |
Compliance |
| Audit Report - Jersey Central Power & Light (10/28/08 - 10/29/08) |
05.05.10 |
Compliance |
| Audit Report - Judith Gap (08/12/08) |
09.02.10 |
Compliance |
| Audit Report - K.C. Electric Association, Inc. (03/04/09) |
08.02.10 |
Compliance |
| Audit Report - Kansas Electric Power Cooperative (06/22/09 - 06/24/09) |
09.25.09 |
Compliance |
| Audit Report - Kaysville City Corporation (03/20/08) |
10.16.08 |
Compliance |
| Audit Report - KES Kingsburg, LP (08/13/08) |
11.21.08 |
Compliance |
| Audit Report - KeySpan-Ravenswood LLC (09/25/07) |
09.25.07 |
Compliance |
| Audit Report - Keystone Urban Renewal, L.P. (09/02/08 - 09/12/08) |
03.04.08 |
Compliance |
| Audit Report - KeyTex Energy, LLC (09/02/08 - 09/09/08) |
12.08.08 |
Compliance |
| Audit Report - KIAC Partners (10/21/09 - 10/28/09) |
01.14.10 |
Compliance |
| Audit Report - Kincaid Generation Company (05/27/08 - 05/30/08) |
08.12.08 |
Compliance |
| Audit Report - Kiowa Power Partners (11/06/08 - 11/07/08) |
02.04.09 |
Compliance |
| Audit Report - Kiowa Power Partners (11/06/08 - 11/07/08) |
03.31.09 |
Compliance |
| Audit Report - Kirtland Air Force Base (03/04/09) |
07.28.09 |
Compliance |
| Audit Report - Larkspur Energy, LLC (04/16/09) |
04.28.10 |
Compliance |
| Audit Report - Las Vegas Power Company (07/07/08) |
03.29.10 |
Compliance |
| Audit Report - Las Vegas Power Company, LLC (03/27/08) |
10.20.08 |
Compliance |
| Audit Report - Leathers LP (10/21/09) |
06.14.10 |
Compliance |
| Audit Report - Liberty Power Corporation/Liberty Power Maryland (10/23/08 - 10/28/08) |
01.27.09 |
Compliance |
| Audit Report - Licking Rural Electrification (09/03/08 - 09/09/08) |
12.08.08 |
Compliance |
| Audit Report - Lighthouse Energy Trading Co. Inc. (10/01/08) |
11.02.08 |
Compliance |
| Audit Report - Lincoln County Power District No. 1 (03/12/08 - 03/13/08) |
05.10.10 |
Compliance |
| Audit Report - Linde Energy Services, Inc. (03/19/09 - 03/23/09) |
06.18.09 |
Compliance |
| Audit Report - Lockport Energy Associates LP (10/14/09 - 10/30/09) |
01.15.10 |
Compliance |
| Audit Report - Logan County Electric Cooperative Power & Light Association, Inc. (10/13/08 - 10/21/08) |
01.19.09 |
Compliance |
| Audit Report - Long Island Power Authority (10/30/09 - 11/17/09) |
01.15.10 |
Compliance |
| Audit Report - Los Angeles Department of Water & Power (04/07/08 - 04/11/08) |
09.02.10 |
Compliance |
| Audit Report - Louisiana Generating LLC (10/04/07) |
10.04.07 |
Compliance |
| Audit Report - Lower Colorado River Authority (01/14/09 - 01/15/09) |
04.06.09 |
Compliance |
| Audit Report - LSP Energy Limited Partnership (03/04/08 - 03/06/08) |
10.21.08 |
Compliance |
| Audit Report - Macquarie Cook Power, Inc. (05/04/09 - 05/07/09) |
06.29.09 |
Compliance |
| Audit Report - Madison Gas & Electric (07/25/07 - 07/26/07) |
07.28.07 |
Compliance |
| Audit Report - Magnolia Energy, LP (05/19/09 - 05/21/09) |
01.25.10 |
Compliance |
| Audit Report - Malacha Hydro Limited Partnership (06/12/09) |
08.02.10 |
Compliance |
| Audit Report - Malacha Hydro Limited Partnership - GOP (06/12/09) |
08.02.10 |
Compliance |
| Audit Report - Mansfield Municipal Electric Dept (09/28/09 - 10/06/09) |
01.15.10 |
Compliance |
| Audit Report - Marblehead Municipal Light Dept (09/30/09 - 10/19/09) |
01.15.10 |
Compliance |
| Audit Report - March Point Cogeneration Company (07/09/08) |
11.21.08 |
Compliance |
| Audit Report - Marshall Municipal Untilities (01/06/09 - 01/16/09) |
02.05.09 |
Compliance |
| Audit Report - Massachusetts Municipal Wholesale (10/02/09 - 10/28/09) |
01.15.10 |
Compliance |
| Audit Report - Merrill Lynch Commodities Inc. (07/14/09) |
11.17.09 |
Compliance |
| Audit Report - Metropolitan Edison Company (10/28/08 - 10/29/08) |
03.17.09 |
Compliance |
| Audit Report - Michigan Electric Transmission Company, LLC (09/16/08 - 0918/08) |
02.05.09 |
Compliance |
| Audit Report - Mid-Continent Area Power Pool ( 05/01/09 - 05/08/09) |
07.16.09 |
Compliance |
| Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) |
10.02.08 |
Compliance |
| Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) |
10.02.08 |
Compliance |
| Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) |
10.02.08 |
Compliance |
| Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) |
10.02.08 |
Compliance |
| Audit Report - Midlothian Energy (02/12/08 - 02/14/08) |
02.12.08 |
Compliance |
| Audit Report - Midstate Electric Cooperative Inc. (03/12/09) |
04.28.10 |
Compliance |
| Audit Report - Midwest Contingency Reserve Sharing Group (10/29/09 - 11/02/09) |
12.22.09 |
Compliance |
| Audit Report - Midwest Contingency Reserve Sharing Group (11/29/09 - 11/02/09) |
12.22.09 |
Compliance |
| Audit Report - Midwest Contingency Reserve Sharing Group (11/29/09 - 11/02/09) Multi-Regional |
12.22.09 |
Compliance |
| Audit Report - Midwest Energy, Inc. (04/21/09 - 04/23/09) |
07.08.09 |
Compliance |
| Audit Report - Midwest Independent Transmission System Op (11/03/09 - 11/10/09) |
02.22.10 |
Compliance |
| Audit Report - Mirant Delta, LLC (04/23/09) |
09.02.10 |
Compliance |
| Audit Report - Mississippi Power Company (09/16/09 - 09/17/09) |
01.25.10 |
Compliance |
| Audit Report - Missoula Electric Cooperative, Inc. (02/24/10) |
04.29.10 |
Compliance |
| Audit Report - Missouri River Energy Services (09/02/08 - 09/18/08) |
11.02.08 |
Compliance |
| Audit Report - Modesto Irrigation District (04/21/08 - 04/25/08) |
06.04.10 |
Compliance |
| Audit Report - Morgan County Rural Electric Association (10/02/08) |
03.29.10 |
Compliance |
| Audit Report - Morgan Stanley Capital Group (03/19/08) |
10.20.08 |
Compliance |
| Audit Report - Mountain Parks Electric, Inc. (03/04/09) |
07.28.09 |
Compliance |
| Audit Report - Mountain View Electric Association (03/19/08) |
10.20.08 |
Compliance |
| Audit Report - MSR Public Power Agency (02/11/09) |
04.14.09 |
Compliance |
| Audit Report - Mt. Poso Cogeneration Co. (04/21/10) |
05.19.10 |
Compliance |
| Audit Report - N.C. Electric Membership Corp. (05/19/08 - 05/20/08) |
11.17.08 |
Compliance |
| Audit Report - NAES Corporation (08/24/09 - 08/25/09) |
11.20.09 |
Compliance |
| Audit Report - NAES Corporation - Dogwood (07/22/09 - 07/24/09) |
11.29.09 |
Compliance |
| Audit Report - NAES Corporation - Holland (08/31/09 - 09/02/09) |
01.25.10 |
Compliance |
| Audit Report - Naniwa Energy LLC (10/20/09) |
06.14.10 |
Compliance |
| Audit Report - Natchitoches Utilities System (07/30/08 - 07/31/08) |
01.20.09 |
Compliance |
| Audit Report - NE Utilities Service Co, Connecticut Valley Electric Exchange (06/26/07 - 06/27/07) |
06.26.07 |
Compliance |
| Audit Report - Nebraska Public Power District (11/14/07 - 11/15/07) |
11.14.07 |
Compliance |
| Audit Report - Nevada Cogeneration Company #1 (07/14/08) |
12.01.08 |
Compliance |
| Audit Report - Nevada Power Company (05/12/08 - 05/16/08) |
06.04.10 |
Compliance |
| Audit Report - New Athens Generating Company LLC (08/24/09 - 09/14/09) |
01.15.10 |
Compliance |
| Audit Report - New Braunfels Utilities (06/18/08 - 06/19/08) |
08.21.08 |
Compliance |
| Audit Report - New Brunswick System Operator (10/14/08 - 10/17/08) |
11.08.08 |
Compliance |
| Audit Report - New England Power Company (09/08/08 - 09/11/08) |
11.14.08 |
Compliance |
| Audit Report - New York Independent System Operator (08/18/09 - 08/21/09) |
01.15.10 |
Compliance |
| Audit Report - New York Independent System Operator (08/18/09 - 08/21/09) |
10.27.09 |
Compliance |
| Audit Report - New York Independent System Operator - NYISO (12/03/07 - 12/07/07) |
12.03.07 |
Compliance |
| Audit Report - NextEra Energy Resources Midwest Wind (07/27/09 - 08/07/09) |
09.30.09 |
Compliance |
| Audit Report - NextEra Energy Resources, LLC (02/10/09 - 02/12/09) |
06.23.09 |
Compliance |
| Audit Report - Niagara Mohawk Power Corp. (10/29/07 - 10/30/07) |
10.29.07 |
Compliance |
| Audit Report - North American Energy Services (07/20/09 - 07/24/09) |
11.20.09 |
Compliance |
| Audit Report - North American Energy Services (10/30/07) |
07.28.08 |
Compliance |
| Audit Report - North American Energy Services Co. - Magnolia (05/19/09 - 05/21/09) |
09.28.09 |
Compliance |
| Audit Report - North American Trading & Marketing Inc. (02/18/09) |
04.06.10 |
Compliance |
| Audit Report - North American Trading & Marketing, Inc. (02/18/09) |
04.17.09 |
Compliance |
| Audit Report - Northeast Power Coordinating Council, Inc. (10/19/09 - 11/09/09) |
07.06.10 |
Compliance |
| Audit Report - Northeast Texas Electric Cooperative (04/27/09 - 04/30/09) |
08.29.09 |
Compliance |
| Audit Report - Northern Iowa Wind Power 1, LLC (10/28/09) |
12.22.09 |
Compliance |
| Audit Report - Northern Wasco County People's Utility (06/17/09) |
08.02.10 |
Compliance |
| Audit Report - Nova Scotia Power Inc. (09/19/07 - 09/20/07) |
09.19.07 |
Compliance |
| Audit Report - NRG Power Marketing LLC (02/12/09) |
04.08.10 |
Compliance |
| Audit Report - NRG Texas Power LLC (09/01/09 - 09/03/09) |
11.18.09 |
Compliance |
| Audit Report - NSTAR Electric (10/06/09 - 10/07/09) |
01.15.10 |
Compliance |
| Audit Report - NSTAR Electric Company (12/20/07) |
12.20.07 |
Compliance |
| Audit Report - Oak Grove Management Co, LLC (04/27/10 - 04/29/10) |
07.30.10 |
Compliance |
| Audit Report - Occidental Chemical Corporation (08/18/08 - 08/19/08) |
06.10.10 |
Compliance |
| Audit Report - Occidental Power Services, Inc. (06/03/08 - 06/13/08) |
09.15.08 |
Compliance |
| Audit Report - Occidental Power Services, Inc. (09/01/09 - 09/04/09) |
11.02.09 |
Compliance |
| Audit Report - Occidental pwer Services, Inc. (08/18/08 - 08/19/08) |
11.18.08 |
Compliance |
| Audit Report - Odessa-Ector Power Partners LP (08/28/08) |
11.04.08 |
Compliance |
| Audit Report - Oglethorpe Power Corporation (11/15/07) |
07.28.08 |
Compliance |
| Audit Report - Oklahoma Municipal Power Authority (07/30/08 - 07/31/08) |
01.08.09 |
Compliance |
| Audit Report - Old Dominion Electric Cooperative (04/02/08 -04/17/08) |
08.12.08 |
Compliance |
| Audit Report - Old Dominion Electric Cooperative (08/23/07) |
03.19.10 |
Compliance |
| Audit Report - Oncor Electric Delivery Company (06/28/07) |
06.28.07 |
Compliance |
| Audit Report - Ontario Independent Electricity System Operator (06/17/08 - 07/14/08) |
10.28.08 |
Compliance |
| Audit Report - Ontario Power Generation Inc. (10/14/08 - 10/20/08) |
01.27.09 |
Compliance |
| Audit Report - Ontario's Independent Electricity System Operator (11/05/07 - 11/08/07) |
11.07.07 |
Compliance |
| Audit Report - Optim Energy Altura Cogen, LLC (06/08/10 - 06/11/10) |
08.18.10 |
Compliance |
| Audit Report - Optim energy Cedar Bayou 4, LLC (06/08/10 - 06/11/10) |
08.18.10 |
Compliance |
| Audit Report - Orange & Rockland Utilities, Inc. (05/14/08 - 05/16/08) |
10.28.08 |
Compliance |
| Audit Report - Overton Power District No. 5 (03/11/08 - 03/12/08) |
05.20.10 |
Compliance |
| Audit Report - Owensboro Municipal Utilities (11/05/08 - 11/06/08) |
05.05.10 |
Compliance |
| Audit Report - Oxy Vinyls LP (04/20/10 - 04/22/10) |
06.11.10 |
Compliance |
| Audit Report - Pacific Northwest Generating Cooperative (02/10/09) |
04.14.09 |
Compliance |
| Audit Report - Pacific Summit Energy LLC (02/12/09) |
04.14.09 |
Compliance |
| Audit Report - Pacific-Ultrapower Chinese Station - GOP (03/12/09) |
04.28.10 |
Compliance |
| Audit Report - Paulding Putnam Electric Cooperative Inc (11/09/09) |
12.22.09 |
Compliance |
| Audit Report - PECO Energy Co. (09/11/07 - 09/12/07) |
09.11.07 |
Compliance |
| Audit Report - Pedernales Electric CO OP, Inc. (03/12/08 - 03/13/08) |
03.12.08 |
Compliance |
| Audit Report - Pennsylvania Electric Company (10/28/08 - 10/29/08) |
03.17.09 |
Compliance |
| Audit Report - Pierre Municipal Utilities (05/27/09 - 06/05/09) |
07.08.09 |
Compliance |
| Audit Report - Plains End, LLC (03/06/09) |
04.28.10 |
Compliance |
| Audit Report - Platte River Power Authority (03/16/09 - 03/19/09) |
04.08.10 |
Compliance |
| Audit Report - Potomac Electric Power Company (04/29/08 - 04/30/08) |
08.04.08 |
Compliance |
| Audit Report - Poudre Valley Rural Electric Association, Inc. (03/19/08) |
05.20.10 |
Compliance |
| Audit Report - PowerSouth Energy Cooperative (07/14/08 - 07/16/08) |
12.16.08 |
Compliance |
| Audit Report - PPL Electric Utilities Corp. (02/24/09 - 02/26/09) |
06.08.09 |
Compliance |
| Audit Report - PPL Energy Plus, LLC (11/09/09 - 11/17/09) |
01.25.10 |
Compliance |
| Audit Report - PPL Montana, LLC (04/06/10) |
05.19.10 |
Compliance |
| Audit Report - PPL Susquehanna, LLC, Inc. (11/09/09 - 11/20/09) |
03.10.10 |
Compliance |
| Audit Report - PPM Energy, Inc. (03/21/08) |
10.20.08 |
Compliance |
| Audit Report - Prairie Power, Inc. (09/02/09 - 09/03/09) |
12.11.09 |
Compliance |
| Audit Report - Prairieland Energy Incorporated (07/14/10 - 07/15/10) |
08.17.10 |
Compliance |
| Audit Report - Progress Energy Carolinas (04/28/08 - 05/01/08) |
11.17.08 |
Compliance |
| Audit Report - Public Service Commission of Yazoo City (06/16/10) |
07.30.10 |
Compliance |
| Audit Report - Public Service of New Hampshire ESCC (06/26/07 - 06/27/07) |
06.26.07 |
Compliance |
| Audit Report - Public Utility District 1 of Chelan County (05/03/10 - 05/07/10) |
08.19.10 |
Compliance |
| Audit Report - Public Utility District No. 1 of Chelan County (08/07/07 - 08/09/07) |
07.26.10 |
Compliance |
| Audit Report - Public Utility District No. 1 of Skamania County (02/24/10) |
06.22.10 |
Compliance |
| Audit Report - Raft River Rural Electric Cooperative (03/12/09) |
04.28.10 |
Compliance |
| Audit Report - Rathdrum Power, LLC (03/06/09) |
05.14.09 |
Compliance |
| Audit Report - Rayburn Country Co Op DBA Rayburn Electric (10/22/08 - 10/23/08) |
01.16.09 |
Compliance |
| Audit Report - Reedy Creek Improvement District (09/29/08 - 10/02/08) |
02.18.09 |
Compliance |
| Audit Report - ReliabilityFirst Corporation (03/23/09 - 03/30/09) |
04.07.10 |
Compliance |
| Audit Report - Reliant Energy Coolwater, Inc. (06/09/09) |
04.28.10 |
Compliance |
| Audit Report - Reliant Energy Florida, LLC (01/06/09 - 01/07/09) |
05.27.09 |
Compliance |
| Audit Report - Reliant Energy Power Supply & Reliant Energy Channelview LP (06/04/08 - 06/05/08) |
10.29.08 |
Compliance |
| Audit Report - Reliant Energy Wholesale Generation & Reliant Energy Service (11/01/07) |
03.19.10 |
Compliance |
| Audit Report - Rio Bravo Fresno (06/10/09) |
04.28.10 |
Compliance |
| Audit Report - Rio Bravo Jasmin (08/18/08) |
03.29.10 |
Compliance |
| Audit Report - Rio Bravo Rocklin (08/19/08) |
05.10.10 |
Compliance |
| Audit Report - Rio Nogales Power Project LP (03/27/08) |
03.27.08 |
Compliance |
| Audit Report - Rochester Public Utility (09/06/07 - 09/07/07) |
03.08.10 |
Compliance |
| Audit Report - Rocky Mountain Reserve Group (08/19/09) |
08.02.10 |
Compliance |
| Audit Report - Rosebud Operating Services, Inc. (04/22/10) |
05.14.10 |
Compliance |
| Audit Report - RRI Energy Etiwanda, Inc. (03/9/10) |
07.30.10 |
Compliance |
| Audit Report - Sacramento Municipal Utility District (12/10/07 - 12/14/07) |
05.10.10 |
Compliance |
| Audit Report - Saguaro Power Company, A Limited Partnership (03/10/10) |
04.29.10 |
Compliance |
| Audit Report - Salem Electric (03/14/08) |
06.04.10 |
Compliance |
| Audit Report - Salt River Project Agricultural Improvement & Power District (01/07/08 - 01/11/08) |
06.04.10 |
Compliance |
| Audit Report - Salton Sea Power Generation, LP (06/10/09) |
08.02.10 |
Compliance |
| Audit Report - San Bernard Electric Coop, Inc. (05/27/09 - 05/28/09) |
08.12.09 |
Compliance |
| Audit Report - San Isabel Electric Association, Inc. (03/04/09) |
04.23.10 |
Compliance |
| Audit Report - San Luis Valley Rural Electric Cooperative, Inc. (03/28/08) |
10.20.08 |
Compliance |
| Audit Report - San Miguel Power Association, Inc. (10/14/08) |
03.29.10 |
Compliance |
| Audit Report - Sempra Energy Trading Corporation (03/20/08) |
10.20.08 |
Compliance |
| Audit Report - SERC Reliability Corporation (06-1-09 - 06/15/09) |
05.03.10 |
Compliance |
| Audit Report - Sharyland Utilities LLC (08/19/09 - 08/20/09) |
11.18.09 |
Compliance |
| Audit Report - Shell Energy North America (US) L.P. (11/10/08 - 11/11/08) |
02.04.09 |
Compliance |
| Audit Report - Shell Energy North America (US) L.P. (11/10/08 - 11/11/08) |
03.31.09 |
Compliance |
| Audit Report - SID Richardson Carbon LTD (05/13/09 - 05/14/09) |
07.20.09 |
Compliance |
| Audit Report - Sikeston Board of Municipal Utilities (08/11/08 - 08/13/08) |
01.28.09 |
Compliance |
| Audit Report - South Carolina Electric & Gas Co. (10/27/08 - 10/30/08) |
03.10.09 |
Compliance |
| Audit Report - South Carolina Electric & Gas Company (05/27/08 - 05/30/08) |
08.12.08 |
Compliance |
| Audit Report - South Central Power Company (05/27/08 - 05/28/08) |
09.15.08 |
Compliance |
| Audit Report - South Eastern Electric Development Co. (09/17/08) |
03.22.10 |
Compliance |
| Audit Report - South Eastern Electric Generating Co. (09/15/08 - 09/16/08) |
03.22.10 |
Compliance |
| Audit Report - South Houston Green Power, LP (08/28/08 - 08/29/08) |
11.24.08 |
Compliance |
| Audit Report - South Jersey Energy (08/31/09) |
10.14.09 |
Compliance |
| Audit Report - South Mississippi Electric Power Association (10/02/07) |
07.28.08 |
Compliance |
| Audit Report - South Mississippi Electric Power Association (11/09/09 - 11/12/09) |
06.22.10 |
Compliance |
| Audit Report - South Texas Electric Co OP Inc. (06/03/09 - 06/05/09) |
08.21.09 |
Compliance |
| Audit Report - South Texas Electric Co Op Inc. (07/19/07) |
07.19.07 |
Compliance |
| Audit Report - South Western Electric Cooperative Inc. (09/17/08 - 09/18/08) |
03.22.10 |
Compliance |
| Audit Report - Southern Company Services, Inc. (11/27/07 - 11/28/07) |
07.28.08 |
Compliance |
| Audit Report - Southern Company Services, Inc. - Trans RC (11/16/09 - 11/18/09) |
04.23.10 |
Compliance |
| Audit Report - Southwest Transmission Cooperative, Inc. (02/23/09 - 02/26/09) |
09.02.10 |
Compliance |
| Audit Report - Southwestern Electric Cooperative, Inc. (03/04/09) |
04.23.10 |
Compliance |
| Audit Report - Southwestern Public Service (09/18/07 - 09/20/07) |
09.18.07 |
Compliance |
| Audit Report - SOWEGA Power, LLC (09/25/07) |
07.28.08 |
Compliance |
| Audit Report - SPP Reliability Coordinator (10/29/07 - 10/31/07) |
10.29.07 |
Compliance |
| Audit Report - Springer Electric Cooperative, Inc. (02/24/10) |
06.24.10 |
Compliance |
| Audit Report - Springfield Utility Board (03/14/08, 03/17/08, 03/18/08) |
10.20.08 |
Compliance |
| Audit Report - Spruance Genco, LLC (12/05/07) |
07.28.08 |
Compliance |
| Audit Report - Spruance Operating Services, LLC (12/05/07) |
07.28.08 |
Compliance |
| Audit Report - State Line Energy, LLC (09/02/08 - 09/11/08) |
10.29.08 |
Compliance |
| Audit Report - STP Nuclear Operating Company (07/22/09 - 07/23/09) |
10.06.09 |
Compliance |
| Audit Report - Strategic Energy LLC (03/20/08) |
10.27.08 |
Compliance |
| Audit Report - Strategic Energy LLC (03/20/08) |
04.06.10 |
Compliance |
| Audit Report - SUEZ Energy Marketing (03/03/09) |
07.16.09 |
Compliance |
| Audit Report - Suez Energy Marketing NA, Inc. (10/13/08 - 10/22/08) |
01.19.09 |
Compliance |
| Audit Report - Suez Energy Marketing, Hopewell Cogen LP, Hot Spring Power, Choctaw Gas Gen., Choctaw Gen. LP (04/15/08 - 04/16/08) |
03.22.10 |
Compliance |
| Audit Report - Suez Energy Resources NA, Inc. (10/13/08 - 10/22/08) |
01.19.09 |
Compliance |
| Audit Report - Sweeny Cogeneration Limited Partnership (10/21/08 - 10/22/08) |
01.16.09 |
Compliance |
| Audit Report - Sycamore Cogeneration Company (06/11/09) |
05.05.10 |
Compliance |
| Audit Report - Taunton Municipal Lighting Plant (04/08/08 - 04/10/08) |
11.05.08 |
Compliance |
| Audit Report - Tenaska Frontier Partners Ltd. (10/27/09 - 10/29/09) |
05.17.10 |
Compliance |
| Audit Report - Tenaska Alabama II Partners, L.P. (09/08/08 - 09/10/08) |
01.08.09 |
Compliance |
| Audit Report - Tenaska Alabama Partners, LP (09/08/08 - 09/10/08) |
06.22.10 |
Compliance |
| Audit Report - Tenaska Gateway Partners Ltd. (11/06/08 - 11/07/08) |
02.03.09 |
Compliance |
| Audit Report - Tenaska Georgia Partners, LP (12/02/09 - 12/03/09) |
06.22.10 |
Compliance |
| Audit Report - Tenaska Power Services (11/12/08 - 11/13/08) |
02.05.09 |
Compliance |
| Audit Report - Tenaska Virginia Partners, L.P. (08/24/09 - 08/26/09) |
01.25.10 |
Compliance |
| Audit Report - Tenaska Washington Partners, LP (04/20/10) |
05.19.10 |
Compliance |
| Audit Report - Tennessee Valley Authority (03/04/09 - 03/05/09) |
08.29.09 |
Compliance |
| Audit Report - Tennessee Valley Authority Reliability Coordinator (05/04/09 - 05/07/09) |
01.25.10 |
Compliance |
| Audit Report - Termoelectrica US LLC (06/19/09) |
07.16.09 |
Compliance |
| Audit Report - Terra-Gen Dixie Valley, LLC (03/05/09) |
05.17.10 |
Compliance |
| Audit Report - Terra-Gen Operating Company, LLC (03/05/09) |
05.17.10 |
Compliance |
| Audit Report - Terrebonne Parish Consolidated Government (08/12/09 - 08/13/09) |
11.29.09 |
Compliance |
| Audit Report - Texas - New Mexico Power Co. (04/09/08 - 04/10/08) |
04.09.08 |
Compliance |
| Audit Report - The Dow Chemical Company (08/20/08 - 08/21/08) |
12.16.08 |
Compliance |
| Audit Report - The Energy Authority (03/20/08) |
10.20.08 |
Compliance |
| Audit Report - The Energy Authority, Inc. (03/16/09 - 03/24/09) |
09.25.09 |
Compliance |
| Audit Report - The Energy Authority, Inc. (03/16/09 - 03/24/09) |
05.20.09 |
Compliance |
| Audit Report - Thermal Energy Development Partnership (03/10/09) |
05.05.10 |
Compliance |
| Audit Report - Town of Estes Park - Light & Power Dept. (02/25/10) |
06.15.10 |
Compliance |
| Audit Report - Tradinghouse Power Company LLC (07/23/08 - 07/24/08) |
10.29.08 |
Compliance |
| Audit Report - TransAlta Energy Marketing (US) Inc. (12/07/09 - 12/08/09) |
01.26.10 |
Compliance |
| Audit Report - Transmission Agency Northern California (11/06/09) |
05.25.10 |
Compliance |
| Audit Report - Trent Wind Farm LP (08/06/08) |
10.29.08 |
Compliance |
| Audit Report - Tri-State Generation and Transmission Association, Inc. - Reliability (06/01/09 - 06/05/09) |
09.02.10 |
Compliance |
| Audit Report - Truckee Donner Public Utility District (10/15/08) |
05.20.10 |
Compliance |
| Audit Report - Tuscon Electric Power Marketing (10/16/08) |
03.29.10 |
Compliance |
| Audit Report - TXU Porfolio Management Company LP (06/27/07) |
06.27.07 |
Compliance |
| Audit Report - UGI Development Company (08/25/09) |
11.17.09 |
Compliance |
| Audit Report - UGI Energy Services, Inc. (08/25/09) |
11.17.09 |
Compliance |
| Audit Report - Umatilla Electric Cooperative Assoc. (03/12/08) |
08.02.10 |
Compliance |
| Audit Report - Union Power Partners (04/15/08 - 04/16/08) |
03.19.10 |
Compliance |
| Audit Report - Union Rural Electric Cooperative Inc. (03/16/09 - 03/24/09) |
05.29.09 |
Compliance |
| Audit Report - United Electric Co-op, Inc. (03/14/08 - 03/18/08) |
06.04.10 |
Compliance |
| Audit Report - University Park Energy, LLC (08/24/09 - 09/4/09) |
11.29.09 |
Compliance |
| Audit Report - Upper Peninsula Power Company) 10/12/09 - 10/21/09) |
12.22.09 |
Compliance |
| Audit Report - US Operating Services Company - Chambers (03/17/09 - 03/24/09) |
05.20.09 |
Compliance |
| Audit Report - Utah Associated Municipal Power Systems (03/19/08) |
10.20.08 |
Compliance |
| Audit Report - Utah Associated Municipal Power Systems (03/19/08) |
11.19.08 |
Compliance |
| Audit Report - Utah Associated Municipal Power Systems (07/29/08) |
02.02.09 |
Compliance |
| Audit Report - VACAR South Reliability Coordinator (04/22/08 - 04/24/08) |
11.17.08 |
Compliance |
| Audit Report - Vera Water & Power (11/05/09) |
05.25.10 |
Compliance |
| Audit Report - Vermont Electric Cooperative, Inc. (09/26/07) |
09.26.07 |
Compliance |
| Audit Report - Vermont Transco, LLC (06/16/09 - 06/18/09) |
07.31.09 |
Compliance |
| Audit Report - Viasyn, Inc. (04/07/10) |
05.19.10 |
Compliance |
| Audit Report - Vulcan/BN Geothermal Power Company (04/07/10) |
05.25.10 |
Compliance |
| Audit Report - Wabash Valley Power Association Inc (11/09/09 - 11/16/09) |
01.19.10 |
Compliance |
| Audit Report - Washington City Light & Power (11/09/09 - 11/12/09) |
01.26.10 |
Compliance |
| Audit Report - Washington Electric Cooperative, Inc. (05/04/09 - 05/11/09) |
06.18.09 |
Compliance |
| Audit Report - Watertown Municipal Utilities District (WMUD) (01/28/09- 02/05/09) |
05.05.09 |
Compliance |
| Audit Report - Watson Cogeneration Company (06/11/09) |
05.05.10 |
Compliance |
| Audit Report - West Georgia Generating Company (11/06/07) |
03.19.10 |
Compliance |
| Audit Report - Westar Energy (10/02/07 - 10/04/07) |
10.02.07 |
Compliance |
| Audit Report - Western Area Power Admin. Desert Southwest Region Merchant (03/03/09) |
04.14.09 |
Compliance |
| Audit Report - Western Area Power Administration (08/22/07 - 08/23/07) |
08.22.07 |
Compliance |
| Audit Report - Western Kentucky Energy Corp. (11/03/08 - 11/04/08) |
03.10.09 |
Compliance |
| Audit Report - Westmoreland Partners (04/14/08 - 04/16/08) |
03.22.10 |
Compliance |
| Audit Report - Wheelabrator Lassen, Inc. (06/12/09) |
05.05.10 |
Compliance |
| Audit Report - Whitewater Operating Services, LLC (05/27/08 - 06/06/08) |
08.12.08 |
Compliance |
| Audit Report - Wolf Hollow I, L.P. (10/29/08 - 10/30/08) |
01.16.09 |
Compliance |
| Audit Report - Woodland Biomass Power Ltd. (08/04/08) |
04.06.10 |
Compliance |
| Audit Report - WPPI Energy (03/03/09 - 03/12/09) |
06.04.09 |
Compliance |
| Audit Report - Xcel Energy - Northern States Power (02/27/08 - 02/28/08) |
02.27.08 |
Compliance |
| Audit Report - Y-W Electric Association (03/19/08) |
10.20.08 |
Compliance |
| Audit Report - Yoakum Electric Generating Cooperative, Inc. (06/24/08 - 06/27/08) |
01.20.09 |
Compliance |
| Audit Report - Yuma Cogeneration Associates (06/16/09) |
05.05.10 |
Compliance |
| Auditi Report - Big Bend Electric Cooperative Inc. (03/10/09) |
05.17.10 |
Compliance |
| Automatic Generation Control |
05.10.10 |
Compliance |
| Automatic Generation Control |
10.29.08 |
Standards |
| Automatic Time Error Correction (WECC) |
01.01.90 |
Standards |
| Automatic Voltage Regulators (AVR) (WECC) |
10.29.08 |
Standards |
| Automatic Voltage Regulators (WECC) |
03.12.07 |
Standards |
| Available Transmission System Capability |
08.26.08 |
Standards |
| BA Certification of City of North Little Rock |
03.29.10 |
Compliance |
| BA Certification of Plum Point & Osceola |
08.11.09 |
Compliance |
| BA of Griffith Final Report |
01.05.09 |
Compliance |
| BA of Midwest ISO |
02.07.08 |
Compliance |
| BA of Midwest ISO, Mid-America & Muscatine |
09.08.09 |
Compliance |
| BA of NaturEner Final Report |
01.05.09 |
Compliance |
| BAL and VAR NOPR Comments |
01.07.09 |
About NERC |
| Balancing and Interchange Content Outline |
03.12.09 |
Programs |
| Balancing Authority Questionnaire |
01.24.08 |
Compliance |
| Balancing, Interchange, and Transmission Content Outline |
03.12.09 |
Programs |
| Benton Rural Electric Association (Final Decision) |
04.28.10 |
Compliance |
| BPA Comments |
05.29.09 |
About NERC |
| Bylaws of the North American Electric Reliability Corporation |
10.14.09 |
About NERC |
| Capacity and Energy Emergencies |
05.10.10 |
Compliance |
| Capacity and Energy Emergencies |
10.29.08 |
Standards |
| Capacity and Energy Emergencies |
08.05.10 |
Standards |
| Capacity Benefit Margin |
11.13.08 |
Standards |
| CERP Approval Checklist for Individual Learning (Ver4.0) |
07.08.09 |
Programs |
| CERP Approval Checklist for Individual Learning (Ver4.1) |
09.29.09 |
Programs |
| CERP Approval Checklist for Individual Learning Activities (Ver 4.3) |
01.20.10 |
Programs |
| CERP Confidentiality Agreement |
04.16.10 |
Programs |
| Certificate of Incorporation of the North America |
12.14.06 |
About NERC |
| Certification of Protective Relay Applications and Settings (WECC) |
03.12.07 |
Standards |
| Chairman of the Board of Trustees Job Description |
02.22.07 |
About NERC |
| Change of Scope 8 - List of Changes |
08.27.09 |
Programs |
| Changes to the GADS Data Reporting Instructions - Effective January 1, 2010 |
12.02.09 |
Assessments & Trends |
| Changes to Three Reliability Standards (Alberta) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (British Columbia) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (Manitoba) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (National Energy Board) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (New Brunswick) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (Ontario) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (Quebec) |
09.10.09 |
About NERC |
| Changes to Three Reliability Standards (Saskatchewan) |
09.10.09 |
About NERC |
| City of Tampa, Florida (Decision on Remand) |
11.14.07 |
Compliance |
| City of Tampa, Florida, McKay Bay Resource Recovery and Wheelabrator Technologies, Inc. |
07.30.07 |
Compliance |
| Comment Period Closed - August 28-September 28, 2009 |
10.01.09 |
Standards |
| Comment Period Closed - May 20-July 6, 2009 |
05.20.09 |
Standards |
| Comment Period Closed for FM Technical Document - Version 5 |
09.24.09 |
Standards |
| Comment Period Closed for Functional Model - Version 5 |
09.25.09 |
Standards |
| Comment Period Opens for Reports Evaluating Requests to Transfer Compliance Registration of Several Entities from MRO and SPP RE |
08.31.10 |
Compliance |
| Comments - California ISO |
08.11.08 |
Compliance |
| Comments - First Energy - RoP 500 |
08.08.08 |
Compliance |
| Comments - Gainesville Regional Utilities |
07.23.08 |
Compliance |
| Comments - IROL Standard Drafting Team |
08.06.08 |
Compliance |
| Comments - Manitoba Hydro |
08.07.08 |
Compliance |
| Comments - Northeast Utilities |
08.07.08 |
Compliance |
| Comments - NPCC |
07.28.08 |
Compliance |
| Comments - Ontario IESO |
08.12.08 |
Compliance |
| Comments - Pacific Gas and Electric |
08.11.08 |
Compliance |
| Comments - PJM |
08.08.08 |
Compliance |
| Comments - San Diego Gas and Electric |
08.11.08 |
Compliance |
| Comments - SERC OC Standards Group |
08.08.08 |
Compliance |
| Comments - Southern Company Comments on RoP 500 |
08.07.08 |
Compliance |
| Comments - Southern Company comments on RoP Appendix 5 |
08.07.08 |
Compliance |
| Comments - SPP ISO |
08.08.08 |
Compliance |
| Comments - TAPS |
08.11.08 |
Compliance |
| Comments following the July 6 Technical Conference |
07.26.10 |
About NERC |
| Comments in Response to ATC Reliability Standards NOPR |
05.26.09 |
About NERC |
| Comments in Response to February 19, 2009 NAESB Filing |
03.06.09 |
About NERC |
| Comments in Response to FERC's January 21, 2010 NOI on the Integration of Variable Energy Resources |
04.12.10 |
About NERC |
| Comments in Response to NOPR on the Revision to the ERO Definition of the Bulk Electric System |
05.10.10 |
About NERC |
| Comments in Response to NOPR on Time Error Correction Standard BAL-004-1 |
04.28.10 |
About NERC |
| Comments in Response to NOPR on Two System Personnel Training Reliability Standards |
08.23.10 |
About NERC |
| Comments in Response to Notice of Inquiry Regarding Reliability Standard IRO-006-4 and Curtailment Priorities |
03.29.10 |
About NERC |
| Comments in Response to the Commission's September 18, 2008 Order on Proposed Clarification |
11.03.08 |
About NERC |
| Comments in Response to the FERC's October 28, 2009 Draft on the Possible Elements of a National Action Plan on Demand Response |
12.04.09 |
About NERC |
| Comments in Response to the March 18, 2010 BAL-002-WECC-01 NOPR |
05.24.10 |
About NERC |
| Comments in Support of Texas RE and Constellation Settlement Agreement |
05.12.09 |
About NERC |
| Comments of NERC in Response to Notice of Proposed Rulemaking |
08.17.09 |
About NERC |
| Comments of the NERC on the NOPR for Mandatory Reliability Standard for Nuclear Plant Interface Coordination |
05.13.08 |
About NERC |
| Comments of the NERC on the NOPR for Standards for Business Practices and Communication Protocols for Public Utilities |
05.28.08 |
About NERC |
| Comments of the NERC on the NOPR on Modification of Interchange and TLR Reliability Standards; and |
06.12.08 |
About NERC |
| Comments on Interpretation of Reliability Standard TPL-002-0 |
05.10.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - American Transmission Company |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - City Utilities of Springfield, Missouri |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Constellation and affiliates |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Dailyland Power Cooperative |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Duke Energy |
04.28.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Edison Electric Institute |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Empire District Electric Company |
04.29.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - First Energy |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Georgia Systems Operations Corporation |
04.27.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - ISO/RTO Council Standards Review Committee |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Kansas City Power and Light |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Luminant |
04.21.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Nebraska Public Power District |
04.29.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Procedures Subcommittee of the NERC CCC |
04.29.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Southwest Power Pool, Inc. |
04.30.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Tom Abrams, Chair of the NERC CCC |
04.29.10 |
About NERC |
| Comments on Proposed Changes to Rules of Procedure and Appendices - Transmission Access Policy Study Group |
04.28.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Additional Comments from the Electric Power Supply Association |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Ameren |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - American Electric Power |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Bonneville Power Administration |
06.08.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - City Utilities of Springfield, Missouri |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Consolidated Edison Company of New York, Inc. |
06.03.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Dominion |
06.03.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Duke Energy |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Empire District Electric Company |
06.03.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Entergy |
06.03.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - FirstEnergy |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Florida Reliability Coordinating Council |
06.03.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Georgia System Operations Corporation |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Hydro One Networks, Inc. |
06.02.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - ISO-RTO Council's Standard Review Committee |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Kansas City Power & Light and KCP&L - Greater Missouri Operations Co |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Manitoba Hydro |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - NRG Energy, Inc. |
06.02.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - PJM Interconnection |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Regional Standard's Committee of NPCC |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - SERC Reliability Corporation |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Southern Company |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - SPS Consulting Group Inc |
05.20.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - The United Illuminating Company |
06.02.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Trade Associations |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Western Electricity Coordinating Council |
06.04.10 |
About NERC |
| Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Wisconsin Electric Power Company |
06.03.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - American Transmission Company |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Constellation Energy |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Duke Energy |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Edison Electric Institute |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Empire District Electric Company |
03.02.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - ISO/RTO Council's Standards Review Committee |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Kansas City Power & Light |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - National Rural Electric Cooperative Association |
03.05.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Nebraska Public Power District |
02.17.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Nebraska Public Power District Supplemental Comments |
03.04.10 |
About NERC |
| Comments on Revised Regional Delegation Agreements - Southwest Power Pool, Inc. |
02.24.10 |
About NERC |
| Comments on the BPS TIER Report |
10.28.09 |
About NERC |
| Comments on the Discussion Paper - Joint Comments from APPA, EEI and NRECA |
12.09.09 |
About NERC |
| Comments on the Discussion Paper - MRC Sector 2 Members |
11.30.09 |
About NERC |
| Comments on the Discussion Paper - Southwest Power Pool |
11.30.09 |
About NERC |
| Comments on the NOPR for Version Two FAC Standards |
11.24.08 |
About NERC |
| Comments on WECC Regional Reliability Standard NOPR |
01.12.09 |
About NERC |
| Comments Received on GOTO Draft Paper Posting |
10.16.09 |
Standards |
| Comments Regarding the Proposed Policy Statement on Penalty Guidelines |
06.14.10 |
About NERC |
| Communications and Coordination |
11.02.09 |
Compliance |
| Communications and Coordination |
11.01.06 |
Standards |
| Complaint Form |
05.30.06 |
Programs |
| Compliance Analysis Report: CIP-004-1 |
12.09.09 |
Compliance |
| Compliance Analysis Report: CIP-001 |
05.12.10 |
Compliance |
| Compliance Analysis Report: FAC-008-1 and FAC-009-1 |
02.19.10 |
Compliance |
| Compliance Analysis Report: PRC-005-1 |
12.07.09 |
Compliance |
| Compliance Analysis Report: VAR-002 |
08.10.10 |
Compliance |
| Compliance and Certification Committee Hearing Procedures, Hearing Procedures for Use in Appeals, and Mediation Procedures |
06.10.10 |
About NERC |
| Compliance Application Notice: CIP-002-3 R3 (Original Posting: 06/22/10) |
07.06.10 |
Compliance |
| Compliance Application Notice: INT-004-2 R1 |
05.05.10 |
Compliance |
| Compliance Application Notice: IRO-004-1 R3 |
05.05.10 |
Compliance |
| Compliance Application Notice: IRO-006-4.1 R2 |
05.05.10 |
Compliance |
| Compliance Application Notice: TOP-003-0 R1.3 |
05.05.10 |
Compliance |
| Compliance Audit Timeline |
09.03.08 |
Compliance |
| Compliance Enforcement Coordinator |
04.08.10 |
About NERC |
| Compliance Filing and Assessment of the BES Definition Report of NERC and NPCC |
09.21.09 |
About NERC |
| Compliance Filing and Petition for Approval of an Implementation Plan for CIP Reliability Standards |
09.15.09 |
About NERC |
| Compliance Filing in Response to April 23 Letter Order |
04.30.09 |
About NERC |
| Compliance Filing in Response to December 17, 2009 FERC Order Regarding Scope of Systems |
01.19.10 |
About NERC |
| Compliance Filing in Response to February 19, 2009 Order |
04.06.09 |
About NERC |
| Compliance Filing in Response to FERC Order 713-A |
06.22.09 |
About NERC |
| Compliance Filing in Response to FERC Order 716- Revised VRFs |
12.18.09 |
About NERC |
| Compliance Filing in Response to FERC's January 21, 2010 Order Concering Appendix 4D to the NERC ROP |
04.21.10 |
About NERC |
| Compliance Filing in Response to FERC's March 18, 2010 Order No. 733 Approving PRC-023-1 |
07.16.10 |
About NERC |
| Compliance Filing In Response to June 1, 2009 FERC Order |
07.30.09 |
About NERC |
| Compliance Filing in Response to October 15, 2009 Order on the 2010 Business Plan and Budget |
12.11.09 |
About NERC |
| Compliance Filing in Response to Order No. 716 and Petiton for Approval of NUC Reliability Standard |
08.14.09 |
About NERC |
| Compliance Filing in Response to Order No. 722 |
07.06.09 |
About NERC |
| Compliance Filing in Response to Order No. 722 - Version 2 Facilities Design, Connections, and Maintenance Reliability Standards. |
05.29.09 |
About NERC |
| Compliance Filing in Response to Order No. 723 |
08.28.09 |
About NERC |
| Compliance Filing in Response to Order No. 723, Proposed VSLs for WECC Regional Reliability Standard |
10.23.09 |
About NERC |
| Compliance Filing in Response to Order No. 733- Revisd VRFs and VSLs for PRC-023-1 |
04.19.10 |
About NERC |
| Compliance Filing in response to Order on Compliance Filing- Mandatory Reliability Standards for the CIP VRFs |
06.30.09 |
About NERC |
| Compliance Filing in response to P 107 Order No. 716 |
11.17.08 |
About NERC |
| Compliance Filing in Response to Paragraph 223 of Order No. 890 |
11.21.08 |
About NERC |
| Compliance Filing in Response to Paragraph 223 of Order No. 890 |
08.29.08 |
About NERC |
| Compliance Filing in Response to Paragraph 47 of the June 19, 2008 Order |
12.19.08 |
About NERC |
| Compliance Filing in Response to Paragraph 50 of Order No. 713 |
09.11.08 |
About NERC |
| Compliance Filing in Response to Paragraph 629 of Order No. 693 |
06.01.09 |
About NERC |
| Compliance Filing in Response to Paragraph 76 of the November 20, 2008 Order |
12.19.08 |
About NERC |
| Compliance Filing in Response to Paragraph 951 of Order No. 693 |
10.31.08 |
About NERC |
| Compliance Filing in Response to the December 19, 2008 Order |
02.17.09 |
About NERC |
| Compliance Filing in Response to the March 18, 2010 Order on VSL Assignments for CIP Standards |
05.17.10 |
About NERC |
| Compliance Filing in response to the October 16, 2008 Order on the 2009 Business Plan and Budget Filing |
12.15.08 |
About NERC |
| Compliance Filing in Response to the Order on VSL Proposed by the ERO and a Request for an Extension of Time |
03.05.10 |
About NERC |
| Compliance Filing in Response to the September 30, 2009 Order |
12.29.09 |
About NERC |
| Compliance Filing of NERC and FRCC in Response to FERC's December 19, 2008 Order |
06.30.10 |
About NERC |
| Compliance Filing of NERC and NPCC in Response to December 18 Order |
02.20.09 |
About NERC |
| Compliance Filing of NERC and NPCC in Response to FERC's December 19th, 2008 Order |
06.30.10 |
About NERC |
| Compliance Filing of NERC and SPP in Response to September 17, 2009 Order |
12.01.09 |
About NERC |
| Compliance Filing of NERC in Response to December 20, 2007 Order |
07.31.08 |
About NERC |
| Compliance Filing of NERC in Response to Order on Reliability Enhancement Programs |
07.21.08 |
About NERC |
| Compliance Filing of NERC in response to Paragraph 40 of the Order on VSLs Proposed by the ERO |
07.21.08 |
About NERC |
| Compliance Filing of NERC in response to the Commission's May 16, 2008 Order |
07.25.08 |
About NERC |
| Compliance Filing of the NERC and NPCC, Inc. in Response to Paragraph 174 of March 21, 2008 Commission Order |
05.19.08 |
About NERC |
| Compliance Filing of the NERC in Response to December 20, 2007 Order |
03.04.08 |
About NERC |
| Compliance Filing of the NERC in response to June 19, 2008 Order |
07.21.08 |
About NERC |
| Compliance Filing of the NERC in response to March 21, 2008 Order |
07.21.08 |
About NERC |
| Compliance Filing of the NERC in Response to Para. 135 of Order No. 705 |
04.01.08 |
About NERC |
| Compliance Filing of the NERC in Response to the Commission's February 21, 2008 Order |
05.16.08 |
About NERC |
| Compliance Filing of the NERC in Response to the Commission's June 7, 2007 Order |
03.03.08 |
About NERC |
| Compliance Filing of the NERC in Response to the October 18, 2007 Order |
01.15.08 |
About NERC |
| Compliance Filing of the NERC in response to the Paragraph 757 of Order No. 706 |
06.27.08 |
About NERC |
| Compliance Filing Regarding Consistency of WECC |
11.02.07 |
About NERC |
| Compliance Issuances Second Quarter Report |
07.06.10 |
Compliance |
| Compliance Monitoring Processes Timeline |
08.28.08 |
Compliance |
| Compliance Operations Administrative Assistant |
08.10.10 |
About NERC |
| Compliance Process Evaluation Report |
12.15.09 |
Compliance |
| Compliance Registry Appeal Decision on Remand |
10.06.08 |
About NERC |
| Compliance Registry Change Activity (By Entity Name) |
08.27.10 |
Compliance |
| Compliance Registry Change Activity (By NCR ID#) |
08.27.10 |
Compliance |
| Compliance Registry List |
08.27.10 |
Compliance |
| Compliance Registry Listing (by Entity Name) |
08.27.10 |
Compliance |
| Compliance Registry Listing (by NERC ID) |
08.27.10 |
Compliance |
| Compliance Registry Listing (Excel) |
08.27.10 |
Compliance |
| Compliance Registry Summary |
08.27.10 |
Compliance |
| Compliance Violation Investigation Timeline |
09.04.08 |
Compliance |
| Compliance Violation Statistics - 4th Quarter 2008 |
02.20.09 |
Compliance |
| Compliance Violation Statistics - April 2009 |
05.12.09 |
Compliance |
| Compliance Violation Statistics - April 2010 |
05.17.10 |
Compliance |
| Compliance Violation Statistics - August 2009 |
09.16.09 |
Compliance |
| Compliance Violation Statistics - December 2009 |
01.21.10 |
Compliance |
| Compliance Violation Statistics - February 2009 |
03.24.09 |
Compliance |
| Compliance Violation Statistics - February 2010 |
03.19.10 |
Compliance |
| Compliance Violation Statistics - January 2009 |
03.09.09 |
Compliance |
| Compliance Violation Statistics - January 2010 |
02.17.10 |
Compliance |
| Compliance Violation Statistics - July 2009 |
08.11.09 |
Compliance |
| Compliance Violation Statistics - July 2010 |
08.12.10 |
Compliance |
| Compliance Violation Statistics - June 2009 |
07.14.09 |
Compliance |
| Compliance Violation Statistics - June 2010 |
08.11.10 |
Compliance |
| Compliance Violation Statistics - March 2009 |
04.24.09 |
Compliance |
| Compliance Violation Statistics - March 2010 |
04.22.10 |
Compliance |
| Compliance Violation Statistics - May 2009 |
06.16.09 |
Compliance |
| Compliance Violation Statistics - May 2010 |
06.29.10 |
Compliance |
| Compliance Violation Statistics - November 2009 |
12.01.09 |
Compliance |
| Compliance Violation Statistics - October 2009 |
11.10.09 |
Compliance |
| Compliance Violation Statistics - September 2009 |
10.15.09 |
Compliance |
| Conflict of Interest and Business Ethics Policy for Trustees, Officers, and Employees |
07.30.08 |
About NERC |
| Consideration of Comments FM V4 and Associated Technical Reference |
12.02.08 |
Standards |
| Constellation Energy Commodities Group, Inc. |
11.07.07 |
Compliance |
| Constellation Energy Commodities Group, Inc. (CCG) |
05.22.08 |
Compliance |
| Contingency Reserve (WECC) |
10.29.08 |
Standards |
| Continuing Education Program Administrative Manual (Ver 4.1) |
03.30.09 |
Programs |
| Control Labeling of Generator Voltage Regulators |
06.23.10 |
About NERC |
| Coordination of Plan for New Generation, Transmission, and End-User |
11.02.09 |
Compliance |
| Coordination of Plans For New Generation, Transmission, and End-User |
02.05.05 |
Standards |
| Coordination of Plans For New Generation, Transmission, and End-User Facilities |
08.05.10 |
Standards |
| Coordination of Real-time Activities Between Reliability Coordinators |
02.07.06 |
Standards |
| Coordination of Real-time Activities Between Reliability Coordinators |
01.13.10 |
Compliance |
| Cordova Energy Company, LLC |
08.19.08 |
Compliance |
| CORRECTED- Compliance Filing of NERC in response to June 19, 2008 Order |
07.25.08 |
About NERC |
| Course Data Form |
02.25.10 |
Programs |
| Critical Cyber Asset Identification |
05.02.06 |
Standards |
| Critical Energy Infrastructure Information |
06.21.05 |
About NERC |
| Crowe Horwath LLP, Agreed-Upon Procedures Report for ReliabilityFirst Corporation |
04.07.10 |
Compliance |
| Crowe Horwath, LLP Agreed-Upon Procedurees Report for Midwest Reliability Organization |
08.12.10 |
Compliance |
| Crowe Horwath, LLP Agreed-Upon Procedures Report for NPCC |
07.06.10 |
Compliance |
| Crowe Horwath, LLP Agreed-Upon Procedures Report for SERC Reliability Corporation |
05.03.10 |
Compliance |
| Cyber Security - Critical Cyber Asset Identification |
05.06.09 |
Standards |
| Cyber Security - Critical Cyber Asset Identification |
12.16.09 |
Standards |
| Cyber Security - Critical Cyber Asset Identification |
01.13.10 |
Compliance |
| Cyber Security - Electronic Security Perimeter(s) |
01.13.10 |
Compliance |
| Cyber Security - Electronic Security Perimeter(s) |
12.16.09 |
Standards |
| Cyber Security - Electronic Security Perimeter(s) |
02.16.10 |
Standards |
| Cyber Security - Electronic Security Perimeter(s) |
05.06.09 |
Standards |
| Cyber Security - Incident Reporting and Response Planning |
05.06.09 |
Standards |
| Cyber Security - Incident Reporting and Response Planning |
12.16.09 |
Standards |
| Cyber Security - Incident Reporting and Response Planning |
01.13.10 |
Compliance |
| Cyber Security - Personnel & Training |
12.16.09 |
Standards |
| Cyber Security - Personnel & Training |
05.06.09 |
Standards |
| Cyber Security - Personnel and Training |
01.13.10 |
Compliance |
| Cyber Security - Physical Security of Critical Cyber Assets |
01.13.10 |
Compliance |
| Cyber Security - Physical Security of Critical Cyber Assets |
12.16.09 |
Standards |
| Cyber Security - Physical Security of Critical Cyber Assets |
02.16.10 |
Standards |
| Cyber Security - Physical Security of Critical Cyber Assets |
05.06.09 |
Standards |
| Cyber Security - Recovery Plans for Critical Cyber Assets |
05.06.09 |
Standards |
| Cyber Security - Recovery Plans for Critical Cyber Assets |
12.16.09 |
Standards |
| Cyber Security - Recovery Plans for Critical Cyber Assets |
01.13.10 |
Compliance |
| Cyber Security - Security Management Controls |
01.13.10 |
Compliance |
| Cyber Security - Security Management Controls |
12.16.09 |
Standards |
| Cyber Security - Security Management Controls |
05.06.09 |
Standards |
| Cyber Security - Systems Security Management |
11.05.09 |
Standards |
| Cyber Security - Systems Security Management |
12.16.09 |
Standards |
| Cyber Security - Systems Security Management |
01.13.10 |
Compliance |
| Cyber Security Threat and Vulnerability Program Manager |
03.01.10 |
About NERC |
| Data Collection for Demand-Side Management |
12.01.07 |
Assessments & Trends |
| Data From the Regional Reliability Organization Needed to Assess Reliability |
04.15.09 |
Standards |
| Data From the Regional Reliability Organization Needed to Assess Reliability |
02.02.05 |
Standards |
| Define Regional Disturbance Monitoring and Reporting Requirements |
08.02.06 |
Standards |
| Delegation Agreement Between NERC and WECC |
06.29.09 |
About NERC |
| Deliverable Capacity Resources Summer |
03.04.10 |
Assessments & Trends |
| Deliverable Capacity Resources Winter |
03.04.10 |
Assessments & Trends |
| Department of Energy; Southeastern Power Administration |
09.27.07 |
Compliance |
| Development and Documentation of Regional UFLS Programs |
02.02.05 |
Standards |
| Development of Dynamics System Models |
02.02.05 |
Standards |
| Development of Dynamics System Models |
10.29.08 |
Standards |
| Development of Steady-State System Models |
02.02.05 |
Standards |
| Direct Energy Services, LLC |
08.27.07 |
Compliance |
| Directions to NERC's DC Office |
04.10.08 |
About NERC |
| Directions to NERC's Princeton Office |
04.10.08 |
About NERC |
| Discussion Paper for Regional Delegation Agreement Workshop |
10.26.09 |
About NERC |
| Disturbance Control Performance |
05.10.10 |
Compliance |
| Disturbance Control Performance |
02.02.05 |
Standards |
| Disturbance Control Performance |
08.05.10 |
Standards |
| Disturbance Monitoring Equipment Installation and Data Reporting |
08.02.06 |
Standards |
| Disturbance Monitoring Equipment Installation and Data Reporting |
01.13.10 |
Compliance |
| Disturbance Reporting |
11.01.06 |
Standards |
| Disturbance Reporting |
05.10.10 |
Compliance |
| Documentation of Blackstart Generating Unit Test Results |
11.02.09 |
Compliance |
| Documentation of Blackstart Generating Unit Test Results |
02.02.05 |
Standards |
| Documentation of Data Reporting Requirements for Actual and Forecast Demands |
10.29.08 |
Standards |
| Documentation of Data Reporting Requirements for Actual and Forecast Demands, |
11.24.08 |
Compliance |
| Documentation of the Accounting Methodology for the Effects of Controllable Demand-Side Management |
11.24.08 |
Compliance |
| Documentation of the Accounting Methodology for the Effects of Controllable DSM in Demand and Energy Forecasts |
04.15.09 |
Standards |
| Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts |
08.05.10 |
Standards |
| Documentation of the Use of Capacity Benefit Margin |
11.24.08 |
Compliance |
| Documentation of the Use of Capacity Benefit Margin |
02.02.05 |
Standards |
| Draft Compliance Application Notice: CIP-004-2 R4.2 and CIP-004-3 R4.2 |
07.30.10 |
Compliance |
| Draft Compliance Application Notice: EOP-005-1 R7 |
07.30.10 |
Compliance |
| Draft for Comment of the National Action Plan on Demand Response |
03.11.10 |
About NERC |
| DRAFT Report from the Ad Hoc Group for Generator Requirements at the Transmission Interface |
08.14.09 |
Standards |
| Drafting Team Guidelines |
05.04.09 |
Standards |
| Duke Energy Comments |
05.29.09 |
About NERC |
| Dynamic Interchange Transaction Modifications |
10.09.07 |
Standards |
| Dynamic Interchange Transaction Modifications |
05.10.10 |
Compliance |
| Dynamics Data for Modeling and Simulation of the Interconnected Transmission System |
02.02.05 |
Standards |
| Dynamics Data for Transmission System Modeling and Simulation |
05.10.10 |
Compliance |
| E-mail Annoucement - Comment Period Opens regarding Proposed Changes to Regional Delegation Agreements |
01.29.10 |
About NERC |
| e-Tag 1.8.000 Schema |
10.09.07 |
Programs |
| e-Tagging Functional Specifications (Version 1.8.0) - Redline Version |
11.07.07 |
Programs |
| e-Tagging Functional Specifications - Version 1.8.0 |
11.07.07 |
Programs |
| ECAR Compliance Enforcement Program Audit Report - January 6, 2005 |
08.16.05 |
Compliance |
| ECAR Response to NERC Audit Report |
08.16.05 |
Compliance |
| EEA 3 Report - Alabama Electric Cooperative, Inc. (12/14/07) |
12.24.07 |
Events Analysis |
| EEA 3 Report - Alabama Electric Cooperative, Inc. (8/29/07) |
08.29.07 |
Events Analysis |
| EEA 3 Report - Alberta Electric System Operator |
09.30.09 |
Events Analysis |
| EEA 3 Report - City of Conway (8/29/07) |
08.29.07 |
Events Analysis |
| EEA 3 Report - City of North Little Rock (8/29/07) |
08.29.07 |
Events Analysis |
| EEA 3 Report - CNWY (03/03/09) |
03.03.09 |
Events Analysis |
| EEA 3 Report - Constellation Energy (4/14/08) |
04.29.08 |
Events Analysis |
| EEA 3 Report - Conway (CNWY) (11/16/08) |
11.16.08 |
Events Analysis |
| EEA 3 Report - DERS (5/3/2008) |
05.12.08 |
Events Analysis |
| EEA 3 Report - DERS (6/24/08) Rev. 1 |
06.30.08 |
Events Analysis |
| EEA 3 Report - HGMA (12/24/07) |
12.24.07 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (05/23/10) |
06.01.10 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (05/24/10) |
06.01.10 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (06/024//09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (06/23//09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (06/25/09) |
07.27.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (06/26//09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (06/29/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/01/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/02/09) |
07.30.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/03/09) |
07.27.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/06/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/08/09) |
07.15.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/09/09) |
07.13.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/10/09) |
07.30.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/13/09) |
07.30.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/14/09) |
07.30.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/25/08) |
07.25.08 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (07/27/08) |
07.27.08 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (08/17/09) |
08.20.09 |
Events Analysis |
| EEA 3 Report - Lafayette Utilities System (10/07/09) |
10.14.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (01/11/10) |
01.15.10 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/19//09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/23/09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/24/09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/25/09) |
07.14.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/26/09) |
07.27.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/29/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (06/30/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/01/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/02/09) |
07.13.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/03/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/06/09) |
07.08.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/13/09) |
07.27.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (07/14//09) |
07.27.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (08/05/09) |
08.26.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (09/08/08) |
09.08.08 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (10/05/09) |
10.26.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (10/06/09) |
10.28.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (10/07/09) |
10.14.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority (10/14/09) |
10.26.09 |
Events Analysis |
| EEA 3 Report - Louisiana Energy & Power Authority LEPA (05/23/10) |
06.01.10 |
Events Analysis |
| EEA 3 Report - Nova Scotia Power (04/09/09) |
04.09.09 |
Events Analysis |
| EEA 3 Report - PacifiCorp East Balancing Authority Area (2/14/08) |
02.14.08 |
Events Analysis |
| EEA 3 Report - PowerSouth Energy Cooperative |
07.20.10 |
Events Analysis |
| EEA 3 Report - PowerSouth Energy Cooperative |
08.03.10 |
Events Analysis |
| EEA 3 Report - PowerSouth Energy Cooperative |
08.17.10 |
Events Analysis |
| EEA 3 Report - SECI (07/22/08) |
07.22.08 |
Events Analysis |
| EEA 3 Report - Westar Energy (12/11/07) |
12.11.07 |
Events Analysis |
| EEI Comments |
05.29.09 |
About NERC |
| Election Procedure for Members of NERC Standards Committee |
01.18.07 |
About NERC |
| Electronic Security Perimeter(s) |
05.02.06 |
Standards |
| Electronic Security Perimeter(s) |
02.16.10 |
Standards |
| Emergency Operations Planning |
08.05.09 |
Standards |
| Emergency Operations Planning |
02.02.05 |
Standards |
| Emergency Operations Planning |
10.17.08 |
Standards |
| Emergency Operations Planning |
11.02.09 |
Compliance |
| EMS-SCADA Systems - Training System vs. Live EMS Screen |
04.14.10 |
About NERC |
| EOE100-5- WAPA-UGPR - (06/25-06/28) |
07.31.08 |
Programs |
| EOE101-21- Wisconsin Energy Corporation - (05/07-05/10) |
07.31.08 |
Programs |
| EOE102-10 - Tennessee Valley Authority - (03/12-03/15) |
07.31.08 |
Programs |
| EOE103-10 - Midwest Energy |
02.11.09 |
Programs |
| EOE104-10 - Entergy Services, Inc. - (12/03-12/06) |
02.24.09 |
Programs |
| EOE105-10 - PJM Interconnection, L.L.C. - (05/21-05/24) |
02.26.09 |
Programs |
| EOE106-10 - Potomac Electric Power Co. - (10/06-10/08) |
09.15.09 |
Programs |
| EOE14-11 - Western Area Power Administration - Upper Great Plains Region (8/24-25/04) |
07.13.05 |
Programs |
| EOE17-01 - ITC Transmission Company - (04/24/08) |
02.24.09 |
Programs |
| EOE33-11 - FirstEnergy Corp. (2/26-27/04) |
10.02.05 |
Programs |
| EOE33-12 - Florida Power & Light - (04/09-04/12) |
02.25.09 |
Programs |
| EOE33-13 - Pacific Northwest Security Coordinator - (07/3-08/02) |
02.26.09 |
Programs |
| EOE59-4 - Seattle City Light (08/23-26/05) |
06.07.06 |
Programs |
| EOE70-18 - Western Area Power Administration - Sierra Nevada Region (9/7-9/05) |
06.07.06 |
Programs |
| EOE72-13 - Great River Energy (8/23-25/05) |
06.07.06 |
Programs |
| EOE78-13 - Sierra Pacific Power Company (5/8-11/06) |
02.15.07 |
Programs |
| EOE81-5 - Idaho Power Company (5/22-26/06) |
02.15.07 |
Programs |
| EOE82-2 - Independence Power and Light Department (10/25-27/05) |
02.15.07 |
Programs |
| EOE85-15 - Great River Energy (8/23-25/05) |
02.15.07 |
Programs |
| EOE86-8 - East Kentucky Power Cooperative, Inc. (11/1-3/05) |
02.15.07 |
Programs |
| EOE87-10 - City Water, Light & Power (11/8-10/05) |
02.15.07 |
Programs |
| EOE88-10 - Midwest Independent Transmission System Operator (11/9-16/06) |
05.10.07 |
Programs |
| EOE89-10 - Midwest Independent Transmission System Operator (11/9-16/06) |
05.10.07 |
Programs |
| EOE90-30 - Midwest Independent Transmission System Operator (11/9-16/06) |
05.10.07 |
Programs |
| EOE91-10 - Midwest Independent Transmission System Operator (11/9-16/06) |
05.10.07 |
Programs |
| EOE92-5 - Midwest Independent Transmission System Operator (11/9-16/06) |
05.10.07 |
Programs |
| EOE93-12 - Midwest Independent Transmission System Operator (11/9-16/06) |
05.10.07 |
Programs |
| EOE94-19 - FirstEnergy (4/24/07) |
05.31.07 |
Programs |
| EOE95-20 - Commonwealth Edison (11/6-9/06) |
06.14.07 |
Programs |
| EOE96-6 - Duke Energy Midwest (10/16-19/06) |
07.18.07 |
Programs |
| EOE97-5 - British Columbia Transmission Corporation (6/26-29/06) |
07.18.07 |
Programs |
| EOE98-20- American Electric Power - (04/23-04/26) |
07.31.07 |
Programs |
| EOE99-22- Tennessee Valley Authority - (03/12-03/15) |
07.31.08 |
Programs |
| Eratta Filing Regarding Notice of Penalty NP10-110-000 |
06.21.10 |
About NERC |
| ERCOT Compliance Enforcement Program Audit Report - March 21-22, 2006 |
07.13.06 |
Compliance |
| ERCOT Response to NERC Audit Report |
07.13.06 |
Compliance |
| ERO Application - Transmittal Letter (Alberta) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (British Columbia) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (Manitoba) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (NEB) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (New Brunswick) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (Nova Scotia) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (Ontario) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (Quebec) |
04.04.06 |
About NERC |
| ERO Application - Transmittal Letter (Saskatchewan) |
04.04.06 |
About NERC |
| ERO Interpretations of Specific Requirements of BAL-003-0 and VAR- 001-1 Reliability Standards |
05.21.09 |
About NERC |
| Errata - Approval of 15 Reliability Standards that contain errata changes |
02.06.09 |
About NERC |
| Errata letter regarding PRC-023-1 (Alberta) |
05.13.09 |
About NERC |
| Errata letter regarding PRC-023-1 (British Columbia) |
05.05.09 |
About NERC |
| Errata letter regarding PRC-023-1 (Manitoba) |
05.05.09 |
About NERC |
| Errata letter regarding PRC-023-1 (National Energy Board) |
05.05.09 |
About NERC |
| Errata letter regarding PRC-023-1 (New Brunswick) |
05.05.09 |
About NERC |
| Errata letter regarding PRC-023-1 (Ontario) |
05.05.09 |
About NERC |
| Errata letter regarding PRC-023-1 (Quebec) |
05.05.09 |
About NERC |
| Errata letter regarding PRC-023-1 (Saskatchewan) |
05.05.09 |
About NERC |
| Errata Notice - Modification of Interchange and TLR Reliability Standards; |
03.19.09 |
About NERC |
| Errata Notice for Order 729 |
12.04.09 |
About NERC |
| Errata Petition of NERC for Approval of Two Standards |
07.28.08 |
About NERC |
| Errata to Notice of Penalty NP10-60-000 |
03.12.10 |
About NERC |
| Errata to Notice of Penalty NP10-86-000 |
04.09.10 |
About NERC |
| Errata to November 20, 2008 Filing |
12.01.08 |
About NERC |
| Errata to Petition for Approval of Amendments to the NERC ROP Regarding the CCC Program and Charter |
03.16.10 |
About NERC |
| Errata to the Footnotes in Three Letter Orders Issued by the Commission on January 29, 2010 |
02.02.10 |
About NERC |
| Errata to the July 30, 2008 Filing - Petition for Approval of PRC-023-1 Reliability Standard |
02.04.09 |
About NERC |
| Errata to the Order Addressing the CIP VSLs |
03.23.10 |
About NERC |
| Errata- April 19, 2010 Request of NERC for Rehearing and Motion for Stay in the Order Setting Deadline for Compliance |
04.20.10 |
About NERC |
| Establish and Communicate Facility Ratings |
11.02.09 |
Compliance |
| Establish and Communicate Facility Ratings |
02.07.06 |
Standards |
| Establish and Communicate System Operating Limits |
11.02.09 |
Compliance |
| Establish and Communicate System Operating Limits |
06.24.08 |
Standards |
| Establish and Communicate Transfer Capabilities |
02.07.06 |
Standards |
| Establish and Communicate Transfer Capabilities |
11.02.09 |
Compliance |
| Establish, Maintain, and Document a Regional Blackstart Capability Plan |
02.02.05 |
Standards |
| Exam Statistics |
01.27.10 |
Programs |
| Executed Amended and restated delegation Agreement Between NERC and FRCC |
01.03.09 |
About NERC |
| Executed Amended and Restated Delegation Agreement Between NERC and MRO |
01.03.09 |
About NERC |
| Executed Amended and Restated Delegation Agreement Between NERC and NPCC |
01.03.09 |
About NERC |
| Executed Amended and Restated Delegation Agreement Between NERC and RFC |
01.03.09 |
About NERC |
| Executed Amended and Restated Delegation Agreement Between NERC and SERC Reliability Corporation |
01.03.09 |
About NERC |
| Executed Amended and Restated Delegation Agreement Between NERC and SPP |
01.03.09 |
About NERC |
| Executed Amended and Restated Delegation Agreement Between NERC and WECC |
01.03.09 |
About NERC |
| Exelon Comments |
05.29.09 |
About NERC |
| Facilities Design, Connections and Maintenance Reliability Standards (Issued 12/27/07) |
12.27.07 |
About NERC |
| Facilities Design, Connections and Maintenance Reliability Standards (Issued 8/13/07) |
08.13.07 |
About NERC |
| Facility Connection Requirements |
02.02.05 |
Standards |
| Facility Connection Requirements |
11.02.09 |
Compliance |
| Facility Ratings Methodology |
02.07.06 |
Standards |
| Facility Ratings Methodology |
11.02.09 |
Compliance |
| Fault Induced Delayed Voltage Recovery (FIDVR) Conference Presentation |
04.22.08 |
About NERC |
| Fault Induced Delayed Voltage Recovery (FIDVR) Conference Presentation |
09.29.09 |
About NERC |
| Federal Agencies Contact List |
07.22.09 |
Compliance |
| FERC Approval of 706B Implementation |
03.19.10 |
Compliance |
| FERC Approves Three Planning and Operating Reliability Standards |
12.20.07 |
About NERC |
| FERC Order - Requiring for the Compliance Filing from NERC |
03.08.10 |
Compliance |
| FERC Order 706 |
03.08.10 |
Compliance |
| FERC Order 706-B |
03.08.10 |
Compliance |
| FERC Staff Preliminary Assessment of the NERC Proposed Mandatory Reliability Standards |
05.11.06 |
About NERC |
| FERC's 2009 Report on Enforcement |
12.17.09 |
About NERC |
| FERC's Criteria for Approving Reliability Standards |
03.16.10 |
Standards |
| Filing of NPCC Amended and Restated Bylaws |
11.29.07 |
About NERC |
| Filing of Reliability Enhancement Programs |
11.02.07 |
About NERC |
| Filing of the 2007 Business Plan and Budget (Alberta) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (British Columbia) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (Manitoba) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (NEB) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (New Brunswick) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (Nova Scotia) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (Ontario) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (Quebec) |
08.23.06 |
About NERC |
| Filing of the 2007 Business Plan and Budget (Saskatchewan) |
08.23.06 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Alberta) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (British Columbia) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Manitoba) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (NEB) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (New Brunswick) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Nova Scotia) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Ontario) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Quebec) |
09.12.07 |
About NERC |
| Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Saskatchewan) |
09.12.07 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Alberta) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (British Columbia) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Manitoba) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (National Energy Board) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (New Brunswick) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Nova Scotia) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Ontario) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Quebec) |
09.17.08 |
About NERC |
| Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Saskatchewan) |
09.17.08 |
About NERC |
| Final Report from the Ad Hoc Group for Generator Requirements at the Transmission Interface |
11.16.09 |
Standards |
| First Energy Comments |
05.29.09 |
About NERC |
| First Quarter 08 Entity Quality Performance Indicator |
01.05.09 |
Compliance |
| First Quarter 09 Entity Quality Performance Indicator |
05.11.09 |
Compliance |
| First Quarter 2010 Compliance Filing in Response to Order No. 693 |
06.01.10 |
About NERC |
| First Results-based Standard Draft |
03.18.10 |
About NERC |
| Five Proposed INT Reliability Standards (British Columbia) |
05.05.09 |
About NERC |
| Five Proposed Reliability Standards (Alberta) |
05.13.09 |
About NERC |
| Five Proposed Reliability Standards (National Energy Board) |
05.05.09 |
About NERC |
| Flowgate Methodology |
02.10.09 |
Standards |
| Forecasts of Interruptible Demands and DCLM Data |
11.24.08 |
Compliance |
| Formal Interpretation to Reliability Standard TOP-002-2 (Alberta) |
05.13.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (British Columbia) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (Manitoba) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (National Energy Board) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (New Brunswick) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (Ontario) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (Quebec) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard TOP-002-2 (Saskatchewan) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (Alberta) |
05.13.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (British Columbia) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (Manitoba) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (National Energy Board) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (New Brunswick) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (Ontario) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (Quebec) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standard VAR-002-1a (Saskatchewan) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Alberta) |
05.13.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (British Columbia) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Manitoba) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (National Energy Board) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (New Brunswick) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Ontario) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Quebec) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Saskatchewan) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (British Columbia) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (Manitoba) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (National Energy Board) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (New Brunswick) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (Ontario) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (Quebec) |
05.05.09 |
About NERC |
| Formal Interpretation to Reliability Standards regarding BAL-005-0 (Saskatchewan) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Alberta) |
05.13.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (British Columbia) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Manitoba) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (National Energy Board) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (New Brunswick) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Ontario) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Quebec) |
05.05.09 |
About NERC |
| Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Saskatchewan) |
05.05.09 |
About NERC |
| Fourth Quarter 08 Entity Quality Performance Indicator |
01.05.09 |
Compliance |
| Fourth Quarter 2009 Compliance Filing in Response to Order No. 693 |
03.01.10 |
About NERC |
| FRCC 2009 Implementation |
04.09.09 |
Compliance |
| FRCC 2010 Implementation Plan |
12.10.09 |
Compliance |
| FRCC Comments |
05.21.09 |
About NERC |
| FRCC Compliance Enforcement Program Audit Report - April 12, 2005 |
11.23.05 |
Compliance |
| FRCC Response to NERC Audit Report |
11.23.04 |
Compliance |
| Frequency Response and Bias |
11.02.09 |
Compliance |
| Frequency Response and Bias |
10.29.08 |
Standards |
| Frequently Asked Questions About NERC Membership |
04.10.08 |
About NERC |
| Functional Model Technical Document - Version 5 |
01.15.10 |
Standards |
| Functional Model Version 4 and Associated Technical Reference Comments |
04.11.08 |
Standards |
| Functional Model Version 5 |
01.15.10 |
Standards |
| Further Compliance Filing in Response to Paragraph 18 of the February 21 Order |
08.14.08 |
About NERC |
| Further Guidance Order on Filing Reliability Notices of Penalty |
10.26.09 |
About NERC |
| Further Report of NERC in Response to October 15, 2009 Order on Business Plan and Budgets |
05.03.10 |
About NERC |
| Further Status Report of NERC and WECC in response to P 226 of the March 21, 2008 Order |
11.21.08 |
About NERC |
| GADS Data Editor - Software User Guide |
01.02.10 |
Assessments & Trends |
| GADS Data Entry and Edit Program |
06.04.10 |
Assessments & Trends |
| GADS Data Reporting Contacts |
09.02.10 |
Assessments & Trends |
| GADS Data Reporting Instructions (Complete Set) |
12.03.09 |
Assessments & Trends |
| GADS Wind Turbine Generation Data Reporting Instructions |
08.09.10 |
Assessments & Trends |
| Generating Unit Availability Following Planned Outages |
06.01.92 |
Assessments & Trends |
| Generating Unit Availability Trends 1984-1988 |
04.01.90 |
Assessments & Trends |
| Generator Operation for Maintaining Network Voltage Schedules |
10.29.08 |
Standards |
| Generator Operation for Maintaining Network Voltage Schedules |
11.02.09 |
Compliance |
| Generator Operation for Maintaining Network Voltage Schedules |
02.10.09 |
Standards |
| Generator Operations for Maintaining Network Voltage Schedules |
08.02.06 |
Standards |
| GOTO Team Roster |
03.13.09 |
Standards |
| Guidance for Enforcement of CIP Standards |
05.15.08 |
Standards |
| Guidance for Enforcement of CIP Standards |
05.14.08 |
Compliance |
| Guidance Order on Conducting Compliance Audits by the ERO and Regional Entities |
01.15.09 |
About NERC |
| Guidance Order on Reliability Notices of Penalty |
07.03.08 |
About NERC |
| Guide to Writing Learning Objectives |
01.17.07 |
Programs |
| High-Impact, Low-Frequency Event Risk to the North American Bulk Power System |
06.02.10 |
About NERC |
| High-Impact, Low-Frequency Risk to the North American Bulk Power System |
06.02.10 |
Programs |
| High-Voltage Transmission Circuit Miles (230kV and above) - 1989-1994 |
11.07.05 |
About NERC |
| High-Voltage Transmission Circuit Miles (230kV and above) - 1995-2004 |
11.07.05 |
About NERC |
| High-Voltage Transmission Circuit Miles (230kV and above) - 2005 |
02.09.07 |
About NERC |
| High-Voltage Transmission Circuit Miles by Voltage (230kV and above) - 2004 |
11.07.05 |
About NERC |
| Hillsborough County, FL, Covanta Hillsborough, Inc. and Hillsborough County Resource Recovery Facility |
07.30.07 |
Compliance |
| Historic Capacity and Demand |
03.04.10 |
Assessments & Trends |
| Impact of FGD Systems |
07.01.91 |
Assessments & Trends |
| Impacts of EPAs Clean Water Act - 316b |
11.04.08 |
Assessments & Trends |
| Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program |
02.02.05 |
Standards |
| Implementation of Critical Control Applications |
04.14.10 |
About NERC |
| Implementation of Interchange |
05.02.06 |
Standards |
| Implementation of Interchange |
11.24.08 |
Compliance |
| Implementing Version 3 of the Operating Reliability Data Confidentiality Agreement |
05.15.09 |
About NERC |
| Inadvertent Interchange |
10.29.08 |
Standards |
| Inadvertent Interchange |
05.02.06 |
Standards |
| Inadvertent Interchange |
11.02.09 |
Compliance |
| Incident Reporting and Response Planning |
05.02.06 |
Standards |
| Individual Learning Activity Application - Ver 4.3 |
01.20.10 |
Programs |
| Informational Filing in response to Paragraph 629 of Order No. 693 |
04.30.09 |
About NERC |
| Informational Filing of 2 |