Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  


Below is the NERC eLibrary, a central listing of downloadable documents and reports from nerc.com. These files are also available in their respective departments.


eLibrary: Full NERC File List        All Departments



Filter e-Library by:                   
DOCUMENT TITLE DATE DEPARTMENT
EEA 3 Report - Lafayette Utilities System (06/30/09) 07.08.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/09/09) 07.13.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (10/05/09) 10.14.08 Events Analysis
Formal Interpretation to Reliability Standards regarding BAL-005-0 (Alberta) 05.13.09 About NERC
Informational Filing of 2010 Development Plan Pursuant to Section 310 of The NERC Rules of Procedure 12.02.09 About NERC
1. General Counsel Memorandum 05.05.10 Programs
1. General Counsel Memorandum 05.05.10 Programs
1. Summary of Proposed Rule Changes 03.16.10 About NERC
15 Reliability Standards That Contain Errata Changes (Alberta) 05.13.09 About NERC
15 Reliability Standards That Contain Errata Changes (British Columbia) 05.05.09 About NERC
15 Reliability Standards That Contain Errata Changes (Manitoba) 05.05.09 About NERC
15 Reliability Standards That Contain Errata Changes (National Energy Board) 05.05.09 About NERC
15 Reliability Standards That Contain Errata Changes (New Brunswick) 05.05.09 About NERC
15 Reliability Standards That Contain Errata Changes (Ontario) 05.05.09 About NERC
15 Reliability Standards That Contain Errata Changes (Quebec) 05.05.09 About NERC
15 Reliability Standards That Contain Errata Changes (Saskatchewan) 05.05.09 About NERC
1989 Geomagnetic Disturbance 08.01.90 Assessments & Trends
1992 System Disturbances 09.19.92 Events Analysis
1993 System Disturbances 09.19.93 Events Analysis
1994 System Disturbances 09.19.94 Events Analysis
1995 System Disturbances 09.19.95 Events Analysis
1996 System Disturbances 10.14.96 Events Analysis
1997 System Disturbances 04.26.97 Events Analysis
1997-2001 Generating Availability Report 03.19.03 Assessments & Trends
1998 System Disturbances 05.16.98 Events Analysis
1998-2002 Generating Availability Report 10.17.03 Assessments & Trends
1999 System Disturbances 03.27.99 Events Analysis
1999-2003 Generating Availability Report 01.26.05 Assessments & Trends
1999-2003 Generating Unit Statistical Brochure - All Units Reporting 01.25.05 Assessments & Trends
1999-2003 Generating Unit Statistical Brochure - Units Reporting Events 01.25.05 Assessments & Trends
2. Industry Phasor Data Sharing Agreement Form 05.05.10 Programs
2. Redlined Text of Proposed Changes to Rules of Procedure 03.16.10 About NERC
2. Researchers Phasor Data Sharing Agreement Form 05.05.10 Programs
2000 NERC Compliance Enforcement Program 11.10.00 Compliance
2000 System Disturbances 09.28.00 Events Analysis
2000-2004 Generating Availability Report 10.31.05 Assessments & Trends
2000-2004 Generating Unit Statistical Brochure - All Units Reporting 09.23.05 Assessments & Trends
2000-2004 Generating Unit Statistical Brochure - Units Reporting Events 09.23.05 Assessments & Trends
2001 NERC Compliance Enforcement Program 04.05.02 Compliance
2001 System Disturbances 04.22.01 Events Analysis
2001-2005 Generating Availability Report 12.01.06 Assessments & Trends
2001-2005 Generating Unit Statistical Brochure - All Units Reporting 11.20.06 Assessments & Trends
2001-2005 Generating Unit Statistical Brochure - Units Reporting Events 11.20.06 Assessments & Trends
2002 NERC Compliance Enforcement Program 05.07.03 Compliance
2002 System Disturbances 08.18.02 Events Analysis
2002-2006 Generating Availability Report 12.01.07 Assessments & Trends
2002-2006 Generating Unit Statistical Brochure - All Units Reporting 11.11.07 Assessments & Trends
2002-2006 Generating Unit Statistical Brochure - Units Reporting Events 11.07.07 Assessments & Trends
2003 Generating Unit Statistical Brochure - All Units Reporting 01.25.05 Assessments & Trends
2003 Generating Unit Statistical Brochure - Units Reporting Events 01.25.05 Assessments & Trends
2003 Long-Term Reliability Assessment 12.23.03 Assessments & Trends
2003 NERC Compliance Enforcement Program 05.19.04 Compliance
2003 Summer Assessment 05.15.03 Assessments & Trends
2003 System Disturbances 02.20.03 Events Analysis
2003-2007 Generating Availability Report 03.26.09 Assessments & Trends
2003-2007 Generating Unit Statistical Brochure - All Units Reporting (Revised 04/09) 04.14.09 Assessments & Trends
2003-2007 Generating Unit Statistical Brochure - Units Reporting Events (Revised 04/09) 04.14.09 Assessments & Trends
2003/2004 Winter Assessment 11.13.02 Assessments & Trends
2004 Generating Unit Statistical Brochure - All Units Reporting 09.23.05 Assessments & Trends
2004 Generating Unit Statistical Brochure - Units Reporting Events 09.23.05 Assessments & Trends
2004 Long-Term Reliability Assessment 09.09.04 Assessments & Trends
2004 NERC Compliance Enforcement Program 05.24.05 Compliance
2004 Summer Assessment 04.11.04 Assessments & Trends
2004 System Disturbances 02.20.04 Events Analysis
2004-2008 Generating Availability Report 08.25.09 Assessments & Trends
2004-2008 Generating Unit Statistical Brochure - All Units Reporting 08.25.09 Assessments & Trends
2004-2008 Generating Unit Statistical Brochure - Units Reporting Events 08.25.09 Assessments & Trends
2004/2005 Winter Assessment 10.18.04 Assessments & Trends
2005 Generating Unit Statistical Brochure - All Units Reporting 11.20.06 Assessments & Trends
2005 Generating Unit Statistical Brochure - Units Reporting Events 11.20.06 Assessments & Trends
2005 Long-Term Reliability Assessment 09.01.05 Assessments & Trends
2005 NERC Compliance Enforcement Program 07.31.06 Compliance
2005 Summer Assessment 05.19.05 Assessments & Trends
2005 System Disturbances 02.20.05 Events Analysis
2005-2008 Generating Unit Statistical Brochure - Units Reporting Events 07.30.10 Assessments & Trends
2005-2009 Generating Availability Report 08.02.10 Assessments & Trends
2005-2009 Generating Unit Statistical Brochure - All Units Reporting 07.30.10 Assessments & Trends
2005/2006 Winter Assessment 10.21.05 Assessments & Trends
2006 Generating Unit Statistical Brochure - All Units Reporting 11.07.07 Assessments & Trends
2006 Generating Unit Statistical Brochure - Units Reporting Events 11.07.07 Assessments & Trends
2006 Long-Term Reliability Assessment 10.16.06 Assessments & Trends
2006 NERC Compliance Enforcement Program 06.06.07 Compliance
2006 Summer Assessment 05.15.06 Assessments & Trends
2006 System Disturbances 02.20.06 Events Analysis
2006/2007 Winter Assessment 11.16.06 Assessments & Trends
2007 Audit Schedule 09.22.08 Compliance
2007 Compliance and Enforcement Program Requirements and Implementation Process (RFC) 12.12.05 Compliance
2007 Compliance Enforcement Plan (SERC) 11.30.06 Compliance
2007 Compliance Enforcemnt Program Implementation Plan (WECC) 12.22.06 Compliance
2007 Compliance Monitoring and Enforcement Program (FRCC) 12.08.06 Compliance
2007 Compliance Monitoring and Enforcement Program Implementation Plan (NPCC) 02.08.07 Compliance
2007 Generating Unit Statistical Brochure - All Units Reporting (Revised 04/09) 04.14.09 Assessments & Trends
2007 Generating Unit Statistical Brochure - Units Reporting Events (Revised 04/09) 04.14.09 Assessments & Trends
2007 Long-Term Reliability Assessment 10.16.07 Assessments & Trends
2007 NERC Compliance Enforcement Program 07.01.08 Compliance
2007 Regional Compliance Monitoring and Enforcement Implementation Plan (MRO) 07.12.07 Compliance
2007 Regional Compliance Plan (SPP) 02.13.07 Compliance
2007 Summer Assessment 05.18.07 Assessments & Trends
2007 System Disturbances 01.30.07 Events Analysis
2007/2008 Winter Assessment 11.19.07 Assessments & Trends
2008 Annual Report 05.06.09 About NERC
2008 Audit Schedule 10.17.08 Compliance
2008 CMEP Reporting Requirements 09.26.07 Compliance
2008 Compliance Monitoring and Enforcement Program Annual Plan (SERC) 12.31.07 Compliance
2008 Compliance Monitoring and Enforcement Program Implementation Plan (FRCC) 12.31.07 Compliance
2008 Compliance Monitoring and Enforcement Program Implementation Plan (RFC) 11.01.07 Compliance
2008 Compliance Monitoring and Enforcement Program Implementation Plan (WECC) 11.01.06 Compliance
2008 Compliance Monitoring and Enforcement Program Manual (SPP) 01.01.08 Compliance
2008 Generating Unit Statistical Brochure - All Units Reporting 08.25.09 Assessments & Trends
2008 Generating Unit Statistical Brochure - Units Reporting Events 08.25.09 Assessments & Trends
2008 Implementation of NERC Compliance Monitoring and Enforcement Program (NPCC) 10.29.07 Compliance
2008 Implementation Plan 09.26.07 Compliance
2008 Long-Term Reliability Assessment 10.31.08 About NERC
2008 Long-Term Reliability Assessment 03.26.09 Assessments & Trends
2008 NERC Compliance Enforcement Program 08.13.09 Compliance
2008 Regional Compliance Monitoring and Enforcement Implementation Plan (MRO) 12.04.07 Compliance
2008 Regional Implementation Plan to Monitor and Enforce Compliance with NERC Reliability Standards (TRE) 11.01.07 Compliance
2008 Summer Assessment 05.14.08 Assessments & Trends
2008-RTA-007 Process Bulletin - Registered Entity Submission of Violation Statements 08.09.10 Compliance
2008-RTA-008 Process Bulletin - NERC Requirements - Electronically-Submitted CMEP Materials 08.09.10 Compliance
2008/2009 Winter Assessment 11.18.08 Assessments & Trends
2009 Annual Report 05.01.10 About NERC
2009 Audit Schedule 11.29.09 Compliance
2009 CE Provider User Guide 01.30.09 Programs
2009 CMEP Reliability Standards - Version 1.2 01.05.09 Compliance
2009 Data - GADS Data Reporting Honor Roll 04.07.10 Assessments & Trends
2009 Generating Unit Statistical Brochure - All Units Reporting 07.30.10 Assessments & Trends
2009 Generating Unit Statistical Brochure - Units Reporting Events 07.30.10 Assessments & Trends
2009 Implementation Plan 10.01.08 Compliance
2009 Long-Term Reliability Assessment 10.29.09 Assessments & Trends
2009 Scenario Reliability Assessment 10.29.09 Assessments & Trends
2009 Summer Assessment 05.19.09 Assessments & Trends
2009 System Disturbances 06.15.10 Events Analysis
2009-2011 Reliability Standards Development Plan 02.03.09 About NERC
2009-2011 Standards Development Plan (Alberta) 05.13.09 About NERC
2009-2011 Standards Development Plan (British Columbia) 05.05.09 About NERC
2009-2011 Standards Development Plan (Manitoba) 05.05.09 About NERC
2009-2011 Standards Development Plan (National Energy Board) 05.05.09 About NERC
2009-2011 Standards Development Plan (New Brunswick) 05.05.09 About NERC
2009-2011 Standards Development Plan (Ontario) 05.05.09 About NERC
2009-2011 Standards Development Plan (Quebec) 05.05.09 About NERC
2009-2011 Standards Development Plan (Saskatchewan) 05.05.09 About NERC
2009-CAG-001 Process Bulletin - Regional Self-Certifications 05.26.10 Compliance
2009-CAG-002 Process Bulletin - Compliance Audit Certification Letter 05.26.10 Compliance
2009-CAG-003 Process Bulletin - Regional Compliance Auditor Training Requirements 07.06.10 Compliance
2009-CAG-004 Process Bulletin - Extension of Self-Certification Deadlines 05.26.10 Compliance
2009/2010 Winter Assessment 11.24.09 Assessments & Trends
2010 Actively Monitored Reliability Standards 05.05.10 Compliance
2010 Audit Schedule 08.10.10 Compliance
2010 Implementation Plan 10.01.09 Compliance
2010 NERC Performance Goals and Objectives 03.01.10 About NERC
2010 Special Reliability Scenario Assessment: Potential Reliability Impacts of Swift Demand Growth After a Long-Term Recession 08.02.10 Assessments & Trends
2010 Summer Assessment 05.26.10 Assessments & Trends
2010-2012 Reliability Standards Development Plan - Volume I, II, III 05.24.10 Standards
2010-2012 Reliability Standards Development Plan Volume I, II, and III 10.22.09 Standards
2010-CAG-001 Process Directive - Regional Entity Compliance Audit Report Processing 05.26.10 Compliance
2010-CAG-001 Process Directive - Regional Entity Compliance Audit Report Processing (Templates Only) 05.26.10 Compliance
2011-2013 Reliability Standards Development Plan 08.17.10 Standards
2011-2013 Reliability Standards Development Plan 08.24.10 About NERC
3. Appendix A - Data Recipient Protection and Confidentiality Acknowledgment 05.05.10 Programs
3. Appendix R1 - Researcher Confidentiality and Data Protection Statement 05.05.10 Programs
3. Redlined Text of Proposed Changes to Appendix 4A 03.16.10 About NERC
4. Contact Information Form 05.05.10 Programs
4. Contact Information Form 05.05.10 Programs
4. Redlined Text of Proposed Changes to Appendix 4B 03.16.10 About NERC
5. Redlined Text of Proposed Changes to Appendix 4C 03.16.10 About NERC
706B Implementation Plan Purpose 03.08.10 Compliance
About NERC & Reliability Standards 07.01.08 About NERC
About the Compliance & Enforcement Program 06.02.08 Compliance
Active Standards Work Plan Cross Reference - Sorted by Project Number 08.17.10 Standards
Active Standards Work Plan Cross Reference - Sorted by Standard 08.17.10 Standards
Additional Compliance Filing in Response to October 18, 2007 Order 04.01.09 About NERC
Additional Compliance Filing of the NERC in Response to October 18, 2007 Order 04.01.08 About NERC
Adequate Level of Reliability 03.18.10 Standards
Administrative Assistant to Chief Security Officer (CSO) 07.23.10 About NERC
Agenda for Workshop on Delegation Agreements 10.26.09 About NERC
Aggregated Actual and Forecast Demands and Net Energy for Load 11.24.08 Compliance
Aggregated Actual and Forecast Demands and Net Energy for Load 10.29.08 Standards
Agreement between NERC, NPCC and Regie de l'energie 05.08.09 About NERC
Amended and Restated Delegation Agreement between NERC and Texas Reliability Entity, Inc. - Effective July 1, 2010 06.03.10 About NERC
Amendment to Application for Recognition of Reliability Standards (Alberta) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (British Columbia) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (Manitoba) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (NEB) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (New Brunswick) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (Nova Scotia) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (Ontario) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (Quebec) 04.18.07 About NERC
Amendment to Application for Recognition of Reliability Standards (Saskatchewan) 04.18.07 About NERC
Amendment to March 3, 2008 Compliance Filing to Include Complete Copy of Exhibit A 03.04.08 About NERC
Analysis and Documentation of Underfrequency Load Shedding 01.13.10 Compliance
Analysis and Documentation of Underfrequency Load Shedding Performance Following an Underfrequency Event 02.02.05 Standards
Analysis and Mitigation of Transmission and Generation Protection System Misoperations 02.07.06 Standards
Analysis and Mitigation of Transmission and Generation Protection System Misoperations 11.02.09 Compliance
Analysis and Mitigation of Transmission and Generation Protection System Misoperations 08.05.10 Standards
Analysis and Repair of Power Line Carriers 04.14.10 About NERC
Annex 1 to the NERC Confidentiality Agreement for Electric System Operating Reliability Data -- Version 3 05.06.09 About NERC
Annex 2 to the NERC Confidentiality Agreement for Electric System Operating Reliability Data -- Version 3 05.06.09 About NERC
Announcement: Comment Period Open for Development Plan 2010-2012 08.28.09 Standards
Answer and Answer of NERC to Comments on Compliance Filing in Response to December 19, 2008 Order 03.18.09 About NERC
Answer to U.S. Department of Energy's Motion for Stay 10.22.09 About NERC
APPA Comments 05.29.09 About NERC
Appendix A - Change in Unit Status Report Form 12.02.09 Assessments & Trends
Appendix B1 - Component Cause Codes - Fossil Steam 12.02.09 Assessments & Trends
Appendix B2 - Component Cause Codes - Fluidized Bed 12.02.09 Assessments & Trends
Appendix B3 - Component Cause Codes - Nuclear 12.02.09 Assessments & Trends
Appendix B4 - Component Cause Codes - Diesel 12.02.09 Assessments & Trends
Appendix B5 - Component Cause Codes - Hydro/Pumped Storage 12.02.09 Assessments & Trends
Appendix B6 - Component Cause Codes - Gas Turbine 12.02.09 Assessments & Trends
Appendix B7 - Component Cause Codes - Jet Engine 12.02.09 Assessments & Trends
Appendix B8 - Component Cause Codes - Combined Cycle or Co-Generation Blocks 12.02.09 Assessments & Trends
Appendix B9 - Component Cause Codes - Geothermal 12.02.09 Assessments & Trends
Appendix C - Utility and Unit Identification Codes 12.02.09 Assessments & Trends
Appendix D - List of Major Components 12.02.09 Assessments & Trends
Appendix E - Unit Design Data - Introduction 12.02.09 Assessments & Trends
Appendix E1 - Unit Design Data - Fossil Steam 12.02.09 Assessments & Trends
Appendix E2 - Unit Design Data - Fluidized Bed Combustion 12.02.09 Assessments & Trends
Appendix E3 - Unit Design Data - Nuclear 12.02.09 Assessments & Trends
Appendix E4 - Unit Design Data - Diesel 12.02.09 Assessments & Trends
Appendix E5 - Unit Design Data - Hydro/Pumped Storage 12.02.09 Assessments & Trends
Appendix E6 - Unit Design Data - Gas Turbine or Jet Engine 12.02.09 Assessments & Trends
Appendix E7 - Unit Design Data - Combined Cycle or Co-Generation Blocks 12.02.09 Assessments & Trends
Appendix E8 - Unit Design Data - Miscellaneous 12.02.09 Assessments & Trends
Appendix F - Performance Indices and Equations 12.02.09 Assessments & Trends
Appendix G - Examples and Recommended Methods 12.02.09 Assessments & Trends
Appendix H - GADS Failure Mechanism Codes 12.02.09 Assessments & Trends
Appendix I - GADS Data Release Guidelines 12.02.09 Assessments & Trends
Appendix J - Cause Code Amplification Codes 12.02.09 Assessments & Trends
Appendix K - Outside Plant Management Control 12.02.09 Assessments & Trends
Appendix L1 - Calculating Combined Cycle and Co-generation Block Data 12.02.09 Assessments & Trends
Appendix L2 - Calculating Combined Cycle and Co-generation Block Data 12.02.09 Assessments & Trends
Appendix M - Differences Between GADS and ISO Data Collection System 12.02.09 Assessments & Trends
Applicability of Federal Power Act Section 215 05.18.07 About NERC
Application for Approval of Reliability Standards of the North American Electric Reliability Corporation (Nova Scotia) 06.30.10 About NERC
Application for Recognition as the ERO (Alberta) 04.04.06 About NERC
Application for Recognition as the ERO (NEB) 04.04.06 About NERC
Application for Recognition as the ERO (Nova Scotia) 04.04.06 About NERC
Application for Recognition as the ERO (Ontario) 04.04.06 About NERC
Application for Recognition of Proposed Reliability Standards (Alberta) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (British Columbia) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (Manitoba) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (NEB) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (New Brunswick) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (Nova Scotia) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (Ontario) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (Quebec) 09.11.06 About NERC
Application for Recognition of Proposed Reliability Standards (Saskatchewan) 09.11.06 About NERC
Application for Recognition of Reliability Standards (Alberta) 04.04.06 About NERC
Application for Recognition of Reliability Standards (NEB) 04.04.06 About NERC
Application for Recognition of Reliability Standards (Nova Scotia) 04.04.06 About NERC
Application for Recognition of Reliability Standards (Ontario) 04.04.06 About NERC
Application to Become an Approved CE Provider 12.24.09 Programs
Approval of Amendments to the NERC Bylaws (Alberta) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (British Columbia) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (Manitoba) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (National Energy Board) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (New Brunswick) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (Nova Scotia) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (Ontario) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (Quebec) 08.19.08 About NERC
Approval of Amendments to the NERC Bylaws (Saskatchewan) 08.19.08 About NERC
Approval of an Amendment to the 2008 Business Plan and Budget of the WECC 02.15.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Alberta) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (British Columbia) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Manitoba) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (NB) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (NEB) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Nova Scotia) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Ontario) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Quebec) 08.04.08 About NERC
Approval of Errata Petition of IRO-005-2 andTOP-004-2 (Saskatchewan) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Alberta) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (British Columbia) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Manitoba) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (NB) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (NEB) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Nova Scotia) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Ontario) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Quebec) 08.04.08 About NERC
Approval of Formal Interpretations of BAL-003-0 and VAR-001-1 (Saskatchewan) 08.04.08 About NERC
Approval of Petition for Proposed Regional Standard BAL-004-WECC-01 (Alberta) 08.04.08 About NERC
Approval of Petition for Proposed Regional Standard BAL-004-WECC-01 (British Columbia) 08.04.08 About NERC
Approval of Petition for Proposed Regional Standard BAL-004-WECC-01 (NEB) 08.04.08 About NERC
Approval of Petition for Proposed Reliability Standard PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Reliability Standard PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Reliability Standards PER-005-1 and PER-004-2 11.02.09 About NERC
Approval of Petition for Proposed Standard BAL-002-WECC-1 (Alberta) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-002-WECC-1 (British Columbia) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-002-WECC-1 (National Energy Board) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (Alberta) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (British Columbia) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (Manitoba) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (National Energy Board) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (New Brunswick) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (Ontario) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (Quebec) 04.07.09 About NERC
Approval of Petition for Proposed Standard BAL-004-1 (Saskatchewan) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (Alberta) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (British Columbia) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (Manitoba) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (National Energy Board) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (New Brunswick) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (Ontario) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (Quebec) 04.07.09 About NERC
Approval of Petition for Proposed Standard IRO-006-4 (Saskatchewan) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (Alberta) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (British Columbia) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (Manitoba) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (National Energy Board) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (New Brunswick) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (Ontario) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (Quebec) 04.07.09 About NERC
Approval of Petition for Proposed Standard MOD-004-1 (Saskatchewan) 04.07.09 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (Alberta) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (British Columbia) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (Manitoba) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (NB) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (NEB) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (Nova Scotia) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (Ontario) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (Quebec) 08.04.08 About NERC
Approval of Petition for Proposed Standard PRC-023-1 (Saskatchewan) 08.04.08 About NERC
Approval of Petition for Proposed Standard TOP-007-WECC-1 (Alberta) 04.07.09 About NERC
Approval of Petition for Proposed Standard TOP-007-WECC-1 (British Columbia) 04.07.09 About NERC
Approval of Petition for Proposed Standard TOP-007-WECC-1 (National Energy Board) 04.07.09 About NERC
Approval of Petition for Proposed Standard WECC Tier Standards (Alberta) 04.07.09 About NERC
Approval of Petition for Proposed Standard WECC Tier Standards (British Columbia) 04.07.09 About NERC
Approval of Petition for Proposed Standard WECC Tier Standards (National Energy Board) 04.07.09 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Alberta) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (British Columbia) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Manitoba) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (NEB) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (New Brunswick) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Nova Scotia) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Ontario) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Quebec) 11.27.07 About NERC
Approval of Proposed Standard Regarding Nuclear Plant Interface Coordination (Saskatchewan) 11.27.07 About NERC
Approved CE Provider Renewal Application 07.06.07 Programs
Approved Errata Procedure 01.15.10 Standards
April 14, 2009 Meeting Agenda Package 04.13.09 Standards
April 23-24, 2007 in San Diego, CA 08.20.07 Standards
April 27, 2009 Meeting Agenda Package 04.27.09 Standards
April 29-30, 2008 in San Diego, CA 05.16.08 Standards
April 6-7, 2005 in Atlanta, Georgia 04.11.05 Standards
Area Interchange Methodology 08.26.08 Standards
Assessment of the 1999 NERC "Pilot" Compliance Program 11.17.99 Compliance
Assessment of the Design and Effectiveness of UVLS Program 11.02.09 Compliance
Assuring Consistency of Entity Underfrequency Load Shedding Programs 02.02.05 Standards
Assuring Consistency of Entity Underfrequency Load Shedding Programs with Regional Reliability Organ 01.13.10 Compliance
ATC Comments 05.29.09 About NERC
Audit Report - Alabama Electric Cooperative, Inc. (11/29/07) 11.29.07 Compliance
Audit Report - Montana - Dakota Utilities (08/11/09 - 08/12/09) 09.02.10 Compliance
Audit Report - Power and Water Resources Pooling Authority (03/03/09) 07.16.09 Compliance
Audit Guide for Providers 11.10.08 Programs
Audit of Regional Entity Compliance Programs 01.18.07 About NERC
Audit Report - Arthur Kill Power LLC (03/14/08 - 03/25/08) 03.14.08 Compliance
Audit Report - Calpine Energy Services (08/24/09 - 09/15/09) 12.22.09 Compliance
Audit Report - City of Roseville (03/17/08 - 03/18/08) 06.29.10 Compliance
Audit Report - Del Ranch, LP (06/23/08) 11.21.08 Compliance
Audit Report - ACE Cogeneration Company (04/08/10) 06.14.10 Compliance
Audit Report - Adams Rural Electric Cooperative, Inc. (04/02/08 - 04/08/08) 02.19.09 Compliance
Audit Report - AES Huntington Beach LLC (07/30/08) 03.29.10 Compliance
Audit Report - AES Redondo Beach LLC (06/04/08) 05.17.10 Compliance
Audit Report - AES Thames LLC (03/18/08 - 04/04/08) 03.18.08 Compliance
Audit Report - Air Liquide Large Industires US LP (09/24/08 - 09/25/08) 12.04.08 Compliance
Audit Report - Alabama Municipal Electric Authority (11/13/07) 11.13.07 Compliance
Audit Report - Alcoa Power Generating, Inc - Yadkin Division (09/08/08 - 09/10/08) 05.05.10 Compliance
Audit Report - Alcoa Power Generating, Inc. - Tapoco Division (09/08/08 - 09/10/08) 05.05.10 Compliance
Audit Report - Alcoa Power Marketing, LLC (04/07/10) 07.01.10 Compliance
Audit Report - Allegheny Electric Cooperative, Inc. (04/05/10 - 04/16/10) 06.28.10 Compliance
Audit Report - Alliant Energy (12/12/07 - 12/13/07) 12.12.07 Compliance
Audit Report - Altura Cogen, LLC (08/13/08 - 08/14/08) 11.04.08 Compliance
Audit Report - Ameren - Illinois, Ameren - Missouri and Ameren Services Company 12.18.08 Compliance
Audit Report - AmerGen Energy Company, LLC (08/18/08 - 08/20/08) 12.16.08 Compliance
Audit Report - American Bituminous Power Partners, LP (03/16/09 - 03/24/09) 05.05.09 Compliance
Audit Report - American Electric Power Energy Partners (03/16/10 - 03/18/10) 05.11.10 Compliance
Audit Report - American Electric Power Service Corp. (03/16/10 - 03/18/10) 05.11.10 Compliance
Audit Report - American Electric Power Service Corp. (06/19/07 -06/20/07) 06.19.07 Compliance
Audit Report - American Electric Power Service Corp. (09/22/09 - 09/24/09) 12.22.09 Compliance
Audit Report - American PowerNet Management LP (06/14/10 - 06/15/10) 07.21.10 Compliance
Audit Report - American Transmission Company (12/03/07 - 12/05/07) 12.03.07 Compliance
Audit Report - ANP Bellingham Energy Company, LLC (02/28/08 - 03/24/08) 02.28.08 Compliance
Audit Report - ANP Blackstone Energy Company (02/22/08 - 02/29/08) 02.22.08 Compliance
Audit Report - ANP Funding, 1 LLC (02/22/08 - 03/05/08) 02.22.08 Compliance
Audit Report - ANP Funding, LLC (05/05/09 - 05/07/09) 07.28.09 Compliance
Audit Report - APS Energy Services (03/18/08) 10.16.08 Compliance
Audit Report - ArcLight Energy Marketing, LLC (05/21/08) 11.14.08 Compliance
Audit Report - Arkansas Electric Cooperative Corporation (04/01/08 - 04/03/08) 04.01.08 Compliance
Audit Report - Associated Electric Cooperative Inc. (06/19/07) 03.17.10 Compliance
Audit Report - Associated Electric Cooperative, Inc. (09/22/08 - 09/25/08) 01.08.09 Compliance
Audit Report - Astoria Energy LLC (02/24/09 - 03/10/09) 10.02.09 Compliance
Audit Report - Astoria Gas Turbine (03/12/08 - 03/25/08) 03.12.08 Compliance
Audit Report - Astoria Generating Company, L.P. (03/17/08 - 03/20/08) 03.17.08 Compliance
Audit Report - Atlantic City Electric (05/20/08 - 05/22/08) 10.20.08 Compliance
Audit Report - Atlantic Municipal Utilities (07/20/09 - 07/31/09) 09.25.09 Compliance
Audit Report - Avista Corporation (07/09/07 - 07/11/07) 05.10.10 Compliance
Audit Report - Baconton Power LLC (09/25/07) 09.25.07 Compliance
Audit Report - Bandera Electric CO OP (08/20/08 - 08/21/08) 10.29.08 Compliance
Audit Report - Bangor Hydro Electric Company (12/09/08 - 12/22/08) 01.20.09 Compliance
Audit Report - Barclays Bank PLC (02/23/09 - 04/07/09) 10.02.09 Compliance
Audit Report - Barclays Bank, PLC (03/19/08) 10.16.08 Compliance
Audit Report - Basin Electric Power Cooperative (10/22/09 - 10/23/09) 06.14.10 Compliance
Audit Report - Bastrop Energy Partners (01/23/08) 01.23.08 Compliance
Audit Report - Bayswater Peaking Facility (09/03/08 - 10/16/08) 12.08.08 Compliance
Audit Report - Bear Swamp Power Company, LLC (04/07/08 - 04/30/08) 11.14.08 Compliance
Audit Report - Benton Rural Electric Association (11/03/09) 06.24.10 Compliance
Audit Report - Berkshire Power Company LLC (01/20/10 - 02/18/10) 04.06.10 Compliance
Audit Report - Bethpage Energy Center 3, LLC (04/17/08 - 04/22/08) 10.28.08 Compliance
Audit Report - BG Dighton Power LLC (04/21/08 - 05/09/08) 10.28.08 Compliance
Audit Report - Big Brown Power Company LLC (06/15/10 - 06/17/10) 08.18.10 Compliance
Audit Report - Big Rivers Electric Corporation (11/10/08 - 11/11/08) 03.10.09 Compliance
Audit Report - Black Hills Wyoming, Inc (06/17/09) 05.05.10 Compliance
Audit Report - Black Oak Energy, LLC (04/28/08 - 05/30/08) 10.28.08 Compliance
Audit Report - Black River Generation, LLC (05/09/08 - 05/22/08) 10.28.08 Compliance
Audit Report - Bluebonnet Electric Co Op Inc. (01/21/09 - 01/22/09) 04.10.09 Compliance
Audit Report - Boston Generating Company, LLC (05/10/08 - 05/14/08) 10.28.08 Compliance
Audit Report - Boylston Municipal Light Department (03/06/09 - 03/24/09) 10.02.09 Compliance
Audit Report - BP Energy Company (03/31/08) 10.20.08 Compliance
Audit Report - BP Energy Company (05/19/08 - 06/02/08) 10.28.08 Compliance
Audit Report - Braintree Electric Light Department (05/26/08 - 07/09/08) 10.28.08 Compliance
Audit Report - Brazos Electric Power Co Op, Inc. (02/27/10 - 02/28/10) 04.27.10 Compliance
Audit Report - Brazos Electric Power Coop. (9/13/07) 09.13.07 Compliance
Audit Report - Brick Power Holdings LLC (02/27/09 - 04/10/09) 10.14.09 Compliance
Audit Report - Brooklyn Navy Yard Cogeneration Partners LP (03/16/09 - 03/30/09) 10.02.09 Compliance
Audit Report - Brownsville Public Utility Board (01/28/09 - 01/29/09) 04.20.09 Compliance
Audit Report - Brownsville Public Utility Board AEP (02/02/10 - 02/04/10) 08.18.10 Compliance
Audit Report - Brownsville Publicd Utility Board (02/02/10 - 02/04/10) 04.28.10 Compliance
Audit Report - Bryan Municipal Utilities (05/04/09 - 05/07/09) 07.08.09 Compliance
Audit Report - Bryan Texas Utilities (06/25/08 - 06/26/08) 04.28.09 Compliance
Audit Report - BTU QSE Services Inc. (01/16/08) 04.27.10 Compliance
Audit Report - Bucksport Energy LLC (09/29/08 - 10/08/08) 12.08.08 Compliance
Audit Report - Burlington Electric Department (06/11/08 - 06/24/08) 10.28.08 Compliance
Audit Report - Cabrillo Power I, LLC (02/09/10) 04.29.10 Compliance
Audit Report - Cabrillo Power II, LLC (02/10/10) 06.24.10 Compliance
Audit Report - Caithness Long Island, LLC (02/03/10) 04.06.10 Compliance
Audit Report - CalPeak Power Panoche, LLC (03/05/09) 09.02.10 Compliance
Audit Report - Calpine Corporation (06/09/08) 06.04.10 Compliance
Audit Report - Calpine Corporation (08/24/09 - 09/15/09) 12.22.09 Compliance
Audit Report - Calpine Corporation (CC) (02/10/09 - 02/26/09) 05.10.09 Compliance
Audit Report - Calpine Energy Services (02/19/09 - 02/26/09) 05.05.09 Compliance
Audit Report - Calpine Energy Services (09/02/08 - 09/30/08) 11.13.08 Compliance
Audit Report - Calpine Energy Services and Calpine Corp. (06/09/08 - 06/12/08) 03.11.10 Compliance
Audit Report - Calpine Power Management (03/18/09 - 03/20/09) 06.08.09 Compliance
Audit Report - CAMS Mackinaw Power & Mackinaw Power LLC (05/14/08 - 05/15/08) 03.17.10 Compliance
Audit Report - Capital District Energy Center Cogeneration (06/26/08 - 07/09/08) 10.28.08 Compliance
Audit Report - Cargill Power Market, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Cargill Power Market, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Cargill Power Markets, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Cargill Power Markets, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Cargill Power Markets, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Cargill Power Markets, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Cargill Power Markets, LLC (03/05/09) 04.06.09 Compliance
Audit Report - Carthage Water & Electric Plant (04/15/10) 06.11.10 Compliance
Audit Report - Castleton Power, LLC (03/03/10 - 03/12/10) 04.06.10 Compliance
Audit Report - CenterPoint Energy Houston Electric LLC (07/08/09 - 07/09/09) 09.30.09 Compliance
Audit Report - Central Electric Coop/PNGC (03/12/08 - 03/13/08) 10.20.08 Compliance
Audit Report - Central Hudson Gas & Electric Corporation (07/07/08 - 08/07/08) 10.28.08 Compliance
Audit Report - Central Maine Power Co. (10/02/07) 10.02.07 Compliance
Audit Report - Central Maine Power Company (09/14/09 - 09/17/09) 01.12.10 Compliance
Audit Report - Central Minnesota Municipal Power Agency (08/26/08 - 08/27/08) 10.10.08 Compliance
Audit Report - Central Vermont Public Service (11/06/07 -11/07/07) 11.06.07 Compliance
Audit Report - Chicopee Municipal Lighting Plant (07/14/08 - 08/12/08) 10.28.08 Compliance
Audit Report - Citigroup (07/25/08 - 08/27/08) 10.28.08 Compliance
Audit Report - Citigroup Energy Inc. (04/02/08 - 04/04/08) 08.04.08 Compliance
Audit Report - Citigroup Energy, Inc. (03/03/09) 07.16.09 Compliance
Audit Report - Citizen's Electric Company of Lewisburg, PA (05/04/09 - 05/11/09) 05.29.09 Compliance
Audit Report - City of Abbeville (04/13/10) 06.11.10 Compliance
Audit Report - City of Alexandria, Louisiana (07/08/08 - 07/09/08) 01.08.09 Compliance
Audit Report - City of Ames Electric Services (02/01/10 - 02/04/10) 03.16.10 Compliance
Audit Report - City of Anaheim (03/11/08 - 03/12/08) 10.16.08 Compliance
Audit Report - City of Austin DBA Austin Energy (01/30/08) 01.30.08 Compliance
Audit Report - City of Banning (03/03/09) 07.16.09 Compliance
Audit Report - City of Burbank Q1 (03/10/08 - 03/12/08) 07.26.10 Compliance
Audit Report - City of Burbank Q2 (06/11/08) 07.26.10 Compliance
Audit Report - City of College Station (05/21/08 - 05/22/08) 08.21.08 Compliance
Audit Report - City of Columbia, Missouri (06/21/07) 03.17.10 Compliance
Audit Report - City of Columbus, Ohio, Dept of Public Utilities (10/14/08 - 10/17/08) 01.27.09 Compliance
Audit Report - City of Dalton d/b/a/ Dalton Utilities (05/13/08 - 5/14/08) 11.14.08 Compliance
Audit Report - City of Ellensburg (03/08/10) 04.29.10 Compliance
Audit Report - City of Fort Collins (03/18/08) 10.16.08 Compliance
Audit Report - City of Garland (04/06/10 - 04/08/10) 06.22.10 Compliance
Audit Report - City of Garland (07/06/07) 07.06.07 Compliance
Audit Report - City of Garland (QSE) (01/08/08) 01.08.08 Compliance
Audit Report - City of Georgetown (04/22/09 - 04/23/09) 07.16.09 Compliance
Audit Report - City of Healdsburg ((11/05/09) 05.11.10 Compliance
Audit Report - City of Idaho Falls (06/16/08) 04.08.10 Compliance
Audit Report - City of Idaho Falls Electric Light Divsion (03/11/08 - 03/12/08) 06.04.10 Compliance
Audit Report - City of Marshall, MI (04/02/08 - 04/04/08) 10.21.08 Compliance
Audit Report - City of Orrville, Ohio (09/03/08 - 09/09/08) 12.08.08 Compliance
Audit Report - City of Painesville (5/28/08 - 5/30/08) 09.15.08 Compliance
Audit Report - City of Palo Alto (09/30/08) 06.04.10 Compliance
Audit Report - City of Radford VA (04/02/08 - 04/04/08) 10.29.08 Compliance
Audit Report - City of Riverside Public Utilities (08/18/09 - 08/19/09) 05.17.10 Compliance
Audit Report - City of Roseville (06/17/08) 03.29.10 Compliance
Audit Report - City of San Antonio Public Service (03/05/08 - 03/06/08) 03.05.08 Compliance
Audit Report - City of Shasta Lake (03/09/10) 05.14.10 Compliance
Audit Report - City of Shelby (09/02/08 - 09/12/08) 03.04.09 Compliance
Audit Report - City of Springfield, IL (03/30/09 - 04/0/09) 08.29.09 Compliance
Audit Report - City of St. George (08/20/09 -08/21/09) 05.25.10 Compliance
Audit Report - City of St. Mary's (09/09/08 - 09/12/08) 10.21.08 Compliance
Audit Report - City of Westerville Electric Division (10/17/08 - 10/23/08) 01.27.09 Compliance
Audit Report - City Power Marketing, LLC (10/13/08 - 10/17/08) 01.19.09 Compliance
Audit Report - City Utilities of Springfield Missouri (05/13/08 - 05/15/08) 11.14.08 Compliance
Audit Report - City Water & Light of Jonesboro, Arkansas (06/24/08 - 06/31/08) 01.08.09 Compliance
Audit Report - Clearview Electric Inc (03/20/09 - 05/14/09) 10.14.09 Compliance
Audit Report - Clearwater Power Company (03/11/09) 04.28.10 Compliance
Audit Report - CMEEC Bozrah Light and Power Company (08/13/08 - 09/02/08) 10.28.08 Compliance
Audit Report - CMEEC Groton Utilities (08/18/08 - 09/02/08) 10.28.08 Compliance
Audit Report - Cogen Technologies Linden Venture, L.P. (09/23/08 - 10/02/08) 11.14.08 Compliance
Audit Report - Coleto Creek Power LP (02/12/08 -02/14/08) 02.12.08 Compliance
Audit Report - Colorado Energy Management - BCM (03/13/09) 05.17.10 Compliance
Audit Report - Colorado Energy Management - BIV (03/15/09) 05.14.09 Compliance
Audit Report - Colorado Energy Management - CPP (03/13/09) 05.17.10 Compliance
Audit Report - Colorado Energy Management - RMP (03/26/09) 05.14.09 Compliance
Audit Report - Colorado Energy Management - SJC (03/25/09) 05.05.09 Compliance
Audit Report - Colorado Green Holdings, LLC (04/20/10) 07.30.10 Compliance
Audit Report - Columbia River People's Utility District (03/12/09) 05.17.10 Compliance
Audit Report - Connecticut Jet Power (09/29/08 - 10/25/08) 12.30.08 Compliance
Audit Report - Connecticut Light & Power Co. (12/03/08 - 12/11/08) 01.20.09 Compliance
Audit Report - Connecticut Municipal Electric Energy (08/05/08 - 09/03/08) 10.28.08 Compliance
Audit Report - Connecticut Resources Recovery Authority (09/23/08 - 10/30/08) 12.30.08 Compliance
Audit Report - Consolidated Edison Co. of New York, Inc. (08/21/07) 08.21.07 Compliance
Audit Report - Consolidated Edison Energy Inc. (04/03/09 - 04/14/09) 10.02.09 Compliance
Audit Report - Consolidated Edison of NY (03/30/09 - 04/06/09) 10.02.09 Compliance
Audit Report - Consolidated Edison Solutions Inc (04/03/09 - 04/14/09) 10.14.09 Compliance
Audit Report - Consolidated Electric Cooperative Inc. (04/05/10 - 04/16/10) 06.09.10 Compliance
Audit Report - Constellation Energy Commodities (03/31/09 - 04/02/09) 06.23.09 Compliance
Audit Report - Constellation Energy Commodities Group (12/1/08 - 12/05/08) 01.21.09 Compliance
Audit Report - Constellation Energy Commodities Group Maine, LLC (11/24/08 - 12/17/08) 01.20.09 Compliance
Audit Report - Constellation Energy Commodities Group, Inc. (04/06/10 - 04/16/10) 06.28.10 Compliance
Audit Report - Constellation New Energy, Inc. (04/06/10 - 04/16/10) 06.28.10 Compliance
Audit Report - Constellation NewEnergy, Inc. (12/03/08 - 12/12/08) 01.20.09 Compliance
Audit Report - Consumer's Power Inc. (06/16/09) 08.02.10 Compliance
Audit Report - Continental Divide Electric Cooperative (03/18/08) 10.16.08 Compliance
Audit Report - Corn Belt Power Cooperative (03/26/08 -03/27/08) 03.26.08 Compliance
Audit Report - Coso Energy Developers (03/04/09) 07.28.09 Compliance
Audit Report - Cottonwood Energy LP (10/30/07) 03.17.10 Compliance
Audit Report - Covanta Delaware (04/07/20 - 04/23/10) 07.21.10 Compliance
Audit Report - Covanta Essex (04/07/10 - 04/23/10) 07.21.10 Compliance
Audit Report - Covanta Mid-Conn, Inc. (03/27/09 - 05/27/09) 07.17.09 Compliance
Audit Report - Covanta Niagra, LP (03/30/09 - 05/27/09) 07.17.09 Compliance
Audit Report - Covanta Onondaga, LP (04/06/09 - 05/27/09) 07.17.09 Compliance
Audit Report - Covanta SEMASS, LLC (04/08/09 - 05/27/09) 07.17.09 Compliance
Audit Report - CPS Energy (05/19/09 - 05/21/09) 08.12.09 Compliance
Audit Report - Craven County Wood Energy, LP (11/06/07) 03.17.10 Compliance
Audit Report - Crockett Cogeneration (06/18/08) 05.20.10 Compliance
Audit Report - Crockett Cogeneration, a California Limited Partnership (08/18/09) 05.17.10 Compliance
Audit Report - Cross Sound Cable Company LLC (04/27/09 - 05/08/09) 10.14.09 Compliance
Audit Report - DAI Oildale Inc. (03/27/09) 04.08.10 Compliance
Audit Report - Dairyland Power Cooperative (01/30/08 - 01/31/08) 03.08.10 Compliance
Audit Report - Danvers Electric Division (05/11/09 - 05/15/09) 10.14.09 Compliance
Audit Report - DB Energy Trading, LLC (08/25/09 - 08/28/09) 10.14.09 Compliance
Audit Report - DC Energy, LLC (10/21/08) 12.01.08 Compliance
Audit Report - Delmarva Power & Light Company (05/20/08 - 05/22/08) 10.20.08 Compliance
Audit Report - Denton Municipal Electric (07/10/07) 04.27.10 Compliance
Audit Report - Denver City Energy Associates, LP (08/24/09 - 08/25/09) 11.29.09 Compliance
Audit Report - Desert Sky Wind Farm, LP (05/04/10 - 05/06/10) 07.30.10 Compliance
Audit Report - Detroit Lakes Public Utilities (03/01/10 - 03/05/10) 04.22.10 Compliance
Audit Report - Devon Power LLC (05/25/09 - 06/11/09) 07.20.09 Compliance
Audit Report - Direct Energy Business LLC (08/24/09 - 09/04/09) 12.22.09 Compliance
Audit Report - Direct Energy LP (04/29/08 - 04/30/08) 02.04.09 Compliance
Audit Report - Direct Energy Marketing Inc. (06/01/09 - 06/19/09) 01.13.10 Compliance
Audit Report - Dixie Escalante Rural Electric Association, Inc. (02/25/10) 06.24.10 Compliance
Audit Report - Dominion Energy Brayton Point, LLC (10/24/08 - 11/21/08) 12.30.08 Compliance
Audit Report - Dominion Energy Kewaunee, Inc. (05/10/10 - 05/26/10) 07.30.10 Compliance
Audit Report - Dominion Energy Manchester Street Inc. (10/24/08 - 11/21/08) 12.30.08 Compliance
Audit Report - Dominion Energy Marketing Inc. (10/24/08 - 11/10/08) 02.04.09 Compliance
Audit Report - Dominion Energy New England, Inc. (10/24/08 - 11/21/08) 12.30.08 Compliance
Audit Report - Dominion Energy Salem Harbor, LLC (10/24/08 - 11/21/08) 12.30.08 Compliance
Audit Report - Dominion Nuclear Connecticut, Inc. (10/24/08 - 11/21/08) 12.30.08 Compliance
Audit Report - Dominion Retail Inc. (10/24/08 - 11/10/08) 02.04.09 Compliance
Audit Report - Dominion Virginia Power (08/21/07 - 08/22/07) 08.21.07 Compliance
Audit Report - Dow Pipeline Company (07/12/10 - 07/13/10) 08.17.10 Compliance
Audit Report - Doyle 1, LLC (09/27/07) 03.17.10 Compliance
Audit Report - DPS Gregory, LLC (05/25/10 - 05/27/10) 07.30.10 Compliance
Audit Report - DTE Energy Trading (04/01/08 - 04/02/08) 08.12.08 Compliance
Audit Report - DTE Energy Trading, Inc. (06/05/09 - 06/15/09) 09.25.09 Compliance
Audit Report - DTE Pontiac North, LLC (05/04/09 - 05/15/09) 07.20.09 Compliance
Audit Report - Duke Energy Carolinas (04/21/08 - 04/24/08) 11.17.08 Compliance
Audit Report - Duke Energy Corportation 01.28.10 Compliance
Audit Report - Duke Energy Generation Services (09/28/09 - 09/28/09) 03.11.10 Compliance
Audit Report - Dunkirk Power (05/25/09 - 06/11/09) 07.20.09 Compliance
Audit Report - Duquesne Light Energy (06/03/08 -06/13/08) 08.14.08 Compliance
Audit Report - Duquesne Power LLC (05/28/08 - 06/04/08) 08.14.08 Compliance
Audit Report - Dynegy Inc (06/08/09 - 07/10/09) 01.13.10 Compliance
Audit Report - Dynegy Inc. (06/16/10) 08.18.10 Compliance
Audit Report - Dynegy Power Marketing (06/23/09 - 07/07/09) 01.13.10 Compliance
Audit Report - Dynegy Power Marketing (10/15/08 - 10/17/08) 01.19.09 Compliance
Audit Report - E. ON U.S. Services, Inc. for LG&E & KU Companies (02/23/09 - 02/26/09) 09.08.09 Compliance
Audit Report - E.I. du Pont Nemours and Company (08/04/09 - 08/05/09) 12.11.09 Compliance
Audit Report - Eagle Energy Partners I, L.P. (05/28/08 - 06/04/08) 09.25.08 Compliance
Audit Report - Eagle Energy Partners I, LP (08/16/07) 08.16.07 Compliance
Audit Report - East Coast Power Linden Holding, LLC ((11/09/09 - 11/17/09) 03.10.10 Compliance
Audit Report - East Kentucky Power Cooperative (03/23/09 - 03/25/09) 09.08.09 Compliance
Audit Report - EDF Trading North America, LLC (02/09/10 - 02/11/10) 05.11.10 Compliance
Audit Report - Edgecombe Genco, LLC/Edgecombe Operating Services (06/08/09 - 06/10/09) 08.21.09 Compliance
Audit Report - Edison Marketing & Trading, Inc. (08/13/08 - 08/14/08) 01.28.09 Compliance
Audit Report - Edison Mission Marketing & Trading Inc (10/15/09 - 10/24/09) 01.13.10 Compliance
Audit Report - Edison Mission Marketing and Trading, LLC (05/27/08 - 05/30/08) 09.15.08 Compliance
Audit Report - Edison Sault Electric Company (10/13/08 - 10/23/08) 01.27.09 Compliance
Audit Report - EFS Parlin Holdings LLC (11/09/09 - 11/12/09) 12.22.09 Compliance
Audit Report - El Paso Electric Company (02/02/09 - 02/06/09) 06.04.10 Compliance
Audit Report - Electric Energy, Inc. (10/20/08 - 10/22/08) 03.11.10 Compliance
Audit Report - Electric Transmission Texas LLC (09/222/09 - 09/24/09) 12.22.09 Compliance
Audit Report - Elizabethtown & Lumberton (11/08/07 - 11/09/07) 03.19.10 Compliance
Audit Report - Elk Hills Power (06/24/08) 07.26.10 Compliance
Audit Report - Entergy Nuclear James Fitzpatrick (09/10/07) 03.24.10 Compliance
Audit Report - Entergy Power Ventures, LP (08/12/08 - 08/14/08) 01.20.09 Compliance
Audit Report - Eugene Water & Electric Board (10/20/09 - 10/22/09) 06.14.10 Compliance
Audit Report - Exelon Generating Company, LLC (07/15/09 - 08/05/09) 01.13.10 Compliance
Audit Report - Exeter Energy LP (07/24/09 - 08/18/09) 01.13.10 Compliance
Audit Report - ExxonMobil Oil Corporation - Beaumont (07/22/09 - 07/23/09) 12.11.09 Compliance
Audit Report - Farmington Electric Utility System (02/11/08 - 02/15/08) 07.26.10 Compliance
Audit Report - FirstLight Hydro Generating Company ( 07/29/09 - 08/17/09) 01.14.10 Compliance
Audit Report - FirstLight Power Resources Management (07/31/09 -08/11/09) 01.13.10 Compliance
Audit Report - Fitchburg Gas & Electric Light Company (08/10/09 - 08/25/09) 01.13.10 Compliance
Audit Report - Flat Rock Windpower LLC (09/09/09 - 09/29/09) 01.14.10 Compliance
Audit Report - Flathead Electric Cooperative, Inc. (02/23/10) 04.09.10 Compliance
Audit Report - Florida Municipal Power Pool (02/16/09 - 02/20/09) 04.10.09 Compliance
Audit Report - Florida Power & Light Company (02/15/10 - 02/19/10) 05.05.10 Compliance
Audit Report - Florida Power and Light - New England Division (08/17/09 - 09/09/09) 01.14.10 Compliance
Audit Report - Fore River Development LLC (08/10/09 - 08/24/09) 01.14.10 Compliance
Audit Report - Formosa Utility Venture, LTD (05/14/08 - 05/15/08) 08.13.08 Compliance
Audit Report - Fortis Energy Marketing & Trading GP (02/10/09) 09.25.09 Compliance
Audit Report - Fortis Energy Marketing & Trading GP (02/10/09) 04.17.09 Compliance
Audit Report - Fortistar North Tonawanda (08/18/09 - 08/27/09) 01.14.10 Compliance
Audit Report - Fountain Valley Power (08/11/08) 05.10.10 Compliance
Audit Report - FPL Energy (02/11/08 - 02/13/08) 03.19.10 Compliance
Audit Report - FPL Energy Duane Arnold, LLC (08/05/08 - 08/15/08) 10.10.08 Compliance
Audit Report - FPL Energy Seabrook, LLC (10/02/07) 10.02.07 Compliance
Audit Report - Front Range Power Company, LLC (04/21/10) 06.24.10 Compliance
Audit Report - Frontera Generation Limited Partnership (10/15/08 - 10/16/08) 12.08.08 Compliance
Audit Report - Fulcrum Power Services, LP (02/18/09 - 02/19/09) 05.20.09 Compliance
Audit Report - GEN~SYS Energy (02/08/10 - 02/10/10) 03.16.10 Compliance
Audit Report - Georgia System Operations Corporation (06/16/08 - 06/18/08) 12.16.08 Compliance
Audit Report - Georgia Transmission Corporation (06/18/08 - 06/19/08) 12.16.08 Compliance
Audit Report - GEUS (04/13/10 - 04/15/10) 06.22.10 Compliance
Audit Report - GEUS (08/17/07) 08.17.07 Compliance
Audit Report - Golden Spread Electric Cooperative, Inc. (03/23/10 - 03/25/10) 06.11.10 Compliance
Audit Report - Golden Spread Electric Cooperative, Inc. (06/24/08 - 06/27/08) 01.20.09 Compliance
Audit Report - Grand River Dam Authority (04/08/08 - 04/10/08) 03.12.09 Compliance
Audit Report - Grant Energy Inc. (08/25/09) 11.17.09 Compliance
Audit Report - Grays Harbor PUD (06/19/09) 09.02.10 Compliance
Audit Report - Great Lakes Energy LLC (02/11/09) 04.06.10 Compliance
Audit Report - Green Mountain Power Corporation (08/24/09 - 09/09/09) 01.14.10 Compliance
Audit Report - Gregory Power Partners, LP (05/25/10 - 05/27/10) 07.30.10 Compliance
Audit Report - Guadalupe Power Partners, LP (08/28/08 - 08/29/08) 11.11.08 Compliance
Audit Report - Guadalupe Valley Electric Cooperative, Inc. (04/16/08 -04/17/08) 04.16.08 Compliance
Audit Report - Guernsey Muskingum EC (08/24/09 - 09/04/09) 12.22.09 Compliance
Audit Report - Gulf Power Company (09/14/09 - 09/15/09) 01.25.10 Compliance
Audit Report - GWF Energy LLC (03/27/09) 04.08.10 Compliance
Audit Report - GWF Power Systems, LP (02/09/10) 04.29.10 Compliance
Audit Report - Hancock-Wood Electric Cooperative, Inc (08/24/09 - 08/28/09) 09.30.09 Compliance
Audit Report - Handsome Lake Energy, LLC (04/05/10 - 04/16/10) 06.28.10 Compliance
Audit Report - Harney Electric Cooperative, Inc. (03/10/10) 05.07.10 Compliance
Audit Report - Hartwell Energy Limited Partnership (08/11/08 - 08/12/08) 12.16.08 Compliance
Audit Report - Hastings Utilities (10/21/08 - 10/30/08) 12.17.08 Compliance
Audit Report - Hays Energy LP (02/12/08 - 02/14/08) 02.12.08 Compliance
Audit Report - Henderson Municipal Power & Light (11/12/08 - 11/13/08) 04.23.10 Compliance
Audit Report - High Desert Power Project, LLC (04/14/09 - 04/16/09) 04.08.10 Compliance
Audit Report - High Plains Power, Inc. (03/31/08) 10.27.08 Compliance
Audit Report - High Trail Wind Farm, LLC (04/05/10 -04/16/10) 07.21.10 Compliance
Audit Report - Hingham Municipal Lighting Plant (09/05/09 - 09/21/09) 01.14.10 Compliance
Audit Report - Holland Energy, LLC (08/31/09 - 09/02/09) 01.25.10 Compliance
Audit Report - HQ Energy Services US Inc (08/28/09 - 09/21/09) 01.14.10 Compliance
Audit Report - HQ Energy Services US Inc. (08/28/09 - 09/21/09) 10.27.09 Compliance
Audit Report - Hudson Light and Power Department (07/13/09 - 07/28/09) 01.14.10 Compliance
Audit Report - Huntley Power LLC (11/02/09 - 11/16/09) 01.14.10 Compliance
Audit Report - Iberdrola Renewables (07/16/08) 08.24.10 Compliance
Audit Report - Iberdrola Renewables (07/30/08 - 07/31/08) 01.20.09 Compliance
Audit Report - Iberdrola Renewables (08/25/08 - 08/29/08) 10.02.08 Compliance
Audit Report - Ingleside Cogeneration LP (08/13/09) 11.18.09 Compliance
Audit Report - Inland Power & Light Company (03/10/10) 05.12.10 Compliance
Audit Report - Integrys Energy Services Inc. (07/13/09 - 07/27/09) 01.14.10 Compliance
Audit Report - Integrys Energy Services of New York (07/07/09 - 07/21/09) 01.15.10 Compliance
Audit Report - Integrys Energy Services, Inc. (03/27/08) 10.16.08 Compliance
Audit Report - IPA Operations Inc. (11/18/09 - 12/14/09) 01.14.10 Compliance
Audit Report - IPA Trading, LLC (05/05/09 - 05/07/09) 07.28.09 Compliance
Audit Report - ISO New England Inc. (04/20/09 - 04/24/09) 10.14.09 Compliance
Audit Report - ITC Transmission (09/16/08 - 09/18/08) 02.05.09 Compliance
Audit Report - J. Aron & Company (11/3/09 - 11/05/09) Multi-Regional 12.22.09 Compliance
Audit Report - J.P. Morgan Ventures Energy Corporation (02/10/09) 05.17.10 Compliance
Audit Report - James River Cogeneration Company (12/04/07) 12.04.07 Compliance
Audit Report - JEA (08/04/08 - 09/17/08) 02.18.09 Compliance
Audit Report - Jersey Central Power & Light (10/28/08 - 10/29/08) 05.05.10 Compliance
Audit Report - Judith Gap (08/12/08) 09.02.10 Compliance
Audit Report - K.C. Electric Association, Inc. (03/04/09) 08.02.10 Compliance
Audit Report - Kansas Electric Power Cooperative (06/22/09 - 06/24/09) 09.25.09 Compliance
Audit Report - Kaysville City Corporation (03/20/08) 10.16.08 Compliance
Audit Report - KES Kingsburg, LP (08/13/08) 11.21.08 Compliance
Audit Report - KeySpan-Ravenswood LLC (09/25/07) 09.25.07 Compliance
Audit Report - Keystone Urban Renewal, L.P. (09/02/08 - 09/12/08) 03.04.08 Compliance
Audit Report - KeyTex Energy, LLC (09/02/08 - 09/09/08) 12.08.08 Compliance
Audit Report - KIAC Partners (10/21/09 - 10/28/09) 01.14.10 Compliance
Audit Report - Kincaid Generation Company (05/27/08 - 05/30/08) 08.12.08 Compliance
Audit Report - Kiowa Power Partners (11/06/08 - 11/07/08) 02.04.09 Compliance
Audit Report - Kiowa Power Partners (11/06/08 - 11/07/08) 03.31.09 Compliance
Audit Report - Kirtland Air Force Base (03/04/09) 07.28.09 Compliance
Audit Report - Larkspur Energy, LLC (04/16/09) 04.28.10 Compliance
Audit Report - Las Vegas Power Company (07/07/08) 03.29.10 Compliance
Audit Report - Las Vegas Power Company, LLC (03/27/08) 10.20.08 Compliance
Audit Report - Leathers LP (10/21/09) 06.14.10 Compliance
Audit Report - Liberty Power Corporation/Liberty Power Maryland (10/23/08 - 10/28/08) 01.27.09 Compliance
Audit Report - Licking Rural Electrification (09/03/08 - 09/09/08) 12.08.08 Compliance
Audit Report - Lighthouse Energy Trading Co. Inc. (10/01/08) 11.02.08 Compliance
Audit Report - Lincoln County Power District No. 1 (03/12/08 - 03/13/08) 05.10.10 Compliance
Audit Report - Linde Energy Services, Inc. (03/19/09 - 03/23/09) 06.18.09 Compliance
Audit Report - Lockport Energy Associates LP (10/14/09 - 10/30/09) 01.15.10 Compliance
Audit Report - Logan County Electric Cooperative Power & Light Association, Inc. (10/13/08 - 10/21/08) 01.19.09 Compliance
Audit Report - Long Island Power Authority (10/30/09 - 11/17/09) 01.15.10 Compliance
Audit Report - Los Angeles Department of Water & Power (04/07/08 - 04/11/08) 09.02.10 Compliance
Audit Report - Louisiana Generating LLC (10/04/07) 10.04.07 Compliance
Audit Report - Lower Colorado River Authority (01/14/09 - 01/15/09) 04.06.09 Compliance
Audit Report - LSP Energy Limited Partnership (03/04/08 - 03/06/08) 10.21.08 Compliance
Audit Report - Macquarie Cook Power, Inc. (05/04/09 - 05/07/09) 06.29.09 Compliance
Audit Report - Madison Gas & Electric (07/25/07 - 07/26/07) 07.28.07 Compliance
Audit Report - Magnolia Energy, LP (05/19/09 - 05/21/09) 01.25.10 Compliance
Audit Report - Malacha Hydro Limited Partnership (06/12/09) 08.02.10 Compliance
Audit Report - Malacha Hydro Limited Partnership - GOP (06/12/09) 08.02.10 Compliance
Audit Report - Mansfield Municipal Electric Dept (09/28/09 - 10/06/09) 01.15.10 Compliance
Audit Report - Marblehead Municipal Light Dept (09/30/09 - 10/19/09) 01.15.10 Compliance
Audit Report - March Point Cogeneration Company (07/09/08) 11.21.08 Compliance
Audit Report - Marshall Municipal Untilities (01/06/09 - 01/16/09) 02.05.09 Compliance
Audit Report - Massachusetts Municipal Wholesale (10/02/09 - 10/28/09) 01.15.10 Compliance
Audit Report - Merrill Lynch Commodities Inc. (07/14/09) 11.17.09 Compliance
Audit Report - Metropolitan Edison Company (10/28/08 - 10/29/08) 03.17.09 Compliance
Audit Report - Michigan Electric Transmission Company, LLC (09/16/08 - 0918/08) 02.05.09 Compliance
Audit Report - Mid-Continent Area Power Pool ( 05/01/09 - 05/08/09) 07.16.09 Compliance
Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) 10.02.08 Compliance
Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) 10.02.08 Compliance
Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) 10.02.08 Compliance
Audit Report - MidAmerican Energy (08/11/08 - 08/20/08) 10.02.08 Compliance
Audit Report - Midlothian Energy (02/12/08 - 02/14/08) 02.12.08 Compliance
Audit Report - Midstate Electric Cooperative Inc. (03/12/09) 04.28.10 Compliance
Audit Report - Midwest Contingency Reserve Sharing Group (10/29/09 - 11/02/09) 12.22.09 Compliance
Audit Report - Midwest Contingency Reserve Sharing Group (11/29/09 - 11/02/09) 12.22.09 Compliance
Audit Report - Midwest Contingency Reserve Sharing Group (11/29/09 - 11/02/09) Multi-Regional 12.22.09 Compliance
Audit Report - Midwest Energy, Inc. (04/21/09 - 04/23/09) 07.08.09 Compliance
Audit Report - Midwest Independent Transmission System Op (11/03/09 - 11/10/09) 02.22.10 Compliance
Audit Report - Mirant Delta, LLC (04/23/09) 09.02.10 Compliance
Audit Report - Mississippi Power Company (09/16/09 - 09/17/09) 01.25.10 Compliance
Audit Report - Missoula Electric Cooperative, Inc. (02/24/10) 04.29.10 Compliance
Audit Report - Missouri River Energy Services (09/02/08 - 09/18/08) 11.02.08 Compliance
Audit Report - Modesto Irrigation District (04/21/08 - 04/25/08) 06.04.10 Compliance
Audit Report - Morgan County Rural Electric Association (10/02/08) 03.29.10 Compliance
Audit Report - Morgan Stanley Capital Group (03/19/08) 10.20.08 Compliance
Audit Report - Mountain Parks Electric, Inc. (03/04/09) 07.28.09 Compliance
Audit Report - Mountain View Electric Association (03/19/08) 10.20.08 Compliance
Audit Report - MSR Public Power Agency (02/11/09) 04.14.09 Compliance
Audit Report - Mt. Poso Cogeneration Co. (04/21/10) 05.19.10 Compliance
Audit Report - N.C. Electric Membership Corp. (05/19/08 - 05/20/08) 11.17.08 Compliance
Audit Report - NAES Corporation (08/24/09 - 08/25/09) 11.20.09 Compliance
Audit Report - NAES Corporation - Dogwood (07/22/09 - 07/24/09) 11.29.09 Compliance
Audit Report - NAES Corporation - Holland (08/31/09 - 09/02/09) 01.25.10 Compliance
Audit Report - Naniwa Energy LLC (10/20/09) 06.14.10 Compliance
Audit Report - Natchitoches Utilities System (07/30/08 - 07/31/08) 01.20.09 Compliance
Audit Report - NE Utilities Service Co, Connecticut Valley Electric Exchange (06/26/07 - 06/27/07) 06.26.07 Compliance
Audit Report - Nebraska Public Power District (11/14/07 - 11/15/07) 11.14.07 Compliance
Audit Report - Nevada Cogeneration Company #1 (07/14/08) 12.01.08 Compliance
Audit Report - Nevada Power Company (05/12/08 - 05/16/08) 06.04.10 Compliance
Audit Report - New Athens Generating Company LLC (08/24/09 - 09/14/09) 01.15.10 Compliance
Audit Report - New Braunfels Utilities (06/18/08 - 06/19/08) 08.21.08 Compliance
Audit Report - New Brunswick System Operator (10/14/08 - 10/17/08) 11.08.08 Compliance
Audit Report - New England Power Company (09/08/08 - 09/11/08) 11.14.08 Compliance
Audit Report - New York Independent System Operator (08/18/09 - 08/21/09) 01.15.10 Compliance
Audit Report - New York Independent System Operator (08/18/09 - 08/21/09) 10.27.09 Compliance
Audit Report - New York Independent System Operator - NYISO (12/03/07 - 12/07/07) 12.03.07 Compliance
Audit Report - NextEra Energy Resources Midwest Wind (07/27/09 - 08/07/09) 09.30.09 Compliance
Audit Report - NextEra Energy Resources, LLC (02/10/09 - 02/12/09) 06.23.09 Compliance
Audit Report - Niagara Mohawk Power Corp. (10/29/07 - 10/30/07) 10.29.07 Compliance
Audit Report - North American Energy Services (07/20/09 - 07/24/09) 11.20.09 Compliance
Audit Report - North American Energy Services (10/30/07) 07.28.08 Compliance
Audit Report - North American Energy Services Co. - Magnolia (05/19/09 - 05/21/09) 09.28.09 Compliance
Audit Report - North American Trading & Marketing Inc. (02/18/09) 04.06.10 Compliance
Audit Report - North American Trading & Marketing, Inc. (02/18/09) 04.17.09 Compliance
Audit Report - Northeast Power Coordinating Council, Inc. (10/19/09 - 11/09/09) 07.06.10 Compliance
Audit Report - Northeast Texas Electric Cooperative (04/27/09 - 04/30/09) 08.29.09 Compliance
Audit Report - Northern Iowa Wind Power 1, LLC (10/28/09) 12.22.09 Compliance
Audit Report - Northern Wasco County People's Utility (06/17/09) 08.02.10 Compliance
Audit Report - Nova Scotia Power Inc. (09/19/07 - 09/20/07) 09.19.07 Compliance
Audit Report - NRG Power Marketing LLC (02/12/09) 04.08.10 Compliance
Audit Report - NRG Texas Power LLC (09/01/09 - 09/03/09) 11.18.09 Compliance
Audit Report - NSTAR Electric (10/06/09 - 10/07/09) 01.15.10 Compliance
Audit Report - NSTAR Electric Company (12/20/07) 12.20.07 Compliance
Audit Report - Oak Grove Management Co, LLC (04/27/10 - 04/29/10) 07.30.10 Compliance
Audit Report - Occidental Chemical Corporation (08/18/08 - 08/19/08) 06.10.10 Compliance
Audit Report - Occidental Power Services, Inc. (06/03/08 - 06/13/08) 09.15.08 Compliance
Audit Report - Occidental Power Services, Inc. (09/01/09 - 09/04/09) 11.02.09 Compliance
Audit Report - Occidental pwer Services, Inc. (08/18/08 - 08/19/08) 11.18.08 Compliance
Audit Report - Odessa-Ector Power Partners LP (08/28/08) 11.04.08 Compliance
Audit Report - Oglethorpe Power Corporation (11/15/07) 07.28.08 Compliance
Audit Report - Oklahoma Municipal Power Authority (07/30/08 - 07/31/08) 01.08.09 Compliance
Audit Report - Old Dominion Electric Cooperative (04/02/08 -04/17/08) 08.12.08 Compliance
Audit Report - Old Dominion Electric Cooperative (08/23/07) 03.19.10 Compliance
Audit Report - Oncor Electric Delivery Company (06/28/07) 06.28.07 Compliance
Audit Report - Ontario Independent Electricity System Operator (06/17/08 - 07/14/08) 10.28.08 Compliance
Audit Report - Ontario Power Generation Inc. (10/14/08 - 10/20/08) 01.27.09 Compliance
Audit Report - Ontario's Independent Electricity System Operator (11/05/07 - 11/08/07) 11.07.07 Compliance
Audit Report - Optim Energy Altura Cogen, LLC (06/08/10 - 06/11/10) 08.18.10 Compliance
Audit Report - Optim energy Cedar Bayou 4, LLC (06/08/10 - 06/11/10) 08.18.10 Compliance
Audit Report - Orange & Rockland Utilities, Inc. (05/14/08 - 05/16/08) 10.28.08 Compliance
Audit Report - Overton Power District No. 5 (03/11/08 - 03/12/08) 05.20.10 Compliance
Audit Report - Owensboro Municipal Utilities (11/05/08 - 11/06/08) 05.05.10 Compliance
Audit Report - Oxy Vinyls LP (04/20/10 - 04/22/10) 06.11.10 Compliance
Audit Report - Pacific Northwest Generating Cooperative (02/10/09) 04.14.09 Compliance
Audit Report - Pacific Summit Energy LLC (02/12/09) 04.14.09 Compliance
Audit Report - Pacific-Ultrapower Chinese Station - GOP (03/12/09) 04.28.10 Compliance
Audit Report - Paulding Putnam Electric Cooperative Inc (11/09/09) 12.22.09 Compliance
Audit Report - PECO Energy Co. (09/11/07 - 09/12/07) 09.11.07 Compliance
Audit Report - Pedernales Electric CO OP, Inc. (03/12/08 - 03/13/08) 03.12.08 Compliance
Audit Report - Pennsylvania Electric Company (10/28/08 - 10/29/08) 03.17.09 Compliance
Audit Report - Pierre Municipal Utilities (05/27/09 - 06/05/09) 07.08.09 Compliance
Audit Report - Plains End, LLC (03/06/09) 04.28.10 Compliance
Audit Report - Platte River Power Authority (03/16/09 - 03/19/09) 04.08.10 Compliance
Audit Report - Potomac Electric Power Company (04/29/08 - 04/30/08) 08.04.08 Compliance
Audit Report - Poudre Valley Rural Electric Association, Inc. (03/19/08) 05.20.10 Compliance
Audit Report - PowerSouth Energy Cooperative (07/14/08 - 07/16/08) 12.16.08 Compliance
Audit Report - PPL Electric Utilities Corp. (02/24/09 - 02/26/09) 06.08.09 Compliance
Audit Report - PPL Energy Plus, LLC (11/09/09 - 11/17/09) 01.25.10 Compliance
Audit Report - PPL Montana, LLC (04/06/10) 05.19.10 Compliance
Audit Report - PPL Susquehanna, LLC, Inc. (11/09/09 - 11/20/09) 03.10.10 Compliance
Audit Report - PPM Energy, Inc. (03/21/08) 10.20.08 Compliance
Audit Report - Prairie Power, Inc. (09/02/09 - 09/03/09) 12.11.09 Compliance
Audit Report - Prairieland Energy Incorporated (07/14/10 - 07/15/10) 08.17.10 Compliance
Audit Report - Progress Energy Carolinas (04/28/08 - 05/01/08) 11.17.08 Compliance
Audit Report - Public Service Commission of Yazoo City (06/16/10) 07.30.10 Compliance
Audit Report - Public Service of New Hampshire ESCC (06/26/07 - 06/27/07) 06.26.07 Compliance
Audit Report - Public Utility District 1 of Chelan County (05/03/10 - 05/07/10) 08.19.10 Compliance
Audit Report - Public Utility District No. 1 of Chelan County (08/07/07 - 08/09/07) 07.26.10 Compliance
Audit Report - Public Utility District No. 1 of Skamania County (02/24/10) 06.22.10 Compliance
Audit Report - Raft River Rural Electric Cooperative (03/12/09) 04.28.10 Compliance
Audit Report - Rathdrum Power, LLC (03/06/09) 05.14.09 Compliance
Audit Report - Rayburn Country Co Op DBA Rayburn Electric (10/22/08 - 10/23/08) 01.16.09 Compliance
Audit Report - Reedy Creek Improvement District (09/29/08 - 10/02/08) 02.18.09 Compliance
Audit Report - ReliabilityFirst Corporation (03/23/09 - 03/30/09) 04.07.10 Compliance
Audit Report - Reliant Energy Coolwater, Inc. (06/09/09) 04.28.10 Compliance
Audit Report - Reliant Energy Florida, LLC (01/06/09 - 01/07/09) 05.27.09 Compliance
Audit Report - Reliant Energy Power Supply & Reliant Energy Channelview LP (06/04/08 - 06/05/08) 10.29.08 Compliance
Audit Report - Reliant Energy Wholesale Generation & Reliant Energy Service (11/01/07) 03.19.10 Compliance
Audit Report - Rio Bravo Fresno (06/10/09) 04.28.10 Compliance
Audit Report - Rio Bravo Jasmin (08/18/08) 03.29.10 Compliance
Audit Report - Rio Bravo Rocklin (08/19/08) 05.10.10 Compliance
Audit Report - Rio Nogales Power Project LP (03/27/08) 03.27.08 Compliance
Audit Report - Rochester Public Utility (09/06/07 - 09/07/07) 03.08.10 Compliance
Audit Report - Rocky Mountain Reserve Group (08/19/09) 08.02.10 Compliance
Audit Report - Rosebud Operating Services, Inc. (04/22/10) 05.14.10 Compliance
Audit Report - RRI Energy Etiwanda, Inc. (03/9/10) 07.30.10 Compliance
Audit Report - Sacramento Municipal Utility District (12/10/07 - 12/14/07) 05.10.10 Compliance
Audit Report - Saguaro Power Company, A Limited Partnership (03/10/10) 04.29.10 Compliance
Audit Report - Salem Electric (03/14/08) 06.04.10 Compliance
Audit Report - Salt River Project Agricultural Improvement & Power District (01/07/08 - 01/11/08) 06.04.10 Compliance
Audit Report - Salton Sea Power Generation, LP (06/10/09) 08.02.10 Compliance
Audit Report - San Bernard Electric Coop, Inc. (05/27/09 - 05/28/09) 08.12.09 Compliance
Audit Report - San Isabel Electric Association, Inc. (03/04/09) 04.23.10 Compliance
Audit Report - San Luis Valley Rural Electric Cooperative, Inc. (03/28/08) 10.20.08 Compliance
Audit Report - San Miguel Power Association, Inc. (10/14/08) 03.29.10 Compliance
Audit Report - Sempra Energy Trading Corporation (03/20/08) 10.20.08 Compliance
Audit Report - SERC Reliability Corporation (06-1-09 - 06/15/09) 05.03.10 Compliance
Audit Report - Sharyland Utilities LLC (08/19/09 - 08/20/09) 11.18.09 Compliance
Audit Report - Shell Energy North America (US) L.P. (11/10/08 - 11/11/08) 02.04.09 Compliance
Audit Report - Shell Energy North America (US) L.P. (11/10/08 - 11/11/08) 03.31.09 Compliance
Audit Report - SID Richardson Carbon LTD (05/13/09 - 05/14/09) 07.20.09 Compliance
Audit Report - Sikeston Board of Municipal Utilities (08/11/08 - 08/13/08) 01.28.09 Compliance
Audit Report - South Carolina Electric & Gas Co. (10/27/08 - 10/30/08) 03.10.09 Compliance
Audit Report - South Carolina Electric & Gas Company (05/27/08 - 05/30/08) 08.12.08 Compliance
Audit Report - South Central Power Company (05/27/08 - 05/28/08) 09.15.08 Compliance
Audit Report - South Eastern Electric Development Co. (09/17/08) 03.22.10 Compliance
Audit Report - South Eastern Electric Generating Co. (09/15/08 - 09/16/08) 03.22.10 Compliance
Audit Report - South Houston Green Power, LP (08/28/08 - 08/29/08) 11.24.08 Compliance
Audit Report - South Jersey Energy (08/31/09) 10.14.09 Compliance
Audit Report - South Mississippi Electric Power Association (10/02/07) 07.28.08 Compliance
Audit Report - South Mississippi Electric Power Association (11/09/09 - 11/12/09) 06.22.10 Compliance
Audit Report - South Texas Electric Co OP Inc. (06/03/09 - 06/05/09) 08.21.09 Compliance
Audit Report - South Texas Electric Co Op Inc. (07/19/07) 07.19.07 Compliance
Audit Report - South Western Electric Cooperative Inc. (09/17/08 - 09/18/08) 03.22.10 Compliance
Audit Report - Southern Company Services, Inc. (11/27/07 - 11/28/07) 07.28.08 Compliance
Audit Report - Southern Company Services, Inc. - Trans RC (11/16/09 - 11/18/09) 04.23.10 Compliance
Audit Report - Southwest Transmission Cooperative, Inc. (02/23/09 - 02/26/09) 09.02.10 Compliance
Audit Report - Southwestern Electric Cooperative, Inc. (03/04/09) 04.23.10 Compliance
Audit Report - Southwestern Public Service (09/18/07 - 09/20/07) 09.18.07 Compliance
Audit Report - SOWEGA Power, LLC (09/25/07) 07.28.08 Compliance
Audit Report - SPP Reliability Coordinator (10/29/07 - 10/31/07) 10.29.07 Compliance
Audit Report - Springer Electric Cooperative, Inc. (02/24/10) 06.24.10 Compliance
Audit Report - Springfield Utility Board (03/14/08, 03/17/08, 03/18/08) 10.20.08 Compliance
Audit Report - Spruance Genco, LLC (12/05/07) 07.28.08 Compliance
Audit Report - Spruance Operating Services, LLC (12/05/07) 07.28.08 Compliance
Audit Report - State Line Energy, LLC (09/02/08 - 09/11/08) 10.29.08 Compliance
Audit Report - STP Nuclear Operating Company (07/22/09 - 07/23/09) 10.06.09 Compliance
Audit Report - Strategic Energy LLC (03/20/08) 10.27.08 Compliance
Audit Report - Strategic Energy LLC (03/20/08) 04.06.10 Compliance
Audit Report - SUEZ Energy Marketing (03/03/09) 07.16.09 Compliance
Audit Report - Suez Energy Marketing NA, Inc. (10/13/08 - 10/22/08) 01.19.09 Compliance
Audit Report - Suez Energy Marketing, Hopewell Cogen LP, Hot Spring Power, Choctaw Gas Gen., Choctaw Gen. LP (04/15/08 - 04/16/08) 03.22.10 Compliance
Audit Report - Suez Energy Resources NA, Inc. (10/13/08 - 10/22/08) 01.19.09 Compliance
Audit Report - Sweeny Cogeneration Limited Partnership (10/21/08 - 10/22/08) 01.16.09 Compliance
Audit Report - Sycamore Cogeneration Company (06/11/09) 05.05.10 Compliance
Audit Report - Taunton Municipal Lighting Plant (04/08/08 - 04/10/08) 11.05.08 Compliance
Audit Report - Tenaska Frontier Partners Ltd. (10/27/09 - 10/29/09) 05.17.10 Compliance
Audit Report - Tenaska Alabama II Partners, L.P. (09/08/08 - 09/10/08) 01.08.09 Compliance
Audit Report - Tenaska Alabama Partners, LP (09/08/08 - 09/10/08) 06.22.10 Compliance
Audit Report - Tenaska Gateway Partners Ltd. (11/06/08 - 11/07/08) 02.03.09 Compliance
Audit Report - Tenaska Georgia Partners, LP (12/02/09 - 12/03/09) 06.22.10 Compliance
Audit Report - Tenaska Power Services (11/12/08 - 11/13/08) 02.05.09 Compliance
Audit Report - Tenaska Virginia Partners, L.P. (08/24/09 - 08/26/09) 01.25.10 Compliance
Audit Report - Tenaska Washington Partners, LP (04/20/10) 05.19.10 Compliance
Audit Report - Tennessee Valley Authority (03/04/09 - 03/05/09) 08.29.09 Compliance
Audit Report - Tennessee Valley Authority Reliability Coordinator (05/04/09 - 05/07/09) 01.25.10 Compliance
Audit Report - Termoelectrica US LLC (06/19/09) 07.16.09 Compliance
Audit Report - Terra-Gen Dixie Valley, LLC (03/05/09) 05.17.10 Compliance
Audit Report - Terra-Gen Operating Company, LLC (03/05/09) 05.17.10 Compliance
Audit Report - Terrebonne Parish Consolidated Government (08/12/09 - 08/13/09) 11.29.09 Compliance
Audit Report - Texas - New Mexico Power Co. (04/09/08 - 04/10/08) 04.09.08 Compliance
Audit Report - The Dow Chemical Company (08/20/08 - 08/21/08) 12.16.08 Compliance
Audit Report - The Energy Authority (03/20/08) 10.20.08 Compliance
Audit Report - The Energy Authority, Inc. (03/16/09 - 03/24/09) 09.25.09 Compliance
Audit Report - The Energy Authority, Inc. (03/16/09 - 03/24/09) 05.20.09 Compliance
Audit Report - Thermal Energy Development Partnership (03/10/09) 05.05.10 Compliance
Audit Report - Town of Estes Park - Light & Power Dept. (02/25/10) 06.15.10 Compliance
Audit Report - Tradinghouse Power Company LLC (07/23/08 - 07/24/08) 10.29.08 Compliance
Audit Report - TransAlta Energy Marketing (US) Inc. (12/07/09 - 12/08/09) 01.26.10 Compliance
Audit Report - Transmission Agency Northern California (11/06/09) 05.25.10 Compliance
Audit Report - Trent Wind Farm LP (08/06/08) 10.29.08 Compliance
Audit Report - Tri-State Generation and Transmission Association, Inc. - Reliability (06/01/09 - 06/05/09) 09.02.10 Compliance
Audit Report - Truckee Donner Public Utility District (10/15/08) 05.20.10 Compliance
Audit Report - Tuscon Electric Power Marketing (10/16/08) 03.29.10 Compliance
Audit Report - TXU Porfolio Management Company LP (06/27/07) 06.27.07 Compliance
Audit Report - UGI Development Company (08/25/09) 11.17.09 Compliance
Audit Report - UGI Energy Services, Inc. (08/25/09) 11.17.09 Compliance
Audit Report - Umatilla Electric Cooperative Assoc. (03/12/08) 08.02.10 Compliance
Audit Report - Union Power Partners (04/15/08 - 04/16/08) 03.19.10 Compliance
Audit Report - Union Rural Electric Cooperative Inc. (03/16/09 - 03/24/09) 05.29.09 Compliance
Audit Report - United Electric Co-op, Inc. (03/14/08 - 03/18/08) 06.04.10 Compliance
Audit Report - University Park Energy, LLC (08/24/09 - 09/4/09) 11.29.09 Compliance
Audit Report - Upper Peninsula Power Company) 10/12/09 - 10/21/09) 12.22.09 Compliance
Audit Report - US Operating Services Company - Chambers (03/17/09 - 03/24/09) 05.20.09 Compliance
Audit Report - Utah Associated Municipal Power Systems (03/19/08) 10.20.08 Compliance
Audit Report - Utah Associated Municipal Power Systems (03/19/08) 11.19.08 Compliance
Audit Report - Utah Associated Municipal Power Systems (07/29/08) 02.02.09 Compliance
Audit Report - VACAR South Reliability Coordinator (04/22/08 - 04/24/08) 11.17.08 Compliance
Audit Report - Vera Water & Power (11/05/09) 05.25.10 Compliance
Audit Report - Vermont Electric Cooperative, Inc. (09/26/07) 09.26.07 Compliance
Audit Report - Vermont Transco, LLC (06/16/09 - 06/18/09) 07.31.09 Compliance
Audit Report - Viasyn, Inc. (04/07/10) 05.19.10 Compliance
Audit Report - Vulcan/BN Geothermal Power Company (04/07/10) 05.25.10 Compliance
Audit Report - Wabash Valley Power Association Inc (11/09/09 - 11/16/09) 01.19.10 Compliance
Audit Report - Washington City Light & Power (11/09/09 - 11/12/09) 01.26.10 Compliance
Audit Report - Washington Electric Cooperative, Inc. (05/04/09 - 05/11/09) 06.18.09 Compliance
Audit Report - Watertown Municipal Utilities District (WMUD) (01/28/09- 02/05/09) 05.05.09 Compliance
Audit Report - Watson Cogeneration Company (06/11/09) 05.05.10 Compliance
Audit Report - West Georgia Generating Company (11/06/07) 03.19.10 Compliance
Audit Report - Westar Energy (10/02/07 - 10/04/07) 10.02.07 Compliance
Audit Report - Western Area Power Admin. Desert Southwest Region Merchant (03/03/09) 04.14.09 Compliance
Audit Report - Western Area Power Administration (08/22/07 - 08/23/07) 08.22.07 Compliance
Audit Report - Western Kentucky Energy Corp. (11/03/08 - 11/04/08) 03.10.09 Compliance
Audit Report - Westmoreland Partners (04/14/08 - 04/16/08) 03.22.10 Compliance
Audit Report - Wheelabrator Lassen, Inc. (06/12/09) 05.05.10 Compliance
Audit Report - Whitewater Operating Services, LLC (05/27/08 - 06/06/08) 08.12.08 Compliance
Audit Report - Wolf Hollow I, L.P. (10/29/08 - 10/30/08) 01.16.09 Compliance
Audit Report - Woodland Biomass Power Ltd. (08/04/08) 04.06.10 Compliance
Audit Report - WPPI Energy (03/03/09 - 03/12/09) 06.04.09 Compliance
Audit Report - Xcel Energy - Northern States Power (02/27/08 - 02/28/08) 02.27.08 Compliance
Audit Report - Y-W Electric Association (03/19/08) 10.20.08 Compliance
Audit Report - Yoakum Electric Generating Cooperative, Inc. (06/24/08 - 06/27/08) 01.20.09 Compliance
Audit Report - Yuma Cogeneration Associates (06/16/09) 05.05.10 Compliance
Auditi Report - Big Bend Electric Cooperative Inc. (03/10/09) 05.17.10 Compliance
Automatic Generation Control 05.10.10 Compliance
Automatic Generation Control 10.29.08 Standards
Automatic Time Error Correction (WECC) 01.01.90 Standards
Automatic Voltage Regulators (AVR) (WECC) 10.29.08 Standards
Automatic Voltage Regulators (WECC) 03.12.07 Standards
Available Transmission System Capability 08.26.08 Standards
BA Certification of City of North Little Rock 03.29.10 Compliance
BA Certification of Plum Point & Osceola 08.11.09 Compliance
BA of Griffith Final Report 01.05.09 Compliance
BA of Midwest ISO 02.07.08 Compliance
BA of Midwest ISO, Mid-America & Muscatine 09.08.09 Compliance
BA of NaturEner Final Report 01.05.09 Compliance
BAL and VAR NOPR Comments 01.07.09 About NERC
Balancing and Interchange Content Outline 03.12.09 Programs
Balancing Authority Questionnaire 01.24.08 Compliance
Balancing, Interchange, and Transmission Content Outline 03.12.09 Programs
Benton Rural Electric Association (Final Decision) 04.28.10 Compliance
BPA Comments 05.29.09 About NERC
Bylaws of the North American Electric Reliability Corporation 10.14.09 About NERC
Capacity and Energy Emergencies 05.10.10 Compliance
Capacity and Energy Emergencies 10.29.08 Standards
Capacity and Energy Emergencies 08.05.10 Standards
Capacity Benefit Margin 11.13.08 Standards
CERP Approval Checklist for Individual Learning (Ver4.0) 07.08.09 Programs
CERP Approval Checklist for Individual Learning (Ver4.1) 09.29.09 Programs
CERP Approval Checklist for Individual Learning Activities (Ver 4.3) 01.20.10 Programs
CERP Confidentiality Agreement 04.16.10 Programs
Certificate of Incorporation of the North America 12.14.06 About NERC
Certification of Protective Relay Applications and Settings (WECC) 03.12.07 Standards
Chairman of the Board of Trustees Job Description 02.22.07 About NERC
Change of Scope 8 - List of Changes 08.27.09 Programs
Changes to the GADS Data Reporting Instructions - Effective January 1, 2010 12.02.09 Assessments & Trends
Changes to Three Reliability Standards (Alberta) 09.10.09 About NERC
Changes to Three Reliability Standards (British Columbia) 09.10.09 About NERC
Changes to Three Reliability Standards (Manitoba) 09.10.09 About NERC
Changes to Three Reliability Standards (National Energy Board) 09.10.09 About NERC
Changes to Three Reliability Standards (New Brunswick) 09.10.09 About NERC
Changes to Three Reliability Standards (Ontario) 09.10.09 About NERC
Changes to Three Reliability Standards (Quebec) 09.10.09 About NERC
Changes to Three Reliability Standards (Saskatchewan) 09.10.09 About NERC
City of Tampa, Florida (Decision on Remand) 11.14.07 Compliance
City of Tampa, Florida, McKay Bay Resource Recovery and Wheelabrator Technologies, Inc. 07.30.07 Compliance
Comment Period Closed - August 28-September 28, 2009 10.01.09 Standards
Comment Period Closed - May 20-July 6, 2009 05.20.09 Standards
Comment Period Closed for FM Technical Document - Version 5 09.24.09 Standards
Comment Period Closed for Functional Model - Version 5 09.25.09 Standards
Comment Period Opens for Reports Evaluating Requests to Transfer Compliance Registration of Several Entities from MRO and SPP RE 08.31.10 Compliance
Comments - California ISO 08.11.08 Compliance
Comments - First Energy - RoP 500 08.08.08 Compliance
Comments - Gainesville Regional Utilities 07.23.08 Compliance
Comments - IROL Standard Drafting Team 08.06.08 Compliance
Comments - Manitoba Hydro 08.07.08 Compliance
Comments - Northeast Utilities 08.07.08 Compliance
Comments - NPCC 07.28.08 Compliance
Comments - Ontario IESO 08.12.08 Compliance
Comments - Pacific Gas and Electric 08.11.08 Compliance
Comments - PJM 08.08.08 Compliance
Comments - San Diego Gas and Electric 08.11.08 Compliance
Comments - SERC OC Standards Group 08.08.08 Compliance
Comments - Southern Company Comments on RoP 500 08.07.08 Compliance
Comments - Southern Company comments on RoP Appendix 5 08.07.08 Compliance
Comments - SPP ISO 08.08.08 Compliance
Comments - TAPS 08.11.08 Compliance
Comments following the July 6 Technical Conference 07.26.10 About NERC
Comments in Response to ATC Reliability Standards NOPR 05.26.09 About NERC
Comments in Response to February 19, 2009 NAESB Filing 03.06.09 About NERC
Comments in Response to FERC's January 21, 2010 NOI on the Integration of Variable Energy Resources 04.12.10 About NERC
Comments in Response to NOPR on the Revision to the ERO Definition of the Bulk Electric System 05.10.10 About NERC
Comments in Response to NOPR on Time Error Correction Standard BAL-004-1 04.28.10 About NERC
Comments in Response to NOPR on Two System Personnel Training Reliability Standards 08.23.10 About NERC
Comments in Response to Notice of Inquiry Regarding Reliability Standard IRO-006-4 and Curtailment Priorities 03.29.10 About NERC
Comments in Response to the Commission's September 18, 2008 Order on Proposed Clarification 11.03.08 About NERC
Comments in Response to the FERC's October 28, 2009 Draft on the Possible Elements of a National Action Plan on Demand Response 12.04.09 About NERC
Comments in Response to the March 18, 2010 BAL-002-WECC-01 NOPR 05.24.10 About NERC
Comments in Support of Texas RE and Constellation Settlement Agreement 05.12.09 About NERC
Comments of NERC in Response to Notice of Proposed Rulemaking 08.17.09 About NERC
Comments of the NERC on the NOPR for Mandatory Reliability Standard for Nuclear Plant Interface Coordination 05.13.08 About NERC
Comments of the NERC on the NOPR for Standards for Business Practices and Communication Protocols for Public Utilities 05.28.08 About NERC
Comments of the NERC on the NOPR on Modification of Interchange and TLR Reliability Standards; and 06.12.08 About NERC
Comments on Interpretation of Reliability Standard TPL-002-0 05.10.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - American Transmission Company 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - City Utilities of Springfield, Missouri 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Constellation and affiliates 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Dailyland Power Cooperative 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Duke Energy 04.28.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Edison Electric Institute 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Empire District Electric Company 04.29.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - First Energy 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Georgia Systems Operations Corporation 04.27.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - ISO/RTO Council Standards Review Committee 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Kansas City Power and Light 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Luminant 04.21.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Nebraska Public Power District 04.29.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Procedures Subcommittee of the NERC CCC 04.29.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Southwest Power Pool, Inc. 04.30.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Tom Abrams, Chair of the NERC CCC 04.29.10 About NERC
Comments on Proposed Changes to Rules of Procedure and Appendices - Transmission Access Policy Study Group 04.28.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Additional Comments from the Electric Power Supply Association 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Ameren 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - American Electric Power 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Bonneville Power Administration 06.08.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - City Utilities of Springfield, Missouri 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Consolidated Edison Company of New York, Inc. 06.03.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Dominion 06.03.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Duke Energy 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Empire District Electric Company 06.03.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Entergy 06.03.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - FirstEnergy 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Florida Reliability Coordinating Council 06.03.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Georgia System Operations Corporation 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Hydro One Networks, Inc. 06.02.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - ISO-RTO Council's Standard Review Committee 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Kansas City Power & Light and KCP&L - Greater Missouri Operations Co 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Manitoba Hydro 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - NRG Energy, Inc. 06.02.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - PJM Interconnection 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Regional Standard's Committee of NPCC 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - SERC Reliability Corporation 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Southern Company 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - SPS Consulting Group Inc 05.20.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - The United Illuminating Company 06.02.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Trade Associations 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Western Electricity Coordinating Council 06.04.10 About NERC
Comments on Proposed Changes to Section 300 of the NERC Rules of Procedure - Wisconsin Electric Power Company 06.03.10 About NERC
Comments on Revised Regional Delegation Agreements - American Transmission Company 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - Constellation Energy 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - Duke Energy 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - Edison Electric Institute 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - Empire District Electric Company 03.02.10 About NERC
Comments on Revised Regional Delegation Agreements - ISO/RTO Council's Standards Review Committee 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - Kansas City Power & Light 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - National Rural Electric Cooperative Association 03.05.10 About NERC
Comments on Revised Regional Delegation Agreements - Nebraska Public Power District 02.17.10 About NERC
Comments on Revised Regional Delegation Agreements - Nebraska Public Power District Supplemental Comments 03.04.10 About NERC
Comments on Revised Regional Delegation Agreements - Southwest Power Pool, Inc. 02.24.10 About NERC
Comments on the BPS TIER Report 10.28.09 About NERC
Comments on the Discussion Paper - Joint Comments from APPA, EEI and NRECA 12.09.09 About NERC
Comments on the Discussion Paper - MRC Sector 2 Members 11.30.09 About NERC
Comments on the Discussion Paper - Southwest Power Pool 11.30.09 About NERC
Comments on the NOPR for Version Two FAC Standards 11.24.08 About NERC
Comments on WECC Regional Reliability Standard NOPR 01.12.09 About NERC
Comments Received on GOTO Draft Paper Posting 10.16.09 Standards
Comments Regarding the Proposed Policy Statement on Penalty Guidelines 06.14.10 About NERC
Communications and Coordination 11.02.09 Compliance
Communications and Coordination 11.01.06 Standards
Complaint Form 05.30.06 Programs
Compliance Analysis Report: CIP-004-1 12.09.09 Compliance
Compliance Analysis Report: CIP-001 05.12.10 Compliance
Compliance Analysis Report: FAC-008-1 and FAC-009-1 02.19.10 Compliance
Compliance Analysis Report: PRC-005-1 12.07.09 Compliance
Compliance Analysis Report: VAR-002 08.10.10 Compliance
Compliance and Certification Committee Hearing Procedures, Hearing Procedures for Use in Appeals, and Mediation Procedures 06.10.10 About NERC
Compliance Application Notice: CIP-002-3 R3 (Original Posting: 06/22/10) 07.06.10 Compliance
Compliance Application Notice: INT-004-2 R1 05.05.10 Compliance
Compliance Application Notice: IRO-004-1 R3 05.05.10 Compliance
Compliance Application Notice: IRO-006-4.1 R2 05.05.10 Compliance
Compliance Application Notice: TOP-003-0 R1.3 05.05.10 Compliance
Compliance Audit Timeline 09.03.08 Compliance
Compliance Enforcement Coordinator 04.08.10 About NERC
Compliance Filing and Assessment of the BES Definition Report of NERC and NPCC 09.21.09 About NERC
Compliance Filing and Petition for Approval of an Implementation Plan for CIP Reliability Standards 09.15.09 About NERC
Compliance Filing in Response to April 23 Letter Order 04.30.09 About NERC
Compliance Filing in Response to December 17, 2009 FERC Order Regarding Scope of Systems 01.19.10 About NERC
Compliance Filing in Response to February 19, 2009 Order 04.06.09 About NERC
Compliance Filing in Response to FERC Order 713-A 06.22.09 About NERC
Compliance Filing in Response to FERC Order 716- Revised VRFs 12.18.09 About NERC
Compliance Filing in Response to FERC's January 21, 2010 Order Concering Appendix 4D to the NERC ROP 04.21.10 About NERC
Compliance Filing in Response to FERC's March 18, 2010 Order No. 733 Approving PRC-023-1 07.16.10 About NERC
Compliance Filing In Response to June 1, 2009 FERC Order 07.30.09 About NERC
Compliance Filing in Response to October 15, 2009 Order on the 2010 Business Plan and Budget 12.11.09 About NERC
Compliance Filing in Response to Order No. 716 and Petiton for Approval of NUC Reliability Standard 08.14.09 About NERC
Compliance Filing in Response to Order No. 722 07.06.09 About NERC
Compliance Filing in Response to Order No. 722 - Version 2 Facilities Design, Connections, and Maintenance Reliability Standards. 05.29.09 About NERC
Compliance Filing in Response to Order No. 723 08.28.09 About NERC
Compliance Filing in Response to Order No. 723, Proposed VSLs for WECC Regional Reliability Standard 10.23.09 About NERC
Compliance Filing in Response to Order No. 733- Revisd VRFs and VSLs for PRC-023-1 04.19.10 About NERC
Compliance Filing in response to Order on Compliance Filing- Mandatory Reliability Standards for the CIP VRFs 06.30.09 About NERC
Compliance Filing in response to P 107 Order No. 716 11.17.08 About NERC
Compliance Filing in Response to Paragraph 223 of Order No. 890 11.21.08 About NERC
Compliance Filing in Response to Paragraph 223 of Order No. 890 08.29.08 About NERC
Compliance Filing in Response to Paragraph 47 of the June 19, 2008 Order 12.19.08 About NERC
Compliance Filing in Response to Paragraph 50 of Order No. 713 09.11.08 About NERC
Compliance Filing in Response to Paragraph 629 of Order No. 693 06.01.09 About NERC
Compliance Filing in Response to Paragraph 76 of the November 20, 2008 Order 12.19.08 About NERC
Compliance Filing in Response to Paragraph 951 of Order No. 693 10.31.08 About NERC
Compliance Filing in Response to the December 19, 2008 Order 02.17.09 About NERC
Compliance Filing in Response to the March 18, 2010 Order on VSL Assignments for CIP Standards 05.17.10 About NERC
Compliance Filing in response to the October 16, 2008 Order on the 2009 Business Plan and Budget Filing 12.15.08 About NERC
Compliance Filing in Response to the Order on VSL Proposed by the ERO and a Request for an Extension of Time 03.05.10 About NERC
Compliance Filing in Response to the September 30, 2009 Order 12.29.09 About NERC
Compliance Filing of NERC and FRCC in Response to FERC's December 19, 2008 Order 06.30.10 About NERC
Compliance Filing of NERC and NPCC in Response to December 18 Order 02.20.09 About NERC
Compliance Filing of NERC and NPCC in Response to FERC's December 19th, 2008 Order 06.30.10 About NERC
Compliance Filing of NERC and SPP in Response to September 17, 2009 Order 12.01.09 About NERC
Compliance Filing of NERC in Response to December 20, 2007 Order 07.31.08 About NERC
Compliance Filing of NERC in Response to Order on Reliability Enhancement Programs 07.21.08 About NERC
Compliance Filing of NERC in response to Paragraph 40 of the Order on VSLs Proposed by the ERO 07.21.08 About NERC
Compliance Filing of NERC in response to the Commission's May 16, 2008 Order 07.25.08 About NERC
Compliance Filing of the NERC and NPCC, Inc. in Response to Paragraph 174 of March 21, 2008 Commission Order 05.19.08 About NERC
Compliance Filing of the NERC in Response to December 20, 2007 Order 03.04.08 About NERC
Compliance Filing of the NERC in response to June 19, 2008 Order 07.21.08 About NERC
Compliance Filing of the NERC in response to March 21, 2008 Order 07.21.08 About NERC
Compliance Filing of the NERC in Response to Para. 135 of Order No. 705 04.01.08 About NERC
Compliance Filing of the NERC in Response to the Commission's February 21, 2008 Order 05.16.08 About NERC
Compliance Filing of the NERC in Response to the Commission's June 7, 2007 Order 03.03.08 About NERC
Compliance Filing of the NERC in Response to the October 18, 2007 Order 01.15.08 About NERC
Compliance Filing of the NERC in response to the Paragraph 757 of Order No. 706 06.27.08 About NERC
Compliance Filing Regarding Consistency of WECC 11.02.07 About NERC
Compliance Issuances Second Quarter Report 07.06.10 Compliance
Compliance Monitoring Processes Timeline 08.28.08 Compliance
Compliance Operations Administrative Assistant 08.10.10 About NERC
Compliance Process Evaluation Report 12.15.09 Compliance
Compliance Registry Appeal Decision on Remand 10.06.08 About NERC
Compliance Registry Change Activity (By Entity Name) 08.27.10 Compliance
Compliance Registry Change Activity (By NCR ID#) 08.27.10 Compliance
Compliance Registry List 08.27.10 Compliance
Compliance Registry Listing (by Entity Name) 08.27.10 Compliance
Compliance Registry Listing (by NERC ID) 08.27.10 Compliance
Compliance Registry Listing (Excel) 08.27.10 Compliance
Compliance Registry Summary 08.27.10 Compliance
Compliance Violation Investigation Timeline 09.04.08 Compliance
Compliance Violation Statistics - 4th Quarter 2008 02.20.09 Compliance
Compliance Violation Statistics - April 2009 05.12.09 Compliance
Compliance Violation Statistics - April 2010 05.17.10 Compliance
Compliance Violation Statistics - August 2009 09.16.09 Compliance
Compliance Violation Statistics - December 2009 01.21.10 Compliance
Compliance Violation Statistics - February 2009 03.24.09 Compliance
Compliance Violation Statistics - February 2010 03.19.10 Compliance
Compliance Violation Statistics - January 2009 03.09.09 Compliance
Compliance Violation Statistics - January 2010 02.17.10 Compliance
Compliance Violation Statistics - July 2009 08.11.09 Compliance
Compliance Violation Statistics - July 2010 08.12.10 Compliance
Compliance Violation Statistics - June 2009 07.14.09 Compliance
Compliance Violation Statistics - June 2010 08.11.10 Compliance
Compliance Violation Statistics - March 2009 04.24.09 Compliance
Compliance Violation Statistics - March 2010 04.22.10 Compliance
Compliance Violation Statistics - May 2009 06.16.09 Compliance
Compliance Violation Statistics - May 2010 06.29.10 Compliance
Compliance Violation Statistics - November 2009 12.01.09 Compliance
Compliance Violation Statistics - October 2009 11.10.09 Compliance
Compliance Violation Statistics - September 2009 10.15.09 Compliance
Conflict of Interest and Business Ethics Policy for Trustees, Officers, and Employees 07.30.08 About NERC
Consideration of Comments FM V4 and Associated Technical Reference 12.02.08 Standards
Constellation Energy Commodities Group, Inc. 11.07.07 Compliance
Constellation Energy Commodities Group, Inc. (CCG) 05.22.08 Compliance
Contingency Reserve (WECC) 10.29.08 Standards
Continuing Education Program Administrative Manual (Ver 4.1) 03.30.09 Programs
Control Labeling of Generator Voltage Regulators 06.23.10 About NERC
Coordination of Plan for New Generation, Transmission, and End-User 11.02.09 Compliance
Coordination of Plans For New Generation, Transmission, and End-User 02.05.05 Standards
Coordination of Plans For New Generation, Transmission, and End-User Facilities 08.05.10 Standards
Coordination of Real-time Activities Between Reliability Coordinators 02.07.06 Standards
Coordination of Real-time Activities Between Reliability Coordinators 01.13.10 Compliance
Cordova Energy Company, LLC 08.19.08 Compliance
CORRECTED- Compliance Filing of NERC in response to June 19, 2008 Order 07.25.08 About NERC
Course Data Form 02.25.10 Programs
Critical Cyber Asset Identification 05.02.06 Standards
Critical Energy Infrastructure Information 06.21.05 About NERC
Crowe Horwath LLP, Agreed-Upon Procedures Report for ReliabilityFirst Corporation 04.07.10 Compliance
Crowe Horwath, LLP Agreed-Upon Procedurees Report for Midwest Reliability Organization 08.12.10 Compliance
Crowe Horwath, LLP Agreed-Upon Procedures Report for NPCC 07.06.10 Compliance
Crowe Horwath, LLP Agreed-Upon Procedures Report for SERC Reliability Corporation 05.03.10 Compliance
Cyber Security - Critical Cyber Asset Identification 05.06.09 Standards
Cyber Security - Critical Cyber Asset Identification 12.16.09 Standards
Cyber Security - Critical Cyber Asset Identification 01.13.10 Compliance
Cyber Security - Electronic Security Perimeter(s) 01.13.10 Compliance
Cyber Security - Electronic Security Perimeter(s) 12.16.09 Standards
Cyber Security - Electronic Security Perimeter(s) 02.16.10 Standards
Cyber Security - Electronic Security Perimeter(s) 05.06.09 Standards
Cyber Security - Incident Reporting and Response Planning 05.06.09 Standards
Cyber Security - Incident Reporting and Response Planning 12.16.09 Standards
Cyber Security - Incident Reporting and Response Planning 01.13.10 Compliance
Cyber Security - Personnel & Training 12.16.09 Standards
Cyber Security - Personnel & Training 05.06.09 Standards
Cyber Security - Personnel and Training 01.13.10 Compliance
Cyber Security - Physical Security of Critical Cyber Assets 01.13.10 Compliance
Cyber Security - Physical Security of Critical Cyber Assets 12.16.09 Standards
Cyber Security - Physical Security of Critical Cyber Assets 02.16.10 Standards
Cyber Security - Physical Security of Critical Cyber Assets 05.06.09 Standards
Cyber Security - Recovery Plans for Critical Cyber Assets 05.06.09 Standards
Cyber Security - Recovery Plans for Critical Cyber Assets 12.16.09 Standards
Cyber Security - Recovery Plans for Critical Cyber Assets 01.13.10 Compliance
Cyber Security - Security Management Controls 01.13.10 Compliance
Cyber Security - Security Management Controls 12.16.09 Standards
Cyber Security - Security Management Controls 05.06.09 Standards
Cyber Security - Systems Security Management 11.05.09 Standards
Cyber Security - Systems Security Management 12.16.09 Standards
Cyber Security - Systems Security Management 01.13.10 Compliance
Cyber Security Threat and Vulnerability Program Manager 03.01.10 About NERC
Data Collection for Demand-Side Management 12.01.07 Assessments & Trends
Data From the Regional Reliability Organization Needed to Assess Reliability 04.15.09 Standards
Data From the Regional Reliability Organization Needed to Assess Reliability 02.02.05 Standards
Define Regional Disturbance Monitoring and Reporting Requirements 08.02.06 Standards
Delegation Agreement Between NERC and WECC 06.29.09 About NERC
Deliverable Capacity Resources Summer 03.04.10 Assessments & Trends
Deliverable Capacity Resources Winter 03.04.10 Assessments & Trends
Department of Energy; Southeastern Power Administration 09.27.07 Compliance
Development and Documentation of Regional UFLS Programs 02.02.05 Standards
Development of Dynamics System Models 02.02.05 Standards
Development of Dynamics System Models 10.29.08 Standards
Development of Steady-State System Models 02.02.05 Standards
Direct Energy Services, LLC 08.27.07 Compliance
Directions to NERC's DC Office 04.10.08 About NERC
Directions to NERC's Princeton Office 04.10.08 About NERC
Discussion Paper for Regional Delegation Agreement Workshop 10.26.09 About NERC
Disturbance Control Performance 05.10.10 Compliance
Disturbance Control Performance 02.02.05 Standards
Disturbance Control Performance 08.05.10 Standards
Disturbance Monitoring Equipment Installation and Data Reporting 08.02.06 Standards
Disturbance Monitoring Equipment Installation and Data Reporting 01.13.10 Compliance
Disturbance Reporting 11.01.06 Standards
Disturbance Reporting 05.10.10 Compliance
Documentation of Blackstart Generating Unit Test Results 11.02.09 Compliance
Documentation of Blackstart Generating Unit Test Results 02.02.05 Standards
Documentation of Data Reporting Requirements for Actual and Forecast Demands 10.29.08 Standards
Documentation of Data Reporting Requirements for Actual and Forecast Demands, 11.24.08 Compliance
Documentation of the Accounting Methodology for the Effects of Controllable Demand-Side Management 11.24.08 Compliance
Documentation of the Accounting Methodology for the Effects of Controllable DSM in Demand and Energy Forecasts 04.15.09 Standards
Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts 08.05.10 Standards
Documentation of the Use of Capacity Benefit Margin 11.24.08 Compliance
Documentation of the Use of Capacity Benefit Margin 02.02.05 Standards
Draft Compliance Application Notice: CIP-004-2 R4.2 and CIP-004-3 R4.2 07.30.10 Compliance
Draft Compliance Application Notice: EOP-005-1 R7 07.30.10 Compliance
Draft for Comment of the National Action Plan on Demand Response 03.11.10 About NERC
DRAFT Report from the Ad Hoc Group for Generator Requirements at the Transmission Interface 08.14.09 Standards
Drafting Team Guidelines 05.04.09 Standards
Duke Energy Comments 05.29.09 About NERC
Dynamic Interchange Transaction Modifications 10.09.07 Standards
Dynamic Interchange Transaction Modifications 05.10.10 Compliance
Dynamics Data for Modeling and Simulation of the Interconnected Transmission System 02.02.05 Standards
Dynamics Data for Transmission System Modeling and Simulation 05.10.10 Compliance
E-mail Annoucement - Comment Period Opens regarding Proposed Changes to Regional Delegation Agreements 01.29.10 About NERC
e-Tag 1.8.000 Schema 10.09.07 Programs
e-Tagging Functional Specifications (Version 1.8.0) - Redline Version 11.07.07 Programs
e-Tagging Functional Specifications - Version 1.8.0 11.07.07 Programs
ECAR Compliance Enforcement Program Audit Report - January 6, 2005 08.16.05 Compliance
ECAR Response to NERC Audit Report 08.16.05 Compliance
EEA 3 Report - Alabama Electric Cooperative, Inc. (12/14/07) 12.24.07 Events Analysis
EEA 3 Report - Alabama Electric Cooperative, Inc. (8/29/07) 08.29.07 Events Analysis
EEA 3 Report - Alberta Electric System Operator 09.30.09 Events Analysis
EEA 3 Report - City of Conway (8/29/07) 08.29.07 Events Analysis
EEA 3 Report - City of North Little Rock (8/29/07) 08.29.07 Events Analysis
EEA 3 Report - CNWY (03/03/09) 03.03.09 Events Analysis
EEA 3 Report - Constellation Energy (4/14/08) 04.29.08 Events Analysis
EEA 3 Report - Conway (CNWY) (11/16/08) 11.16.08 Events Analysis
EEA 3 Report - DERS (5/3/2008) 05.12.08 Events Analysis
EEA 3 Report - DERS (6/24/08) Rev. 1 06.30.08 Events Analysis
EEA 3 Report - HGMA (12/24/07) 12.24.07 Events Analysis
EEA 3 Report - Lafayette Utilities System (05/23/10) 06.01.10 Events Analysis
EEA 3 Report - Lafayette Utilities System (05/24/10) 06.01.10 Events Analysis
EEA 3 Report - Lafayette Utilities System (06/024//09) 07.14.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (06/23//09) 07.14.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (06/25/09) 07.27.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (06/26//09) 07.14.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (06/29/09) 07.08.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/01/09) 07.08.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/02/09) 07.30.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/03/09) 07.27.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/06/09) 07.08.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/08/09) 07.15.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/09/09) 07.13.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/10/09) 07.30.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/13/09) 07.30.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/14/09) 07.30.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/25/08) 07.25.08 Events Analysis
EEA 3 Report - Lafayette Utilities System (07/27/08) 07.27.08 Events Analysis
EEA 3 Report - Lafayette Utilities System (08/17/09) 08.20.09 Events Analysis
EEA 3 Report - Lafayette Utilities System (10/07/09) 10.14.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (01/11/10) 01.15.10 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/19//09) 07.14.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/23/09) 07.14.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/24/09) 07.14.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/25/09) 07.14.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/26/09) 07.27.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/29/09) 07.08.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (06/30/09) 07.08.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/01/09) 07.08.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/02/09) 07.13.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/03/09) 07.08.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/06/09) 07.08.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/13/09) 07.27.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (07/14//09) 07.27.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (08/05/09) 08.26.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (09/08/08) 09.08.08 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (10/05/09) 10.26.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (10/06/09) 10.28.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (10/07/09) 10.14.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority (10/14/09) 10.26.09 Events Analysis
EEA 3 Report - Louisiana Energy & Power Authority LEPA (05/23/10) 06.01.10 Events Analysis
EEA 3 Report - Nova Scotia Power (04/09/09) 04.09.09 Events Analysis
EEA 3 Report - PacifiCorp East Balancing Authority Area (2/14/08) 02.14.08 Events Analysis
EEA 3 Report - PowerSouth Energy Cooperative 07.20.10 Events Analysis
EEA 3 Report - PowerSouth Energy Cooperative 08.03.10 Events Analysis
EEA 3 Report - PowerSouth Energy Cooperative 08.17.10 Events Analysis
EEA 3 Report - SECI (07/22/08) 07.22.08 Events Analysis
EEA 3 Report - Westar Energy (12/11/07) 12.11.07 Events Analysis
EEI Comments 05.29.09 About NERC
Election Procedure for Members of NERC Standards Committee 01.18.07 About NERC
Electronic Security Perimeter(s) 05.02.06 Standards
Electronic Security Perimeter(s) 02.16.10 Standards
Emergency Operations Planning 08.05.09 Standards
Emergency Operations Planning 02.02.05 Standards
Emergency Operations Planning 10.17.08 Standards
Emergency Operations Planning 11.02.09 Compliance
EMS-SCADA Systems - Training System vs. Live EMS Screen 04.14.10 About NERC
EOE100-5- WAPA-UGPR - (06/25-06/28) 07.31.08 Programs
EOE101-21- Wisconsin Energy Corporation - (05/07-05/10) 07.31.08 Programs
EOE102-10 - Tennessee Valley Authority - (03/12-03/15) 07.31.08 Programs
EOE103-10 - Midwest Energy 02.11.09 Programs
EOE104-10 - Entergy Services, Inc. - (12/03-12/06) 02.24.09 Programs
EOE105-10 - PJM Interconnection, L.L.C. - (05/21-05/24) 02.26.09 Programs
EOE106-10 - Potomac Electric Power Co. - (10/06-10/08) 09.15.09 Programs
EOE14-11 - Western Area Power Administration - Upper Great Plains Region (8/24-25/04) 07.13.05 Programs
EOE17-01 - ITC Transmission Company - (04/24/08) 02.24.09 Programs
EOE33-11 - FirstEnergy Corp. (2/26-27/04) 10.02.05 Programs
EOE33-12 - Florida Power & Light - (04/09-04/12) 02.25.09 Programs
EOE33-13 - Pacific Northwest Security Coordinator - (07/3-08/02) 02.26.09 Programs
EOE59-4 - Seattle City Light (08/23-26/05) 06.07.06 Programs
EOE70-18 - Western Area Power Administration - Sierra Nevada Region (9/7-9/05) 06.07.06 Programs
EOE72-13 - Great River Energy (8/23-25/05) 06.07.06 Programs
EOE78-13 - Sierra Pacific Power Company (5/8-11/06) 02.15.07 Programs
EOE81-5 - Idaho Power Company (5/22-26/06) 02.15.07 Programs
EOE82-2 - Independence Power and Light Department (10/25-27/05) 02.15.07 Programs
EOE85-15 - Great River Energy (8/23-25/05) 02.15.07 Programs
EOE86-8 - East Kentucky Power Cooperative, Inc. (11/1-3/05) 02.15.07 Programs
EOE87-10 - City Water, Light & Power (11/8-10/05) 02.15.07 Programs
EOE88-10 - Midwest Independent Transmission System Operator (11/9-16/06) 05.10.07 Programs
EOE89-10 - Midwest Independent Transmission System Operator (11/9-16/06) 05.10.07 Programs
EOE90-30 - Midwest Independent Transmission System Operator (11/9-16/06) 05.10.07 Programs
EOE91-10 - Midwest Independent Transmission System Operator (11/9-16/06) 05.10.07 Programs
EOE92-5 - Midwest Independent Transmission System Operator (11/9-16/06) 05.10.07 Programs
EOE93-12 - Midwest Independent Transmission System Operator (11/9-16/06) 05.10.07 Programs
EOE94-19 - FirstEnergy (4/24/07) 05.31.07 Programs
EOE95-20 - Commonwealth Edison (11/6-9/06) 06.14.07 Programs
EOE96-6 - Duke Energy Midwest (10/16-19/06) 07.18.07 Programs
EOE97-5 - British Columbia Transmission Corporation (6/26-29/06) 07.18.07 Programs
EOE98-20- American Electric Power - (04/23-04/26) 07.31.07 Programs
EOE99-22- Tennessee Valley Authority - (03/12-03/15) 07.31.08 Programs
Eratta Filing Regarding Notice of Penalty NP10-110-000 06.21.10 About NERC
ERCOT Compliance Enforcement Program Audit Report - March 21-22, 2006 07.13.06 Compliance
ERCOT Response to NERC Audit Report 07.13.06 Compliance
ERO Application - Transmittal Letter (Alberta) 04.04.06 About NERC
ERO Application - Transmittal Letter (British Columbia) 04.04.06 About NERC
ERO Application - Transmittal Letter (Manitoba) 04.04.06 About NERC
ERO Application - Transmittal Letter (NEB) 04.04.06 About NERC
ERO Application - Transmittal Letter (New Brunswick) 04.04.06 About NERC
ERO Application - Transmittal Letter (Nova Scotia) 04.04.06 About NERC
ERO Application - Transmittal Letter (Ontario) 04.04.06 About NERC
ERO Application - Transmittal Letter (Quebec) 04.04.06 About NERC
ERO Application - Transmittal Letter (Saskatchewan) 04.04.06 About NERC
ERO Interpretations of Specific Requirements of BAL-003-0 and VAR- 001-1 Reliability Standards 05.21.09 About NERC
Errata - Approval of 15 Reliability Standards that contain errata changes 02.06.09 About NERC
Errata letter regarding PRC-023-1 (Alberta) 05.13.09 About NERC
Errata letter regarding PRC-023-1 (British Columbia) 05.05.09 About NERC
Errata letter regarding PRC-023-1 (Manitoba) 05.05.09 About NERC
Errata letter regarding PRC-023-1 (National Energy Board) 05.05.09 About NERC
Errata letter regarding PRC-023-1 (New Brunswick) 05.05.09 About NERC
Errata letter regarding PRC-023-1 (Ontario) 05.05.09 About NERC
Errata letter regarding PRC-023-1 (Quebec) 05.05.09 About NERC
Errata letter regarding PRC-023-1 (Saskatchewan) 05.05.09 About NERC
Errata Notice - Modification of Interchange and TLR Reliability Standards; 03.19.09 About NERC
Errata Notice for Order 729 12.04.09 About NERC
Errata Petition of NERC for Approval of Two Standards 07.28.08 About NERC
Errata to Notice of Penalty NP10-60-000 03.12.10 About NERC
Errata to Notice of Penalty NP10-86-000 04.09.10 About NERC
Errata to November 20, 2008 Filing 12.01.08 About NERC
Errata to Petition for Approval of Amendments to the NERC ROP Regarding the CCC Program and Charter 03.16.10 About NERC
Errata to the Footnotes in Three Letter Orders Issued by the Commission on January 29, 2010 02.02.10 About NERC
Errata to the July 30, 2008 Filing - Petition for Approval of PRC-023-1 Reliability Standard 02.04.09 About NERC
Errata to the Order Addressing the CIP VSLs 03.23.10 About NERC
Errata- April 19, 2010 Request of NERC for Rehearing and Motion for Stay in the Order Setting Deadline for Compliance 04.20.10 About NERC
Establish and Communicate Facility Ratings 11.02.09 Compliance
Establish and Communicate Facility Ratings 02.07.06 Standards
Establish and Communicate System Operating Limits 11.02.09 Compliance
Establish and Communicate System Operating Limits 06.24.08 Standards
Establish and Communicate Transfer Capabilities 02.07.06 Standards
Establish and Communicate Transfer Capabilities 11.02.09 Compliance
Establish, Maintain, and Document a Regional Blackstart Capability Plan 02.02.05 Standards
Exam Statistics 01.27.10 Programs
Executed Amended and restated delegation Agreement Between NERC and FRCC 01.03.09 About NERC
Executed Amended and Restated Delegation Agreement Between NERC and MRO 01.03.09 About NERC
Executed Amended and Restated Delegation Agreement Between NERC and NPCC 01.03.09 About NERC
Executed Amended and Restated Delegation Agreement Between NERC and RFC 01.03.09 About NERC
Executed Amended and Restated Delegation Agreement Between NERC and SERC Reliability Corporation 01.03.09 About NERC
Executed Amended and Restated Delegation Agreement Between NERC and SPP 01.03.09 About NERC
Executed Amended and Restated Delegation Agreement Between NERC and WECC 01.03.09 About NERC
Exelon Comments 05.29.09 About NERC
Facilities Design, Connections and Maintenance Reliability Standards (Issued 12/27/07) 12.27.07 About NERC
Facilities Design, Connections and Maintenance Reliability Standards (Issued 8/13/07) 08.13.07 About NERC
Facility Connection Requirements 02.02.05 Standards
Facility Connection Requirements 11.02.09 Compliance
Facility Ratings Methodology 02.07.06 Standards
Facility Ratings Methodology 11.02.09 Compliance
Fault Induced Delayed Voltage Recovery (FIDVR) Conference Presentation 04.22.08 About NERC
Fault Induced Delayed Voltage Recovery (FIDVR) Conference Presentation 09.29.09 About NERC
Federal Agencies Contact List 07.22.09 Compliance
FERC Approval of 706B Implementation 03.19.10 Compliance
FERC Approves Three Planning and Operating Reliability Standards 12.20.07 About NERC
FERC Order - Requiring for the Compliance Filing from NERC 03.08.10 Compliance
FERC Order 706 03.08.10 Compliance
FERC Order 706-B 03.08.10 Compliance
FERC Staff Preliminary Assessment of the NERC Proposed Mandatory Reliability Standards 05.11.06 About NERC
FERC's 2009 Report on Enforcement 12.17.09 About NERC
FERC's Criteria for Approving Reliability Standards 03.16.10 Standards
Filing of NPCC Amended and Restated Bylaws 11.29.07 About NERC
Filing of Reliability Enhancement Programs 11.02.07 About NERC
Filing of the 2007 Business Plan and Budget (Alberta) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (British Columbia) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (Manitoba) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (NEB) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (New Brunswick) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (Nova Scotia) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (Ontario) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (Quebec) 08.23.06 About NERC
Filing of the 2007 Business Plan and Budget (Saskatchewan) 08.23.06 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Alberta) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (British Columbia) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Manitoba) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (NEB) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (New Brunswick) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Nova Scotia) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Ontario) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Quebec) 09.12.07 About NERC
Filing of the 2008 Business Plan and Budget for NERC and the Regional Entities (Saskatchewan) 09.12.07 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Alberta) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (British Columbia) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Manitoba) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (National Energy Board) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (New Brunswick) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Nova Scotia) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Ontario) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Quebec) 09.17.08 About NERC
Filing of the 2009 Business Plan and Budget for NERC and the Regional Entities (Saskatchewan) 09.17.08 About NERC
Final Report from the Ad Hoc Group for Generator Requirements at the Transmission Interface 11.16.09 Standards
First Energy Comments 05.29.09 About NERC
First Quarter 08 Entity Quality Performance Indicator 01.05.09 Compliance
First Quarter 09 Entity Quality Performance Indicator 05.11.09 Compliance
First Quarter 2010 Compliance Filing in Response to Order No. 693 06.01.10 About NERC
First Results-based Standard Draft 03.18.10 About NERC
Five Proposed INT Reliability Standards (British Columbia) 05.05.09 About NERC
Five Proposed Reliability Standards (Alberta) 05.13.09 About NERC
Five Proposed Reliability Standards (National Energy Board) 05.05.09 About NERC
Flowgate Methodology 02.10.09 Standards
Forecasts of Interruptible Demands and DCLM Data 11.24.08 Compliance
Formal Interpretation to Reliability Standard TOP-002-2 (Alberta) 05.13.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (British Columbia) 05.05.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (Manitoba) 05.05.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (National Energy Board) 05.05.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (New Brunswick) 05.05.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (Ontario) 05.05.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (Quebec) 05.05.09 About NERC
Formal Interpretation to Reliability Standard TOP-002-2 (Saskatchewan) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (Alberta) 05.13.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (British Columbia) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (Manitoba) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (National Energy Board) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (New Brunswick) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (Ontario) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (Quebec) 05.05.09 About NERC
Formal Interpretation to Reliability Standard VAR-002-1a (Saskatchewan) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Alberta) 05.13.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (British Columbia) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Manitoba) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (National Energy Board) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (New Brunswick) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Ontario) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Quebec) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-001-0, BAL-003-0, and VAR-002-1 (Saskatchewan) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (British Columbia) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (Manitoba) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (National Energy Board) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (New Brunswick) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (Ontario) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (Quebec) 05.05.09 About NERC
Formal Interpretation to Reliability Standards regarding BAL-005-0 (Saskatchewan) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Alberta) 05.13.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (British Columbia) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Manitoba) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (National Energy Board) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (New Brunswick) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Ontario) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Quebec) 05.05.09 About NERC
Formal Interpretations to Reliability Standards regarding TPL-002-0 and TPL-003-0 (Saskatchewan) 05.05.09 About NERC
Fourth Quarter 08 Entity Quality Performance Indicator 01.05.09 Compliance
Fourth Quarter 2009 Compliance Filing in Response to Order No. 693 03.01.10 About NERC
FRCC 2009 Implementation 04.09.09 Compliance
FRCC 2010 Implementation Plan 12.10.09 Compliance
FRCC Comments 05.21.09 About NERC
FRCC Compliance Enforcement Program Audit Report - April 12, 2005 11.23.05 Compliance
FRCC Response to NERC Audit Report 11.23.04 Compliance
Frequency Response and Bias 11.02.09 Compliance
Frequency Response and Bias 10.29.08 Standards
Frequently Asked Questions About NERC Membership 04.10.08 About NERC
Functional Model Technical Document - Version 5 01.15.10 Standards
Functional Model Version 4 and Associated Technical Reference Comments 04.11.08 Standards
Functional Model Version 5 01.15.10 Standards
Further Compliance Filing in Response to Paragraph 18 of the February 21 Order 08.14.08 About NERC
Further Guidance Order on Filing Reliability Notices of Penalty 10.26.09 About NERC
Further Report of NERC in Response to October 15, 2009 Order on Business Plan and Budgets 05.03.10 About NERC
Further Status Report of NERC and WECC in response to P 226 of the March 21, 2008 Order 11.21.08 About NERC
GADS Data Editor - Software User Guide 01.02.10 Assessments & Trends
GADS Data Entry and Edit Program 06.04.10 Assessments & Trends
GADS Data Reporting Contacts 09.02.10 Assessments & Trends
GADS Data Reporting Instructions (Complete Set) 12.03.09 Assessments & Trends
GADS Wind Turbine Generation Data Reporting Instructions 08.09.10 Assessments & Trends
Generating Unit Availability Following Planned Outages 06.01.92 Assessments & Trends
Generating Unit Availability Trends 1984-1988 04.01.90 Assessments & Trends
Generator Operation for Maintaining Network Voltage Schedules 10.29.08 Standards
Generator Operation for Maintaining Network Voltage Schedules 11.02.09 Compliance
Generator Operation for Maintaining Network Voltage Schedules 02.10.09 Standards
Generator Operations for Maintaining Network Voltage Schedules 08.02.06 Standards
GOTO Team Roster 03.13.09 Standards
Guidance for Enforcement of CIP Standards 05.15.08 Standards
Guidance for Enforcement of CIP Standards 05.14.08 Compliance
Guidance Order on Conducting Compliance Audits by the ERO and Regional Entities 01.15.09 About NERC
Guidance Order on Reliability Notices of Penalty 07.03.08 About NERC
Guide to Writing Learning Objectives 01.17.07 Programs
High-Impact, Low-Frequency Event Risk to the North American Bulk Power System 06.02.10 About NERC
High-Impact, Low-Frequency Risk to the North American Bulk Power System 06.02.10 Programs
High-Voltage Transmission Circuit Miles (230kV and above) - 1989-1994 11.07.05 About NERC
High-Voltage Transmission Circuit Miles (230kV and above) - 1995-2004 11.07.05 About NERC
High-Voltage Transmission Circuit Miles (230kV and above) - 2005 02.09.07 About NERC
High-Voltage Transmission Circuit Miles by Voltage (230kV and above) - 2004 11.07.05 About NERC
Hillsborough County, FL, Covanta Hillsborough, Inc. and Hillsborough County Resource Recovery Facility 07.30.07 Compliance
Historic Capacity and Demand 03.04.10 Assessments & Trends
Impact of FGD Systems 07.01.91 Assessments & Trends
Impacts of EPAs Clean Water Act - 316b 11.04.08 Assessments & Trends
Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program 02.02.05 Standards
Implementation of Critical Control Applications 04.14.10 About NERC
Implementation of Interchange 05.02.06 Standards
Implementation of Interchange 11.24.08 Compliance
Implementing Version 3 of the Operating Reliability Data Confidentiality Agreement 05.15.09 About NERC
Inadvertent Interchange 10.29.08 Standards
Inadvertent Interchange 05.02.06 Standards
Inadvertent Interchange 11.02.09 Compliance
Incident Reporting and Response Planning 05.02.06 Standards
Individual Learning Activity Application - Ver 4.3 01.20.10 Programs
Informational Filing in response to Paragraph 629 of Order No. 693 04.30.09 About NERC
Informational Filing of 2