File Type Size Date Description
Acrobat 93 KB 7/26/10 SPP Initial Investigation Report — June 22-23, 2010 — Flowgate TEMP10_16439 — Platte City – Kansas City International 161 kV line for loss of Stranger - Craig 345 kV line
Acrobat 113 KB 7/26/10 SPP Initial Investigation Report — June 20-21, 2010 — Flowgate TEMP10_16439 — Platte City – Kansas City International 161 kV line for loss of Stranger - Craig 345 kV line
Acrobat 98 KB 7/26/10 SPP Initial Investigation Report — June 5, 2010 — Flowgate TEMP01_16413 — Arcadia 345/138 kV Transformer for loss of Arcadia – Northwest 345 kV line
Acrobat 103 KB 7/27/10 SPP Initial Investigation Report — May 23, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 115 KB 7/27/10 SPP Initial Investigation Report — May 22, 2010 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 148 KB 7/27/10 SPP Initial Investigation Report — May 22, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 124 KB 7/27/10 ICTE Initial Investigation Report — May 22, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 151 KB 7/27/10 SPP Initial Investigation Report — May 21, 2010 — Flowgate 15940 — Osage Switch – Canyon East 115 kV for loss of Bushland – Deaf Smith 230 kV
Acrobat 48 KB 7/27/10 ICTE Initial Investigation Report — May 21, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 110 KB 7/27/10 ICTE Initial Investigation Report — May 20, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 108 KB 7/27/10 ICTE Initial Investigation Report — May 19, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 48 KB 7/27/10 ICTE Initial Investigation Report — May 19, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 102 KB 7/27/10 ICTE Initial Investigation Report — May 19, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 105 KB 7/27/10 ICTE Initial Investigation Report — May 19, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 54 KB 7/27/10 ICTE Initial Investigation Report — May 18, 2010 — Flowgate 16373 — McAdams - Pickens 230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 109 KB 7/27/10 ICTE Initial Investigation Report — May 18, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 69 KB 7/27/10 ICTE Initial Investigation Report — May 17, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 75 KB 7/27/10 ICTE Initial Investigation Report — May 16, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 139 KB 7/27/10 SPP Initial Investigation Report — May 16, 2010 — Flowgate 5015 — El Paso – Farber 138 kV for the loss of Wichita - Woodring 345 kV
Acrobat 107 KB 7/27/10 ICTE Initial Investigation Report — May 16, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 122 KB 7/27/10 SPP Initial Investigation Report — May 14, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 119 KB 7/27/10 SPP Initial Investigation Report — May 12, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 84 KB 7/27/10 ICTE Initial Investigation Report — May 11, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 191 KB 7/27/10 SPP Initial Investigation Report — May 10-11, 2010 — Flowgate TEMP03_16364 — Southwest Shreveport – Wallace Lake 138 kV Line for loss of Dolet 345/230 kV Transformer
Acrobat 132 KB 7/27/10 SPP Initial Investigation Report — May 4, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 124 KB 7/27/10 SPP Initial Investigation Report — May 3, 2010 — Flowgate TEMP16_16341 — McElroy – Kinze 138 kV for loss of Sooner – Woodring 345 kV
Acrobat 95 KB 7/27/10 ICTE Initial Investigation Report — May 1, 2010 — Flowgate 1324 — White Bluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 106 KB 7/27/10 ICTE Initial Investigation Report — April 30, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 74 KB 7/27/10 MISO Initial Investigation Report — April 30, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 79 KB 7/27/10 MISO Initial Investigation Report — April 30, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 128 KB 7/27/10 SPP Initial Investigation Report — April 29-30, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 75 KB 7/27/10 MISO Initial Investigation Report — April 29, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 314 KB 7/27/10 SPP Initial Investigation Report — April 28-29, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 113 KB 7/27/10 SPP Initial Investigation Report — April 28, 2010 — Flowgate 16332 — McElroy – Kinze 138 kV line for the loss of Sooner – Spring Creek 345 kV line
Acrobat 110 KB 7/27/10 SPP Initial Investigation Report — April 27, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 74 KB 7/27/10 MISO Initial Investigation Report — April 27, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 174 KB 7/27/10 SPP Initial Investigation Report — April 26-27, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 134 KB 7/27/10 SPP Initial Investigation Report — April 23, 2010 — Flowgate 16329 — Five Tribes - Hancock 161 kV for the loss of Muskogee – Ft. Smith 345 kV
Acrobat 121 KB 7/27/10 SPP Initial Investigation Report — April 23, 2010 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 57 KB 7/27/10 ICTE Initial Investigation Report — April 19, 2010 — Flowgate 1330 — McAdams 500 - 230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 104 KB 7/27/10 SPP Initial Investigation Report — April 16, 2010 — Flowgate 16316 — Cherry Creek – Boyd 138 kV for the loss of Pleasant Valley – Hollywood 138 kV
Acrobat 75 KB 7/27/10 MISO Initial Investigation Report — April 16, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 127 KB 7/27/10 SPP Initial Investigation Report — April 16, 2010 — Flowgate 5211 — Lone Oak – Sardis 138 kV for loss of Pittsburg – Valliant 345 kV
Acrobat 144 KB 7/27/10 SPP Initial Investigation Report — April 15, 2010 — Flowgate 16316 — Cherry Creek – Boyd 138 kV for the loss of Pleasant Valley – Hollywood 138 kV
Acrobat 140 KB 7/27/10 SPP Initial Investigation Report — April 13-14, 2010 — Flowgate 5003 — Broken Bow – Bethel Tap 138 kV for loss of Valliant - Pittsburg 345 kV
Acrobat 49 KB 7/27/10 ICTE Initial Investigation Report — April 13, 2010 — Flowgate 16314 — Mabelvale - Bryant 115 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 123 KB 7/27/10 MISO Initial Investigation Report — April 13, 2010 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 364 KB 7/27/10 SPP Initial Investigation Report — April 12 and 15, 2010 — Flowgate 5211 — Lone Oak – Sardis 138 kV for loss of Pittsburg – Valliant 345 kV
Acrobat 125 KB 7/27/10 MISO Initial Investigation Report — April 12-13, 2010 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 79 KB 7/27/10 MISO Initial Investigation Report — April 12, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 79 KB 7/27/10 MISO Initial Investigation Report — April 11, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 321 KB 7/27/10 SPP Initial Investigation Report — April 10, 2010 — Flowgate 5196 — SPS North - South
Acrobat 83 KB 7/27/10 MISO Initial Investigation Report — April 9, 2010 — Flowgate 6061 — R50M 230kV
Acrobat 84 KB 7/27/10 MISO Initial Investigation Report — April 9, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 76 KB 7/27/10 ICTE Initial Investigation Report — April 9, 2010 — Flowgate 1347 — Wilbert - Livonia 138kV for the loss of Webre-Wells 500kV
Acrobat 41 KB 7/27/10 ICTE Initial Investigation Report — April 6, 2010 — Flowgate 16288 — Marshall - Botkinburg (aecc) 161 kV for the loss of Dardanelle Dam - Russellville South 161 kV
Acrobat 120 KB 7/27/10 SPP Initial Investigation Report — April 6, 2010 — Flowgate 5211 — Lone Oak – Sardis 138 kV for loss of Pittsburg – Valliant 345 kV
Acrobat 383 KB 7/27/10 SPP Initial Investigation Report — April 5-7, 2010 — Flowgate 5196 — SPS North - South
Acrobat 157 KB 7/27/10 SPP Initial Investigation Report — April 4-5, 2010 — Flowgate 5368 — Kress – Hale Co. 115 kV for loss of Swisher – Tuco 230 kV
Acrobat 77 KB 7/27/10 MISO Initial Investigation Report — April 5, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 192 KB 7/27/10 SPP Initial Investigation Report — April 3-4, 2010 — Flowgate 5354 — Randall – Palo Duro 115 kV for loss of Amarillo – Swisher 230 kV
Acrobat 285 KB 7/27/10 SPP Initial Investigation Report — April 1-2, 2010 — Flowgate 5354 — Randall – Palo Duro 115 kV for loss of Amarillo – Swisher 230 kV
Acrobat 306 KB 4/15/10 SPP Initial Investigation Report — March 27-28, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 43 KB 7/27/10 ICTE Initial Investigation Report — March 23, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 223 KB 4/15/10 SPP Initial Investigation Report — March 17, 2010 — Flowgate 6009 — COOPER_S
Acrobat 141 KB 4/15/10 SPP Initial Investigation Report — March 9, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV
Acrobat 81 KB 4/15/10 SPP Initial Investigation Report — March 4, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface
Acrobat 140 KB 4/15/10 SPP Initial Investigation Report — February 24, 2010 — Flowgate 16178 — Dyess – East Rogers 161 kV for the loss of Tontitown – Lowell 161 kV
Acrobat 69 KB 7/27/10 ICTE Initial Investigation Report — February 12, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 105 KB 4/15/10 SPP Initial Investigation Report — February 3, 2010 — Flowgate 16203 — Jenson Tap – Jenson Road 138 kV for the loss of Sunnyside – Lawton East 345 kV
Acrobat 129 KB 4/15/10 SPP Initial Investigation Report — December 19, 2009 — Flowgate 16129 — Ft. Smith - Arkhoma 161 kV for the loss of AES – Tarby 161 kV
Acrobat 163 KB 4/15/10 SPP Initial Investigation Report — December 21, 2009 — Flowgate 16087 — WR North Interface
Acrobat 108 KB 4/15/10 SPP Initial Investigation Report — January 10, 2010 — Flowgate 16147 — Neosho – Columbus 161 kV for the loss of Northeast Coal – Oneta 345 kV
Acrobat 335 KB 4/15/10 SPP Initial Investigation Report — December 10, 2009 — Flowgate 5029 — Mansfield – Int. Paper 138 kV for the loss of Dolet Hills – SW Shreveport 345 kV(ManIpmDolSws)
Acrobat 120 KB 4/15/10 SPP Initial Investigation Report — December 24, 2009 — Flowgate 5358 — Anadarko – Cornville Tap 138 kV for loss of Southwestern Station – Norge 138 kV(ANACORSWSNOR)
Acrobat 109 KB 4/15/10 SPP Initial Investigation Report — December 15, 2009 — Flowgate 16118 — McElroy - Kinze 138 kV for the loss of Sooner – Spring Creek 345 kV
Acrobat 111 KB 4/15/10 SPP Initial Investigation Report — February 22, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV(LAKALAIATSTR)
Acrobat 134 KB 4/15/10 SPP Initial Investigation Report — January 24, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV(LAKALAIATSTR)
Acrobat 216 KB 4/15/10 SPP Initial Investigation Report — January 16, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV(LAKALAIATSTR)
Acrobat 107 KB 4/15/10 SPP Initial Investigation Report — December 27, 2009 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 121 KB 4/15/10 SPP Initial Investigation Report — December 25, 2009 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 111 KB 4/15/10 SPP Initial Investigation Report — December 24, 2009 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV
Acrobat 159 KB 4/15/10 SPP Initial Investigation Report — January 10, 2010 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 159 KB 4/15/10 SPP Initial Investigation Report — December 27-28, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 209 KB 4/15/10 SPP Initial Investigation Report — December 25-26, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 75 KB 4/15/10 SPP Initial Investigation Report — December 24, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 134 KB 4/15/10 SPP Initial Investigation Report — December 4-5, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV
Acrobat 113 KB 4/15/10 SPP Initial Investigation Report — February 25, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface
Acrobat 138 KB 4/15/10 SPP Initial Investigation Report — February 18-19, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface
Acrobat 138 KB 4/15/10 SPP Initial Investigation Report — February 16-17, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface
Acrobat 88 KB 4/15/10 MISO Initial Investigation Report — March 31, 2010 — Flowgate 6002 — MHEX_S Interface
Acrobat 141 KB 4/15/10 MISO Initial Investigation Report — March 1-2, 2010 — Flowgate 16230 — Lewis and Clark - Dawson County 115kV (flo) Belfield – Medora - Dawson County 230kV + SPS Flowgate
Acrobat 103 KB 4/15/10 MISO Initial Investigation Report — February 11, 2010 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 73 KB 4/15/10 MISO Initial Investigation Report — December 15, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 74 KB 4/15/10 MISO Initial Investigation Report — December 9, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 74 KB 4/15/10 MISO Initial Investigation Report — December 9, 2009 — Flowgate 16109 — Leland Olds-Logan 230kV
Acrobat 85 KB 4/15/10 MISO Initial Investigation Report — December 9, 2009 — Flowgate 6003 — MHEX_N Interface
Acrobat 74 KB 4/15/10 ICTE Initial Investigation Report — October 8, 2009 — Flowgate 1330 — McAdams 500/230 for the loss of McAdams-Lakeover
Acrobat 44 KB 1/27/10 ICTE Initial Investigation Report — October 30, 2009 — Flowgate 1326 — Mabelvale-Sheridan for the loss of WhiteBluff-Sheridan
Acrobat 41 KB 1/27/10 ICTE Initial Investigation Report — December 24, 2009 — Flowgate 1309 — Terrebonne - Greenwood 115 kV for the loss of Webre - Wells 500 kV
Acrobat 49 KB 1/27/10 ICTE Initial Investigation Report — December 5, 2009 — Flowgate 1388 — Mt Olive - Hartburg 500 kV for the loss of Webre - Wells 500 kV
Acrobat 44 KB 1/27/10 ICTE Initial Investigation Report — December 10, 2009 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV
Acrobat 43 KB 1/27/10 ICTE Initial Investigation Report — August 12, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 45 KB 1/27/10 ICTE Initial Investigation Report — October 14, 2009 — Flowgate 16031 — Mt Olive - Hartburg 500 kV for the loss of McKnight - Coly 500 kV
Acrobat 38 KB 1/27/10 ICTE Initial Investigation Report — October 12, 2009 — Flowgate 16031 — Mt Olive - Hartburg 500 kV for the loss of McKnight - Coly 500 kV
Acrobat 46 KB 1/27/10 ICTE Initial Investigation Report — October 31, 2009 — Flowgate 1324 — White Bluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 54 KB 1/27/10 ICTE Initial Investigation Report — December 26, 2009 — Flowgate 1324 — White Bluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV
Acrobat 40 KB 1/27/10 ICTE Initial Investigation Report — October 22, 2009 — Flowgate 1902 — Scott-Bonin 138 kV for the loss of T J Labbe-Bonin 230 kV
Acrobat 40 KB 1/27/10 ICTE Initial Investigation Report — October 6, 2009 — Flowgate 1902 — Scott-Bonin 138 kV for the loss of T J Labbe-Bonin 230 kV
Acrobat 41 KB 1/27/10 ICTE Initial Investigation Report — October 14, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 45 KB 1/27/10 ICTE Initial Investigation Report — October 5, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 38 KB 1/27/10 ICTE Initial Investigation Report — August 18, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 38 KB 1/27/10 ICTE Initial Investigation Report — August 25, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 42 KB 1/27/10 ICTE Initial Investigation Report — August 28, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 56 KB 1/27/10 MISO Initial Investigation Report — October 13, 2009 — Flowgate 6072 — Letellier-Drayton 230kV PTDF
Acrobat 59 KB 1/27/10 MISO Initial Investigation Report — October 11, 2009 — Flowgate 6072 — Letellier-Drayton 230kV PTDF
Acrobat 44 KB 1/27/10 MISO Initial Investigation Report — October 26, 2009 — Flowgate 6160 — Laverendrye-Letellier 230kV flo Dorsey-St Leon 230kV Interface
Acrobat 71 KB 1/27/10 MISO Initial Investigation Report — October 28, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 52 KB 1/27/10 MISO Initial Investigation Report — October 26, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 297 KB 11/20/09 SPP Initial Investigation Report — October 18, 2009 — Flowgate 6009 — COOPER_S
Acrobat 141 KB 11/20/09 SPP Initial Investigation Report — September 21, 2009 — Flowgate 15940 — Osage Switch – Canyon East 115 kV for loss of Bushland – Deaf Smith 230 kV
Acrobat 100 KB 11/20/09 SPP Initial Investigation Report — October 7, 2009 — Flowgate 16019 — Redbud – Arcadia 345 kV CKT 2
Acrobat 120 KB 11/20/09 SPP Initial Investigation Report — October 9, 2009 — Flowgate 5196 — SPS North - South
Acrobat 127 KB 11/20/09 SPP Initial Investigation Report — September 27, 2009 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV
Acrobat 112 KB 11/20/09 SPP Initial Investigation Report — September 21, 2009 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 86 KB 11/20/09 SPP Initial Investigation Report — October 9, 2009 — Flowgate 5014 — Elk City 230/138 kV Transformer for the loss of Tuco – Oklaunion 345 kV Line
Acrobat 119 KB 11/20/09 SPP Initial Investigation Report — October 7, 2009 — Flowgate 5014 — Elk City 230/138 kV Transformer for the loss of Tuco – Oklaunion 345 kV Line
Acrobat 49 KB 11/20/09 MISO Initial Investigation Report — September 27, 2009 — Flowgate 6061 — Richer-Moranville 230kV (R50M)
Acrobat 50 KB 11/20/09 MISO Initial Investigation Report — September 30, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 51 KB 11/20/09 MISO Initial Investigation Report — September 28, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 47 KB 11/20/09 MISO Initial Investigation Report — September 25, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 49 KB 11/20/09 MISO Initial Investigation Report — October 1, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 44 KB 10/28/09 ICTE Initial Investigation Report — August 20, 2009 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Weber- Wells 500 kV
Acrobat 34 KB 10/28/09 ICTE Initial Investigation Report — August 6, 2009 — Flowgate 1911 — Hartburg-Inland Orange 230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 37 KB 10/28/09 ICTE Initial Investigation Report — August 20, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 40 KB 10/28/09 ICTE Initial Investigation Report — August 14, 2009 — Flowgate 15008 — Nelson XF 500/230 for the loss of Cypress-Hartburg 500 kV
Acrobat 43 KB 10/28/09 ICTE Initial Investigation Report — August 15, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 47 KB 10/28/09 ICTE Initial Investigation Report — August 14, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 43 KB 10/28/09 ICTE Initial Investigation Report — August 13, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 43 KB 10/28/09 ICTE Initial Investigation Report — August 11, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 44 KB 10/28/09 ICTE Initial Investigation Report — August 10, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 44 KB 10/28/09 ICTE Initial Investigation Report — August 7, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 42 KB 10/28/09 ICTE Initial Investigation Report — August 6, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 43 KB 10/28/09 ICTE Initial Investigation Report — August 5, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 43 KB 10/28/09 ICTE Initial Investigation Report — August 4, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 38 KB 10/28/09 ICTE Initial Investigation Report — August 3, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 123 KB 10/07/09 SPP Initial Investigation Report — August 30, 2009 — Flowgate 15940 — Osage Switch – Canyon East 115 kV for loss of Bushland – Deaf Smith 230 kV
Acrobat 113 KB 10/07/09 SPP Initial Investigation Report — August 26, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2
Acrobat 106 KB 10/07/09 SPP Initial Investigation Report — August 30, 2009 — Flowgate 5242 — Okmulgee – Henryetta 138 kV for loss of Okmulgee – Kelco 138 kV
Acrobat 198 KB 10/07/09 SPP Initial Investigation Report — August 8, 2009 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV
Acrobat 105 KB 10/07/09 SPP Initial Investigation Report — August 6, 2009 — Flowgate 5290 — Powell – Linwood 138 kV for loss of SW Shreveport – Western Electric 138 kV
Acrobat 80 KB 10/07/09 SPP Initial Investigation Report — August 27, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV
Acrobat 76 KB 10/07/09 SPP Initial Investigation Report — August 26, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV
Acrobat 104 KB 10/07/09 SPP Initial Investigation Report — August 25, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV
Acrobat 109 KB 10/07/09 SPP Initial Investigation Report — August 12, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV
Acrobat 102 KB 10/07/09 SPP Initial Investigation Report — August 7, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 177 KB 10/07/09 SPP Initial Investigation Report — August 5-7, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 108 KB 10/07/09 SPP Initial Investigation Report — August 5, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 91 KB 10/07/09 SPP Initial Investigation Report — August 1, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 43 KB 10/07/09 ICTE Initial Investigation Report — July 5, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 43 KB 10/07/09 ICTE Initial Investigation Report — July 6, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 78 KB 10/07/09 ICTE Initial Investigation Report — July 1, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 41 KB 10/07/09 ICTE Initial Investigation Report — July 3, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 41 KB 10/07/09 ICTE Initial Investigation Report — July 4, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 47 KB 10/07/09 MISO Initial Investigation Report — August 23, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 45 KB 10/07/09 MISO Initial Investigation Report — July 30, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 117 KB 10/07/09 SPP Initial Investigation Report — July 2, 2009 — Flowgate 5242 — Okmulgee – Henryetta 138 kV for loss of Okmulgee – Kelco 138 kV
Acrobat 125 KB 10/07/09 SPP Initial Investigation Report — July 2, 2009 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 104 KB 10/07/09 SPP Initial Investigation Report — July 20, 2009 — Flowgate 15911 — Arcadia 345/138 kV Transformer for loss of Arcadia – Northwestern 345 kV
Acrobat 89 KB 10/07/09 SPP Initial Investigation Report — June 11, 2009 — Flowgate 15844 — Temp 04 Roosevelt – Oasis 230 kV for the loss of Tolksub – Eddy County 345 kV
Acrobat 91 KB 10/07/09 SPP Initial Investigation Report — June 23, 2009 — Flowgate 15882 — Longwood – Noram 138 kV for the loss of Longwood – Lieberman 138 kV
Acrobat 133 KB 10/07/09 SPP Initial Investigation Report — June 17-18, 2009 — Flowgate 15826 — Temp 10 Summit – Exide Jct. 115 kV for the loss of Summit – E. McPherson 230 kV
Acrobat 140 KB 10/07/09 SPP Initial Investigation Report — June 2, 2009 — Flowgate 5014 — Elk City 230/138 kV Transformer for the loss of Tuco – Oklaunion 345 kV Line
Acrobat 212 KB 10/07/09 SPP Initial Investigation Report — July 30-31, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 108 KB 10/07/09 SPP Initial Investigation Report — July 25, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 116 KB 10/07/09 SPP Initial Investigation Report — June 5, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 245 KB 10/07/09 SPP Initial Investigation Report — June 3, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 345 KB 10/07/09 SPP Initial Investigation Report — July 26, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 322 KB 10/07/09 SPP Initial Investigation Report — July 24-25, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 313 KB 10/07/09 SPP Initial Investigation Report — July 14-16, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 337 KB 10/07/09 SPP Initial Investigation Report — July 16-17, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 168 KB 10/07/09 SPP Initial Investigation Report — July 13, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 164 KB 10/07/09 SPP Initial Investigation Report — July 09, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 396 KB 10/07/09 SPP Initial Investigation Report — July 11-12, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 188 KB 10/07/09 SPP Initial Investigation Report — July 7, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV
Acrobat 100 KB 10/07/09 SPP Initial Investigation Report — June 2, 2009 — Flowgate 15776 — Temp 08 Sooner 345/138 kV Transformer for the loss of Sooner – Woodring 345kV
Acrobat 130 KB 10/07/09 SPP Initial Investigation Report — June 1, 2009 — Flowgate 15776 — Temp 08 Sooner 345/138 kV Transformer for the loss of Sooner – Woodring 345kV
Acrobat 122 KB 10/07/09 SPP Initial Investigation Report — June 4, 2009 — Flowgate 15812 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 121 KB 10/07/09 SPP Initial Investigation Report — June 2, 2009 — Flowgate 15812 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 110 KB 10/07/09 SPP Initial Investigation Report — June 1, 2009 — Flowgate 15812 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 113 KB 10/07/09 SPP Initial Investigation Report — July 9-10, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 137 KB 10/07/09 SPP Initial Investigation Report — July 21-22, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 102 KB 10/07/09 SPP Initial Investigation Report — July 21, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 187 KB 10/07/09 SPP Initial Investigation Report — July 19-20, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 218 KB 10/07/09 SPP Initial Investigation Report — July 16-17, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 152 KB 10/07/09 SPP Initial Investigation Report — July 14-15, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 101 KB 10/07/09 SPP Initial Investigation Report — July 14, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 111 KB 10/07/09 SPP Initial Investigation Report — July 13, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 184 KB 10/07/09 SPP Initial Investigation Report — July 11-12, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 121 KB 10/07/09 SPP Initial Investigation Report — July 10, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2
Acrobat 113 KB 10/07/09 SPP Initial Investigation Report — July 6, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2
Acrobat 104 KB 10/07/09 SPP Initial Investigation Report — July 1, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2
Acrobat 125 KB 10/07/09 SPP Initial Investigation Report — June 14, 2009 — Flowgate 15857 — Northwestern – Cimarron 345 kV for the loss of Woodring – Cimarron 345 kV
Acrobat 264 KB 10/07/09 ICTE Initial Investigation Report — June 14, 2009 — Flowgate 1938 — Sheridan-El Dorado 500 kV for the loss of Etta-McNeil 500 kV
Acrobat 11 KB 10/07/09 ICTE Initial Investigation Report — July 14, 2009 — Flowgate 1911 — Hartburg-Inland Orange 230 kV for the loss of Hartburg-Cypress 500 kV
Acrobat 64 KB 10/07/09 ICTE Initial Investigation Report — June 19, 2009 — Flowgate 1903 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 66 KB 10/07/09 ICTE Initial Investigation Report — June 20, 2009 — Flowgate 1903 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 37 KB 10/07/09 ICTE Initial Investigation Report — July 21, 2009 — Flowgate 1903 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 69 KB 10/07/09 ICTE Initial Investigation Report — June 26, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 44 KB 10/07/09 ICTE Initial Investigation Report — July 20, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 41 KB 10/07/09 ICTE Initial Investigation Report — July 2, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 34 KB 10/07/09 ICTE Initial Investigation Report — July 15, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 61 KB 10/07/09 ICTE Initial Investigation Report — July 10, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 44 KB 10/07/09 ICTE Initial Investigation Report — July 13, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV
Acrobat 37 KB 10/07/09 ICTE Initial Investigation Report — July 20, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 48 KB 10/07/09 ICTE Initial Investigation Report — July 14, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 46 KB 10/07/09 ICTE Initial Investigation Report — July 13, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 47 KB 10/07/09 ICTE Initial Investigation Report — July 11, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 41 KB 10/07/09 ICTE Initial Investigation Report — July 10, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 42 KB 10/07/09 ICTE Initial Investigation Report — July 24, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 40 KB 10/07/09 ICTE Initial Investigation Report — July 25, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 39 KB 10/07/09 ICTE Initial Investigation Report — July 27, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 37 KB 10/07/09 ICTE Initial Investigation Report — July 28, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 44 KB 10/07/09 ICTE Initial Investigation Report — July 29, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 42 KB 10/07/09 ICTE Initial Investigation Report — July 30, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 41 KB 10/07/09 ICTE Initial Investigation Report — July 9, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 41 KB 10/07/09 ICTE Initial Investigation Report — July 8, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 44 KB 10/07/09 ICTE Initial Investigation Report — July 2, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 80 KB 10/07/09 ICTE Initial Investigation Report — June 21, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 81 KB 10/07/09 ICTE Initial Investigation Report — June 30, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 83 KB 10/07/09 ICTE Initial Investigation Report — June 29, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 87 KB 10/07/09 ICTE Initial Investigation Report — June 26, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 88 KB 10/07/09 ICTE Initial Investigation Report — June 25, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 94 KB 10/07/09 ICTE Initial Investigation Report — June 24, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 84 KB 10/07/09 ICTE Initial Investigation Report — June 23, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 93 KB 10/07/09 ICTE Initial Investigation Report — June 22, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 126 KB 10/07/09 ICTE Initial Investigation Report — May 2, 2009 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta - McNeil 500 kV
Acrobat 170 KB 10/07/09 ICTE Initial Investigation Report — May 10, 2009 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta - McNeil 500 kV
Acrobat 77 KB 10/07/09 ICTE Initial Investigation Report — May 6, 2009 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells - Pont Des Mouton 230 kV
Acrobat 115 KB 10/07/09 ICTE Initial Investigation Report — May 12, 2009 — Flowgate 1968 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV
Acrobat 47 KB 10/07/09 MISO Initial Investigation Report — July 18, 2009 — Flowgate 6072 — Letellier-Drayton 230kV (L20D) Interface Proxy for Drayton TR1 for the loss of Drayton TR2 230/115kV
Acrobat 53 KB 10/07/09 MISO Initial Investigation Report — June 27, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV
Acrobat 181 KB 07/24/09 SPP Initial Investigation Report — May 17, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 141 KB 07/24/09 SPP Initial Investigation Report — May 18-19, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 136 KB 07/24/09 SPP Initial Investigation Report — May 16, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 118 KB 07/24/09 SPP Initial Investigation Report — May 15, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 210 KB 07/24/09 SPP Initial Investigation Report — May 12-14, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 427 KB 07/24/09 SPP Initial Investigation Report — May 19, 2009 — Flowgate 15622 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 221 KB 07/24/09 SPP Initial Investigation Report — May 30, 2009 — Flowgate 15815 — Temp 6 Woodring 345/138 kV Transformer for the loss of Woodring – Cimarron 345 kV line
Acrobat 111 KB 07/24/09 SPP Initial Investigation Report — May 28, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2
Acrobat 127 KB 07/24/09 SPP Initial Investigation Report — May 30, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2
Acrobat 115 KB 07/24/09 SPP Initial Investigation Report — May 26, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2
Acrobat 121 KB 07/24/09 SPP Initial Investigation Report — May 29, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2
Acrobat 88 KB 07/24/09 SPP Initial Investigation Report — May 7, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV
Acrobat 273 KB 07/24/09 SPP Initial Investigation Report — May 28-29, 2009 — Flowgate 15815 — Temp 6 Woodring 345/138 kV Transformer for the loss of Woodring – Cimarron 345 kV line
Acrobat 121 KB 07/24/09 SPP Initial Investigation Report — May 29, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2
Acrobat 116 KB 07/24/09 SPP Initial Investigation Report — May 28, 2009 — Flowgate 15776 — Temp 08 Sooner 345/138 kV Transformer for the loss of Sooner – Woodring 345kV
Acrobat 115 KB 07/24/09 ICTE Initial Investigation Report — May 12, 2009 — Flowgate 1968 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV
Acrobat 170 KB 07/24/09 ICTE Initial Investigation Report — May 10, 2009 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta - McNeil 500 kV
Acrobat 49 KB 07/24/09 MISO Initial Investigation Report — June 23, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV
Acrobat 52 KB 07/24/09 MISO Initial Investigation Report — June 22, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV
Acrobat 52 KB 07/24/09 MISO Initial Investigation Report — June 21, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV
Acrobat 47 KB 07/24/09 MISO Initial Investigation Report — June 19, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV
Acrobat 57 KB 07/24/09 MISO Initial Investigation Report — June 18, 2009 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 56 KB 07/24/09 MISO Initial Investigation Report — June 17, 2009 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 45 KB 07/24/09 MISO Initial Investigation Report — June 11, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 47KB 07/24/09 MISO Initial Investigation Report — May 31, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 58 KB 07/24/09 MISO Initial Investigation Report — May 29, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 43 KB 06/23/09 MISO Initial Investigation Report — May 9, 2009 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 45 KB 06/23/09 MISO Initial Investigation Report — May 20, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 42 KB 06/23/09 MISO Initial Investigation Report — May 8, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 121 KB 06/23/09 ICTE Initial Investigation Report — June 11, 2009 — Flowgate 1968 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV
Acrobat 68 KB 06/23/09 ICTE Initial Investigation Report — April 25, 2009 — Flowgate 15732 — Willow Glen 500/230 AT2 for the loss of Willow Glen-Waterford 500 kV
Acrobat 485 KB 06/23/09 ICTE Initial Investigation Report — April 22, 2009 — Flowgate 1948 — Paragould - Monette Junction 161 kV for the loss of Independence - Dell 500 kV
Acrobat 218 KB 06/23/09 ICTE Initial Investigation Report 2 — April 20, 2009 — Flowgate 1948 — Paragould - Monette Junction 161 kV for the loss of Independence - Dell 500 kV
Acrobat 208 KB 06/23/09 ICTE Initial Investigation Report 2 — April 20, 2009 — Flowgate 1345 — Mabelvale - Bryant 115 kV for the loss of Sheridan - El Dorado 500 kV
Acrobat 60 KB 06/23/09 ICTE Initial Investigation Report 1 — April 20, 2009 — Flowgate 1345 — Mabelvale - Bryant 115 kV for the loss of Sheridan - El Dorado 500 kV
Acrobat 46 KB 06/01/09 ICTE Initial Investigation Report — March 14, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV
Acrobat 46 KB 06/01/09 ICTE Initial Investigation Report — March 11, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV
Acrobat 46 KB 06/01/09 ICTE Initial Investigation Report — March 10, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV
Acrobat 46 KB 06/01/09 ICTE Initial Investigation Report — March 12, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — March 12, 2009 — Flowgate 15679 — Longwood 345:138 kV XF for the loss of SW Shreveport 345:138 kV XF
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — April 23, 2009 — Flowgate 15622 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — January 29, 2009 — Flowgate 15575 — Pecan Creek – Five Tribes 161 kV for the Loss of Pecan Creek – Agency 161kV Line
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — February 1, 2009 — Flowgate 15369 — Plant X – Sundown 230 kV Line for the Loss of Tolk – Yoakum 230 kV Line
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — March 3, 2009 — Flowgate 15553 — Flint Creek-Decatur 161 kV for the loss of Flint Creek-Brookline 345 kV
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — January 28, 2009 — Flowgate 5247 — SPPSPSTIES
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — March 2, 2009 — Flowgate 5073 — Bartlesville SE – N. Bartlesville 138 kV Line for loss of Northeastern – Delaware 345 kV
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — January 7, 2009 — Flowgate 15524 — Pecan 161/138 kV Transformer for the Loss of Sand Springs – Prattville 138 kV Line
Acrobat 46 KB 06/01/09 SPP Initial Investigation Report — February 2, 2009 — Flowgate 15613 — Sikeston – Idalia 161 kV Line for the Loss of New Madrid – Tipton 161 kV Line
Acrobat 46 KB 06/01/09 MISO Initial Investigation Report — April 19, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 46 KB 06/01/09 MISO Initial Investigation Report — April 13, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 46 KB 04/27/09 MISO Initial Investigation Report — March 26, 2009 — Flowgate 6100 — MHEB_SPC_W Interface
Acrobat 49 KB 04/27/09 MISO Initial Investigation Report — April 5, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 46 KB 04/27/09 MISO Initial Investigation Report — January 27, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 64 KB 04/27/09 ICTE Initial Investigation Report — March 3, 2009 — Flowgate 1941 — Greenbrier - Quitman 161 kV for the loss of Pleasant Hills - Mayflower 500 kV
Acrobat 75 KB 04/27/09 ICTE Initial Investigation Report — March 3, 2009 — Flowgate 1355 — Little Gypsy - Fairview 230 kV for the loss of McKnight - Franklin 500 kV
Acrobat 105 KB 03/09/09 ICTE Initial Investigation Report — January 29, 2009 — Flowgate 15565 — Quitman - Heber Springs 161 kV for the loss of Newport - Newport Industrial 161 kV
Acrobat 44 KB 03/09/09 ICTE Initial Investigation Report — February 17, 2009 — Flowgate 1962 — Nelson - Lake Charles Bulk 138 kV for the loss of Nelson - Richard 500 kV
Acrobat 76 KB 03/09/09 ICTE Initial Investigation Report — January 16, 2009 — Flowgate 15544 — Sheridan - Mabelvale 500 kV for the loss of White Bluff - Keo 500 kV
Acrobat 46 KB 03/09/09 MISO Initial Investigation Report — January 21, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 46 KB 03/09/09 MISO Initial Investigation Report — January 26, 2009 — Flowgate 6002 — MHEX_S Interface
Acrobat 60 KB 03/09/09 MISO Initial Investigation Report — January 08, 2009 — Flowgate 6190 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV
Acrobat 133 KB 02/05/09 SPP Initial Investigation Report — December 17, 2008 — Flowgate 5078 — S. Coffeyville – Dearing 138 kV for the loss of Delaware – Neosho 345 kV
Acrobat 106 KB 02/05/09 SPP Initial Investigation Report — November 14, 2008 — Flowgate 15437 — Flint Creek – Chambers 161kV for loss of Flint Creek – S. Springs 161kV
Acrobat 626 KB 02/05/09 SPP Initial Investigation Report — November 27-December 1, 2008 — Flowgate 15369 — Plant X – Sundown 230kV for loss of Tolk – Yoakum 230kV
Acrobat 140 KB 02/05/09 SPP Initial Investigation Report — December 7, 2008 — Flowgate 15337 — Kress – Hale Co. 115kV for loss of Swisher – Tuco 230kV
Acrobat 304 KB 02/05/09 SPP Initial Investigation Report — November 29-30, 2008 — Flowgate 15337 — Kress – Hale Co. 115kV for loss of Swisher – Tuco 230kV
Acrobat 201 KB 02/05/09 SPP Initial Investigation Report — November 18, 2008 — Flowgate 15431 — Dyess – East Rogers 161kV for loss of Lowell – Tontitown 161kV
Acrobat 150 KB 02/05/09 SPP Initial Investigation Report — November 10, 2008 — Flowgate 15431 — Dyess – East Rogers 161kV for loss of Lowell – Tontitown 161kV
Acrobat 138 KB 02/05/09 SPP Initial Investigation Report — November 5, 2008 — Flowgate 5203 — N. American Philips – W. McPherson 115 kV for loss of E. McPherson – Summit 230 kV
Acrobat 430 KB 02/05/09 SPP Initial Investigation Report — November 9, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 154 KB 02/05/09 SPP Initial Investigation Report — November 5, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 181 KB 02/05/09 SPP Initial Investigation Report — November 3, 2008 — Flowgate 5203 — N. American Philips – W. McPherson 115 kV for loss of E. McPherson – Summit 230 kV
Acrobat 192 KB 02/05/09 SPP Initial Investigation Report — November 4, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 253 KB 02/05/09 SPP Initial Investigation Report — November 14, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 253 KB 02/05/09 SPP Initial Investigation Report — November 25, 2008 — Flowgate 15369 — Plant X – Sundown 230kV for loss of Tolk – Yoakum 230kV
Acrobat 301 KB 02/05/09 SPP Initial Investigation Report — December 13-14, 2008 — Flowgate 15369 — Plant X – Sundown 230kV for loss of Tolk – Yoakum 230kV
Acrobat 50 KB 02/05/09 MISO Initial Investigation Report — January 03, 2009 — Flowgate 3766 — Dundee-Hazelton 161kV flo Arnold-Hazelton 345kV
Acrobat 107 KB 01/23/09 ICTE Initial Investigation Report — January 15, 2009 — Flowgate 15544 — Sheridan=Mabelvale 500 kV for the loss of White Bluff-Keo 500 kV
Acrobat 72 KB 01/23/09 ICTE Initial Investigation Report — January 11, 2009 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV
Acrobat 68 KB 01/23/09 ICTE Initial Investigation Report — December 10, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV
Acrobat 183 KB 01/23/09 ICTE Initial Investigation Report — December 15, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV
Acrobat 93 KB 01/23/09 ICTE Initial Investigation Report — December 21, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV
Acrobat 70 KB 01/23/09 ICTE Initial Investigation Report — December 29, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV
Acrobat 71 KB 01/23/09 ICTE Initial Investigation Report — December 23, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV
Acrobat 128 KB 01/23/09 ICTE Initial Investigation Report — December 10, 2008 — Flowgate 1309 — Terrebonne - Greenwood 115 kV for the loss of Webre-Wells 500 kV
Acrobat 53 KB 01/23/09 ICTE Initial Investigation Report — December 11, 2008 — Flowgate 14870 — Fancy Auto 500/230 kV for the loss of Big Cajun 2 - Webre 500 kV
Acrobat 58 KB 01/23/09 ICTE Initial Investigation Report — December 05, 2008 — Flowgate 1911 — Hartburg - Inland Orange 230 kV for the loss of Hartburg - Cypress 500 kV
Acrobat 57 KB 01/23/09 MISO Initial Investigation Report — December 21, 2008 — Flowgate 6190 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV
Acrobat 53 KB 01/23/09 MISO Initial Investigation Report — December 10, 2008 — Flowgate 6126 — Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV
Acrobat 54 KB 12/17/08 MISO Initial Investigation Report — November 5, 2008 — Flowgate 6009 — Cooper South Interface
Acrobat 67 KB 12/17/08 ICTE Initial Investigation Report — November 17, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for loss of Webre-Wells 500 kV
Acrobat 65 KB 12/17/08 ICTE Initial Investigation Report — November 21, 2008 — Flowgate 15451 — ANO 500/161 Xfmr for loss of ANO-Mabelvale 500 kV
Acrobat 61 KB 12/17/08 ICTE Initial Investigation Report — December 2, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV
Acrobat 100 KB 12/17/08 ICTE Initial Investigation Report — October 18, 2008 — Flowgate 1938 — Sheridan-El Dorado 500 kV for the loss of Etta-McNeil 500 kV
Acrobat 96 KB 12/17/08 ICTE Initial Investigation Report — November 6, 2008 — Flowgate 1347 — Mt. Olive – Hartburg 500 kV for the loss of Webre-Wells 500 kV
Acrobat 88 KB 12/17/08 ICTE Initial Investigation Report — November 11, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV
Acrobat 74 KB 12/17/08 ICTE Initial Investigation Report — November 12, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV
Acrobat 64 KB 12/17/08 ICTE Initial Investigation Report — November 16, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for loss of Webre-Wells 500 kV
Acrobat 66 KB 12/17/08 ICTE Initial Investigation Report — November 16, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV
Acrobat 79 KB 12/17/08 ICTE Initial Investigation Report — November 16, 2008 — Flowgate 15429 — Hilltop-Marshall 161 kV for loss of Russellville - Dardanelle Dam 161 kV
Acrobat 292 KB 11/20/08 SPP Initial Investigation Report — September 18-19, 2008 — Flowgate 15323 — Harrington – Nichols 230 kV for loss of Harrington – Nichols 230 kV
Acrobat 151 KB 11/20/08 SPP Initial Investigation Report — September 21, 2008 — Flowgate 15323 — Harrington – Nichols 230 kV for loss of Harrington – Nichols 230 kV
Acrobat 180 KB 11/20/08 SPP Initial Investigation Report — September 13, 2008 — Flowgate 15317 — N. Texas – Whitney 138 kV for loss of Pirkey – Diana 345 kV
Acrobat 186 KB 11/20/08 SPP Initial Investigation Report — September 13-14, 2008 — Flowgate 15316 — Diana – Lonestar South 138 kV for loss of Wilkes – Welsh 345 kV
Acrobat 153 KB 11/20/08 SPP Initial Investigation Report — September 14, 2008 — Flowgate 15317 — N. Texas – Whitney 138 kV for loss of Pirkey – Diana 345 kV
Acrobat 117 KB 11/20/08 SPP Initial Investigation Report — September 17, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV
Acrobat 148 KB 11/20/08 SPP Initial Investigation Report — September 16, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV
Acrobat 199 KB 11/20/08 SPP Initial Investigation Report — September 11, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV
Acrobat 160 KB 11/20/08 SPP Initial Investigation Report — September 8, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV
Acrobat 169 KB 11/20/08 SPP Initial Investigation Report — September 9, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV
Acrobat 141 KB 11/20/08 SPP Initial Investigation Report — October 4, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV)
Acrobat 150 KB 11/20/08 SPP Initial Investigation Report — October 5, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV)
Acrobat 180 KB 11/20/08 SPP Initial Investigation Report — October 21, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV)
Acrobat 138 KB 11/20/08 SPP Initial Investigation Report — September 12, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV
Acrobat 161 KB 11/20/08 SPP Initial Investigation Report — September 11, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 218 KB 11/20/08 SPP Initial Investigation Report — October 22, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV
Acrobat 99 KB 11/20/08 TVA Initial Investigation Report — January 9, 2008 — Flowgate 1377 — Fairport - Lathrop 161 KV (flo) Iatan - Stranger 345 KV + Lake Rd. - Nashua 161 KV
Acrobat 82 KB 11/20/08 TVA Initial Investigation Report — July 05, 2008 — Flowgate 15196 — Stoddard - Essex 161 KV (flo) New Madrid - Essex - Lutesville 345 KV
Acrobat 107 KB 11/20/08 TVA Initial Investigation Report — June 13, 2008 — Flowgate 15134 — Shawnee - Northeast Area 161 KV (flo) Shawnee - Marshall 500 KV
Acrobat 85 KB 11/20/08 TVA Initial Investigation Report — April 9, 2008 — Flowgate 15006 — Lebanon - Orla 161 KV (flo) Huben - Marshfield 161 KV
Acrobat 83 KB 11/20/08 TVA Initial Investigation Report — April 8, 2008 — Flowgate 15007 — Huben - Marshfield 161 KV (flo) Lebanon - Mansfield 161 KV
Acrobat 86 KB 11/20/08 TVA Initial Investigation Report — April 8, 2008 — Flowgate 15011 — Huben - Marshfield 161 KV
Acrobat 84 KB 11/20/08 TVA Initial Investigation Report — February 15, 2008 — Flowgate 14897 — New Hardinsburg - Hardinsburg 138 KV (flo) Cloverport - Hardinsburg 138 KV
Acrobat 83 KB 11/20/08 TVA Initial Investigation Report — February 14, 2008 — Flowgate 14897 — New Hardinsburg - Hardinsburg 138 KV (flo) Cloverport - Hardinsburg 138 KV
Acrobat 96 KB 11/20/08 TVA Initial Investigation Report — January 8, 2008 — Flowgate 1377 — Fairport - Lathrop 161 KV (flo) Iatan - Stranger 345 KV + Lake Rd. - Nashua 161 KV
Acrobat 69 KB 10/28/08 ICTE Initial Investigation Report — October 16, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 68 KB 10/28/08 ICTE Initial Investigation Report — October 10, 2008 — Flowgate 15008 — Nelson AT1 500/230 kV for the loss of Hartburg-Cypress 500 kV
Acrobat 88 KB 10/28/08 ICTE Initial Investigation Report — October 6, 2008 — Flowgate 15008 — Nelson AT1 500/230 kV for the loss of Hartburg-Cypress 500 kV
Acrobat 105 KB 10/28/08 ICTE Initial Investigation Report — October 4, 2008 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta-McNeil 500 kV
Acrobat 89 KB 10/28/08 ICTE Initial Investigation Report — October 1, 2008 — Flowgate 15328 — Addis Tiger 230 kV for the loss of Fancy Point McKnight 500 kV
Acrobat 85 KB 10/28/08 ICTE Initial Investigation Report — September 26, 2008 — Flowgate 15328 — Addis Tiger 230 kV for the loss of Fancy Point McKnight 500 kV
Acrobat 67 KB 10/28/08 ICTE Initial Investigation Report — September 25, 2008 — Flowgate 15328 — Addis Tiger 230 kV for the loss of Fancy Point McKnight 500 kV
Acrobat 64 KB 10/28/08 ICTE Initial Investigation Report — September 15, 2008 — Flowgate 1910 — Fancy Auto 500/230 kV for the loss of Coly - McKnight 500 kV
Acrobat 80 KB 10/28/08 ICTE Initial Investigation Report — September 14, 2008 — Flowgate 15304 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV
Acrobat 58 KB 10/28/08 ICTE Initial Investigation Report — September 11, 2008 — Flowgate 1910 — Fancy Auto 500/230 kV for the loss of Coly - McKnight 500 kV
Acrobat 73 KB 10/28/08 ICTE Initial Investigation Report — September 8, 2008 — Flowgate 1910 — Fancy Auto 500/230 kV for the loss of Coly - McKnight 500 kV
Acrobat 73 KB 10/28/08 ICTE Initial Investigation Report — September 8, 2008 — Flowgate 1902 — Scott-Bonin 138 kV for the loss of TJ Labbe-Bonin 230 kV
Acrobat 83 KB 10/28/08 ICTE Initial Investigation Report — August 28, 2008 — Flowgate 1330 — McAdams 500-230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 69 KB 10/28/08 MISO Initial Investigation Report — August 13, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 97 KB 9/22/08 ICTE Initial Investigation Report — August 12, 2008 — Flowgate 1388 — Mt. Olive - Hartburg for the loss of Webre - Wells
Acrobat 260 KB 11/20/08 IESO Initial Investigation Report — August 11-12, 2008 — Flowgate 9160 — ONT-NYIS
Acrobat 161 KB 9/22/08 ICTE Initial Investigation Report — August 10, 2008 — Flowgate 1388 — Mt. Olive - Hartburg for the loss of Webre - Wells
Acrobat 54 KB 9/22/08 ICTE Initial Investigation Report — August 9, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 51 KB 10/28/08 MISO Initial Investigation Report — August 06, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 80 KB 9/22/08 ICTE Initial Investigation Report — August 5, 2008 — Flowgate 15239 — Sheridan - Mabelvale 500 kV for the loss of White Bluff - Keo 500 kV
Acrobat 62 KB 9/22/08 MISO Initial Investigation Report — August 1-4, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 60 KB 8/19/08 ICTE Initial Investigation Report — July 27, 2008 — Flowgate 15243 — McAdams 500/230 Auto for the loss of Choctaw Gas - W. Point 500 kV
Acrobat 64 KB 8/19/08 ICTE Initial Investigation Report — July 27, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV
Acrobat 66 KB 8/19/08 ICTE Initial Investigation Report — July 25, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV
Acrobat 55 KB 9/22/08 MISO Initial Investigation Report — July 24-26, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 60 KB 8/19/08 ICTE Initial Investigation Report — July 24, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV
Acrobat 44 KB 9/22/08 MISO Initial Investigation Report — July 23, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 51 KB 9/22/08 MISO Initial Investigation Report — July 22, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 89 KB 7/30/08 ICTE Initial Investigation Report — July 20, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV
Acrobat 57 KB 8/19/08 MISO Initial Investigation Report — July 14, 2008 — Flowgate 6190 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV
Acrobat 77 KB 8/19/08 ICTE Initial Investigation Report — July 3, 2008 — Flowgate 1309 — Terrebonne - Greenwood 115 kV for the loss of Webre – Wells 500 kV
Acrobat 77 KB 7/30/08 ICTE Initial Investigation Report — July 3, 2008 — Flowgate 1388 — Terrebonne - Greenwood for the loss of Webre – Wells 500 kV
Acrobat 89 KB 7/30/08 ICTE Initial Investigation Report — July 2, 2008 — Flowgate 1388 — Mt. Olive – Hartburg 500 kV for the loss of Webre – Wells 500 kV
Acrobat 69 KB 6/27/08 ICTE Initial Investigation Report — June 24, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 43 KB 7/30/08 MISO Initial Investigation Report — June 10, 2008 — Flowgate 6072 — Letellier-Drayton 230kV (L20D)
Acrobat 54 KB 6/27/08 ICTE Initial Investigation Report — June 09, 2008 — Flowgate 15127 — Bull Shoals - Midway 161kVfor the loss of Independence - Moorefield 161kV
Acrobat 41 KB 7/30/08 MISO Initial Investigation Report — June 07, 2008 — Flowgate 6175 — Wabaco- Rochester 161kV flo Prairie Island-Byron 345kV
Acrobat 43 KB 6/27/08 MISO Initial Investigation Report — June 07, 2008 — Flowgate 6009 — Cooper South Interface
Acrobat 49 KB 6/27/08 ICTE Initial Investigation Report — June 06, 2008 — Flowgate 15127 — Bull Shoals - Midway 161kVfor the loss of Independence - Moorefield 161kV
Acrobat 44 KB 6/27/08 MISO Initial Investigation Report — June 04, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 45 KB 6/27/08 MISO Initial Investigation Report — June 03, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 38 KB 6/16/08 MISO Initial Investigation Report — May 24, 2008 — Flowgate 6002 — MHEX_S Interface
Acrobat 59 KB 6/27/08 MISO Initial Investigation Report — May 22, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 75 KB 6/27/08 ICTE Initial Investigation Report — May 22, 2008 — Flowgate 1942 — Hartburg 500/230 kV Auto for the loss of Hartburg - Cypress 500 kV)
Acrobat 75 KB 6/16/08 ICTE Initial Investigation Report — May 16, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 84 KB 6/16/08 ICTE Initial Investigation Report — May 15, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV
Acrobat 70 KB 6/11/08 ICTE Initial Investigation Report — May 9, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 345 KB 6/11/08 ICTE Initial Investigation Report — May 6, 2008 — Flowgate 15064 — Mabelvale - Bryant 115 kV for the loss of Whitebluff - Sheridan 500 kV
Acrobat 202 KB 6/11/08 ICTE Initial Investigation Report — May 2, 2008 — Flowgate 15056 — Mabelvale - Bryant 115 kV for the loss of Whitebluff - Sheridan 500 kV
Acrobat 97 KB 6/11/08 ICTE Initial Investigation Report — May 2, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 87 KB 6/11/08 ICTE Initial Investigation Report — May 1, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV
Acrobat 46 KB 6/04/08 MISO Initial Investigation Report — May 1, 2008 — Flowgate 6007 — WNE-WKS Interface
Acrobat 43 KB 5/23/08 MISO Initial Investigation Report — April 24, 2008 — Flowgate 6002 — MHEX_S Interface
Acrobat 47 KB 5/23/08 ICTE Initial Investigation Report — April 22, 2008 — Flowgate 14737 — Scott - Semere 138 kV for the loss of Scott - Judice 138 kV
Acrobat 54 KB 5/23/08 ICTE Initial Investigation Report — April 21, 2008 — Flowgate 14737 — Scott - Semere 138 kV for the loss of Scott - Judice 138 kV
Acrobat 60 KB 4/28/08 ICTE Initial Investigation Report — April 10, 2008 — Flowgate 14945 — Scott-Bonin 138 kV for the loss of Wells-Pont Des Mouton 230 kV
Acrobat 83 KB 4/28/08 ICTE Initial Investigation Report — April 08, 2008 — Flowgate 15008 — Nelson XF 500/230 for the loss of Cypress-Hartburg 500 kV
Acrobat 42 KB 4/07/08 MISO Initial Investigation Report — March 31, 2008 — Flowgate 6002 — MHEX_S Interface
Acrobat 54 KB 4/28/08 ICTE Initial Investigation Report — March 31, 2008 — Flowgate 14945 — Scott-Bonin 138 kV for the loss of Wells-Pont Des Mouton 230 kV
Acrobat 81 KB 4/28/08 ICTE Initial Investigation Report — March 27, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for the loss of Webre-Wells 500 kV
Acrobat 82 KB 4/28/08 ICTE Initial Investigation Report — March 26, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for the loss of Webre-Wells 500 kV
Acrobat 38 KB 4/07/08 MISO Initial Investigation Report — March 26, 2008 — Flowgate 6002 — MHEX_S Interface
Acrobat 38 KB 4/07/08 MISO Initial Investigation Report — March 25, 2008 — Flowgate 6002 — MHEX_S Interface
Acrobat 82 KB 3/28/08 ICTE Initial Investigation Report — March 08, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover
Acrobat 98 KB 3/28/08 ICTE Initial Investigation Report — March 06, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover
Acrobat 115 KB 3/28/08 ICTE Initial Investigation Report — March 04-05, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover
Acrobat 88 KB 3/28/08 ICTE Initial Investigation Report — February 27, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover
Acrobat 153 KB 2/27/08 ICTE Initial Investigation Report — February 1, 2008 — Flowgate 14870 — Fancy Point Auto 500/230kv for the loss of Big Cajun 2 - Webre 500kv
Acrobat 47 KB 2/25/08 MISO Initial Investigation Report — January 24, 2008 — Flowgate 6126 — Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV
Acrobat 41 KB 2/05/08 MISO Initial Investigation Report — December 30, 2007 — Flowgate 2086 — SIGE Flowgate 2086 Newtonville 138/161
Acrobat 49 KB 2/05/08 MISO Initial Investigation Report — December 10, 2007 — Flowgate 6116 & 14551 — 6116:Alma-Elk Mound 161kV FLO King-Eau Claire 345kV 14551:Alma-Elk Mound 161kV FLO King-Eau Claire-Arpin 345kV
Acrobat 62 KB 1/24/08 MISO Initial Investigation Report — December 5, 2007 — Flowgate 6164 — Plymouth-Sioux City 161kV flo Raun-Sioux City 345kV
Acrobat 45 KB 1/17/08 MISO Initial Investigation Report — December 4, 2007 — Flowgate 6126 — Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV
Acrobat 59 KB 1/24/08 MISO Initial Investigation Report — December 1, 2007 — Flowgate 6164 — Plymouth-Sioux City 161kV flo Raun-Sioux City 345kV
Acrobat 53 KB 1/2/08 MISO Initial Investigation Report — November 29, 2007 — Flowgate 6126 —Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV
Acrobat 57 KB 1/2/08 MISO Initial Investigation Report — November 27, 2007 — Flowgate 6146 —Tekamah-Raun 161kV flo Ft. Calhoun-Raun 345kV
Acrobat 99 KB 12/03/07 MISO Initial Investigation Report — November 16, 2007 — Flowgate 2506 — Speed - Northside 138
Acrobat 51 KB 1/2/08 MISO Initial Investigation Report — November 8, 2007 — Flowgate 6146 — Tekamah-Raun 161kV flo Ft. Calhoun-Raun 345kV
Acrobat 41 KB 12/17/07 MISO Initial Investigation Report — November 7, 2007 — Flowgate 14660 —Rochester-Wabaco 161kV flo King-Eau Claire-Arpin 345kV
Acrobat 41 KB 12/17/07 MISO Initial Investigation Report — November 7, 2007 — Flowgate 6015 —Alma-Wabaco 161kV flo King-Eau Claire 345kV
Acrobat 44 KB 11/28/07 MISO Initial Investigation Report — October 26, 2007 — Flowgate 6002 — MHEX_S Interface
Acrobat 46 KB 1/2/08 MISO Initial Investigation Report #2 — October 22, 2007 — Flowgate 6002 — MHEX_S Interface
Acrobat 46 KB 11/16/07 MISO Initial Investigation Report #1 — October 22, 2007 — Flowgate 6002 — MHEX_S Interface
Acrobat 64 KB 11/16/07 ICTE Initial Investigation Report — October 16-17, 2007 — Flowgate 14587 — Mabelvale-Bryant 115kV for the loss of Magnet Cove-Hot Springs 500kV
Acrobat 33 KB 10/31/07 ICTE Initial Investigation Report — September 19, 2007 — Flowgate 1309 — Terrebonne-Greenwood 115kV FTLO Webre-Wells 500kV
Acrobat 64 KB 10/31/07 ICTE Initial Investigation Report — August 29, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 66 KB 10/31/07 ICTE Initial Investigation Report — August 24, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 64 KB 10/31/07 ICTE Initial Investigation Report — August 23, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 63 KB 10/31/07 ICTE Initial Investigation Report — August 22, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 61 KB 10/31/07 ICTE Initial Investigation Report — August 17, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 70 KB 10/31/07 ICTE Initial Investigation Report — August 16, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 60 KB 10/31/07 ICTE Initial Investigation Report — August 15, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 60 KB 10/31/07 ICTE Initial Investigation Report — August 14, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 71 KB 10/31/07 ICTE Initial Investigation Report — August 10, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 80 KB 10/31/07 ICTE Initial Investigation Report — August 9, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 78 KB 10/31/07 ICTE Initial Investigation Report — August 8, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 78 KB 10/31/07 ICTE Initial Investigation Report — August 7, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 62 KB 10/16/07 MISO Initial Investigation Report — August 8, 2007 — Flowgate 14543 — Rochester-Wabaco 161kV flo Eau Claire TR9 + Eau Claire TR9 + King-Ea Claire-Arpin-Arpin 345kV
Acrobat 46 KB 10/10/07 MISO Initial Investigation Report — September 18, 2007 — Flowgate 6002 — MHEX_S Interface
Acrobat 175 KB 10/09/07 PJM Initial Investigation Report — August 20, 2007 — Flowgate 14580 — Clubhouse-Lakeview 230kV flo Carson-Wake 500kv
Acrobat 52 KB 10/04/07 MISO Initial Investigation Report — September 5, 2007 — Flowgate 6116 — Alma-Elk Mound 161kV flo King-Eau Claire 345kV
Acrobat 51 KB 10/03/07 MISO Initial Investigation Report — August 15, 2007 — Flowgate 6007 — WNE-WKS Interface
Acrobat 54 KB 09/26/07 MISO Initial Investigation Report — August 16, 2007 — Flowgate 14551 — Alma-Elk Mound 161kV flo King-Eau Claire-Arpin 345kV
Acrobat 69 KB 09/26/07 MISO Initial Investigation Report — August 14, 2007 — Flowgate 14551 — Alma-Elk Mound 161kV flo King-Eau Claire-Arpin 345kV
Acrobat 53 KB 09/20/07 MISO Initial Investigation Report — August 10, 2007 — Flowgate 6002 — MHEX_S Interface
Acrobat 
Excel
26 KB
45 KB
09/10/07 TVA Initial Investigation Report — August 11, 2007 — Flowgate 14555 — TVA RC for TVA Flowgate No. 14555
Acrobat 
Excel
33 KB
114 KB
09/10/07 TVA Initial Investigation Report — June 30, 2007 — Flowgate 14387 — TVA RC for AECI Flowgate No. 14387
Acrobat 
Excel
94 KB
129 KB
09/10/07 TVA Initial Investigation Report — July 10, 2007 — Flowgate 1613 — TVA for Flowgate No. 1613
Acrobat 
Excel
27 KB
39 KB
09/07/07 TVA Initial Investigation Report — July 09, 2007 — Flowgate 1011 — TVA RC for AECI Flowgate No. 1011
Acrobat 62 KB 08/30/07 MISO Initial Investigation Report — July 02-03, 2007 — Flowgate 14423 — Ottumwa-Bridgeport 161kV flo Ottumwa-EIC 161kV
Acrobat 117 KB 08/24/07 ICTE Initial Investigation Report — July 17, 2007 — Flowgate 14426 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 105 KB 08/24/07 ICTE Initial Investigation Report — July 16, 2007 — Flowgate 14426 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV
Acrobat 49 KB 08/23/07 ICTE Initial Investigation Report — July 12, 2007 — Flowgate 1903 — Cecelia-Moril 138 kV for loss of Flanders-Hopkins 138 kV
Acrobat 51 KB 08/23/07 ICTE Initial Investigation Report — July 10, 2007 — Flowgate 1903 — Cecelia-Moril 138 kV for loss of Flanders-Hopkins 138 kV
Acrobat 79 KB 08/23/07 ICTE Initial Investigation Report — June 23, 2007 — Flowgate 1330 — McAdams500-230 for loss of McAdams-Lakeover
Acrobat 43 KB 08/22/07 MISO Initial Investigation Report — July 18, 2007 — Flowgate 14474 — Duff – Dubois 138 (flo) Duff – Ramsey 345
Acrobat 46 KB 08/15/07 ICTE Initial Investigation Report — June 19, 2007 — Flowgate 14404 — Thomas-Louisiana Station 138kV for the loss of Webre-Wells 500
Acrobat 58 KB 08/15/07 ICTE Initial Investigation Report — June 14, 2007 — Flowgate 1330 — McAdams 500/230 auto FTLO McAdams-Lakeover 500Kv
Acrobat 81 KB 08/15/07 ICTE Initial Investigation Report — June 11, 2007 — Flowgate 1330 — McAdams 500/230 auto FTLO McAdams-Lakeover 500Kv
Acrobat 88 KB 08/15/07 ICTE Initial Investigation Report — June 9, 2007 — Flowgate 1330 — McAdams 500/230 for loss of McAdams-Lakeover 500Kv
Acrobat 104 KB 08/14/07 ICTE Initial Investigation Report — May 20, 2007 — Flowgate 1330 — McAdams 500/230 FTLO McAdams-Lakeover 500kV
Acrobat 90 KB 08/13/07 ICTE Initial Investigation Report — May 18, 2007 — Flowgate 14281 — Nelson 500/230 for the loss of Cypress-Hartburg 500kV
Acrobat 102 KB 07/30/07 MISO Initial Investigation Report — June 18, 2007 — Flowgate 6166 — Alma-Elk Mound 161kV flo King-Eau Claire 345kV
Acrobat 100 KB 07/26/07 MISO Initial Investigation Report — June 12, 2007 — Flowgate 14266 — Wisdom-Triboji 161kV flo Sherco #3
Acrobat 87 KB 07/13/07 MISO Initial Investigation Report — June 11, 2007 — Flowgate 14266 — Wisdom-Triboji 161kV flo Sherco #3
Acrobat 63 KB 07/02/07 MISO Initial Investigation Report — June 11, 2007 — Flowgate 3529 — N. Appleton-Werner W. 345 (WEC)
Acrobat 88 KB 06/21/07 MISO Initial Investigation Report — May 9, 2007 — Flowgate 14292 — Raun-Interchange 161kV flo Raun-Sioux City 345kV
Acrobat 33 KB 06/18/07 MISO Initial Investigation Report — May 15, 2007 — Flowgate 6002 — MHEX_S Interface
Acrobat 195 KB 06/14/07 MISO Initial Investigation Report — May 13, 2007 — Flowgate 2916 — Newtonville — Troy 161
Acrobat 112 KB 06/08/07 ICTE Initial Investigation Report — May 6, 2007 — Flowgate 14225 — Morrilton East-Gleason 161kV for the loss of Pleasant Hill-Mayflower 500kV
Acrobat 117 KB 06/08/07 ICTE Initial Investigation Report — April 28, 2007 — Flowgate 14225 — Morrilton East-Gleason 161kV for the loss of Pleasant Hill-Mayflower 500kV
Acrobat 67 KB 06/07/07 MISO Initial Investigation Report — May 5th & 6th, 2007 — Flowgate 2026 — Newtonville - Coleman 161
Acrobat 45 KB 06/07/07 MISO Initial Investigation Report — May 1, 2007 — Flowgate 14260 — Dubois – Culley 138 (flo) Warrick Unit 4
Acrobat 102 KB 06/07/07 ICTE Initial Investigation Report — April 23, 2007 — Flowgate 1902 — Scott-Bonin 138kV for the loss of Renaud-Bonin 230kV
Acrobat 90 KB 05/24/07 MISO Initial Investigation Report — April 9, 2007 — Flowgate 14228 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV
Acrobat 32 KB 04/09/07 ICTE Initial Investigation Report — March 3, 2007 — Flowgate 1347 — Wilbert-Livonia 138kV for the loss of Webre-Wells 500kV
Acrobat 18 KB 03/22/07 MISO Initial Investigation Report — February 24, 2007 — Flowgate 6003 — MHEX_N Interface
Acrobat 36 KB 03/22/07 MISO Initial Investigation Report — February 14, 2007 — Flowgate 14100 — Davenport-Sub 78 161kV flo Sub 91-Davenport 345kV
Acrobat 145 KB 03/08/07 MISO Initial Investigation Report — February 8, 2007 — Flowgate 6003 — MHEX_N Interface
Acrobat 35 KB 02/24/07 MISO Initial Investigation Report — January 19, 2007 — Flowgate 14028 — Plymouth-Sioux City 161kV flo Raun-Lakefield 345kV line
Acrobat 28 KB 02/24/07 MISO Initial Investigation Report — January 16, 2007 — Flowgate 6169 — Hills-Montezuma 345 kV line
Acrobat 38 KB 02/24/07 MISO Initial Investigation Report — January 16, 2007 — Flowgate 6168 — Hills-Parnell 161kV flo Hills-Montezuma 345kV line
Acrobat 190 KB 01/19/07 MISO Initial Investigation Report — December 7, 2006 — Flowgate 13953 — Arnold-Hazleton 345kV line
Acrobat 1.2 MB 01/06/07 ICTE Initial Investigation Report — December 6, 2006 — Flowgate 1902 — Scott-Bonin 138kV for the loss of Renaud-Bonin 230kV
Acrobat 166 KB 12/01/06 MISO Initial Investigation Report — October 23, 2006 — Flowgate 2086 — Newtonville 161/138
Acrobat 103 KB 11/28/06 MISO Initial Investigation Report — October 13 & October 25, 2006 — Flowgate 6060 — Dorsey-Forbes 500kV line
Acrobat 142 KB 11/14/06 MISO Initial Investigation Report — October 12, 2006 — Flowgate 6003 — MHEX_N Interface
Acrobat 14 KB 11/07/06 EES Initial Investigation Report — October 3, 2006 — Flowgate 1903 — Cecelia-Moril 138kV for the loss of Flanders-Hopkins 138kV
Acrobat 30 KB 11/01/06 MISO Initial Investigation Report — October 1, 2006 — Flowgate 3741 — Marshalltown-Fernald 115 kV (flo) Montezuma-Bondurant 345 kV
Acrobat 37 KB 10/30/06 MISO Initial Investigation Report — October 1, 2006 — Flowgate 6139 — Judson Large-Greensburg 115 kV (flo) Mullergren 230/115 kV Xfmr
Acrobat 22 KB 10/26/06 MISO Initial Investigation Report — September 28, 2006 and September 27, 2006 — Flowgate 13746 — Genoa-Lacrosse 161kV for the loss of the JPM unit
Acrobat 51 KB 10/25/06 MISO Initial Investigation Report — September 28, 2006 and September 29, 2006 — Flowgate 6115 — St. Joe-Midway 161 kV for loss of St. Joe - Fairport 345 kV
Acrobat 33 KB 10/25/06 MISO Initial Investigation Report — September 28, 2006 — Flowgate 6702 — Letellier-Drayton 230kV line
Acrobat 3.4 MB 10/20/06 EES Initial Investigation Report — August 22, 2006 — Flowgate 1903 — Cecelia-Moril 138kV for the loss of Flanders-Hopkins 138kV
Acrobat 148 KB 10/20/06 MISO Initial Investigation Report — September 19, 2006 — Flowgates 2506 & 13752 — Duke Energy Speed – Northside 138 and Speed 345/138 Xfmr (flo) LGEE Ghent 345kV Bus Outage due to Breaker Outage without SPS.
Acrobat 26 KB 10/17/06 MISO Initial Investigation Report — September 16, 2006 — Flowgate 3706 — Arnold-Hazleton 345kV line
Acrobat 83 KB 09/28/06 MISO Initial Investigation Report — June 21-23, 2006 — Flowgate 2877 — Goddard-Rodburn 138 (flo) Spurlock-Avon 345 line and Flowgate 13555 — Goddard – Rodburn 138 (flo) EKP13024 Sheridan-Mabelvale 500kV FTLO White Bluff-Keo 500kV
Acrobat 10.2 MB 09/05/06 EES Initial Investigation Report — August 1, 2006 — Flowgate 13616 — Sheridan-Mabelvale 500kV FTLO White Bluff-Keo 500kV
Acrobat 10.5 MB 09/05/06 EES Initial Investigation Report — July 31, 2006 — Flowgate 13616 — Sheridan-Mabelvale 500kV FTLO White Bluff-Keo 500kV
Acrobat 112 KB 08/15/06 MISO Initial Investigation Report — July 19, 2006 — Flowgate 6002 — the MHEX_S Interface
Acrobat 117 KB 08/15/06 MISO Initial Investigation Report — July 16, 2006 — Flowgate 6002 — the MHEX_S Interface
Acrobat 764 KB 08/08/06 SPP Initial Investigation Report — June 11, 2006 — Flowgate 5204 — SphWmcSumEmc flowgate
Acrobat 1 MB 08/08/06 SPP Initial Investigation Report — June 9, 2006 — Flowgate 13525 — Temporary 4 flowgate (#13525 at that time)
Acrobat 10 MB 08/08/06 EES Initial Investigation Report — July 18, 2006 — Flowgate 13622 — North Crowley-Scott 138kV for the loss of Wells-Pont Des Mouton 230kV
Acrobat 31 KB 07/31/06 MISO Initial Investigation Report — June 30, 2006 — Flowgate 3719 — Salem 345/161kV Xfmr flo Quad Cities-Sub 91 345kV Line
Acrobat 34 KB 07/31/06 MISO Initial Investigation Report — June 30, 2006 — Flowgate 3724 — Arnold-Vinton 161kV Line flo Arnold-Hazleton 345kV Line
Acrobat 135 KB 07/24/06 MISO Initial Investigation Report — June 24, 2006 — Flowgate 6060 — Dorsey-Forbes 500kV Line
Acrobat 22 KB 07/17/06 SPP Initial Investigation Report — February 4 & 5, 2006 — Flowgate 5203 — HppValPitVal flow gate
Acrobat 748 KB 07/14/06 SPP Initial Investigation Report — May 31, 2006 — Flowgate 5098 — PecXfrMukCla flowgate
Acrobat 934 KB 07/14/06 SPP Initial Investigation Report — April 23, 2006 — Flowgate 5204 — SphWmcSumEmc flowgate
Acrobat 28 KB 07/05/06 MISO Initial Investigation Report — June 2, 2006 — Flowgate 6168 — Hills-Parnell 161kV flo Hills-Montezuma 345kV line
Acrobat 2 MB 6/21/06 EES Initial Investigation Report — June 8, 2006 — Flowgate 13502 — Scott-Bonin 138kV for the loss of Renaud-Bonin 230kV
Acrobat 54 KB 03/30/06

MISO Initial Investigation Report — February 27, 2006 — Flowgate 2877 — Goddard-Rodburn 138 (flo) Spurlock-Avon 345 line

Acrobat 50 KB 03/27/06

MISO Initial Investigation Report — March 12, 2006 — Flowgate 6145 — Lake Road-Nashua 161 kV for loss of Iatan-Stranger Creek 345kV

Acrobat 24 KB 02/28/06

MISO Initial Investigation Report — February 18, 2006 — Flowgate 13351 — Hazleton-Blackhawk 161 kV

Acrobat 24 KB 02/22/06

MISO Initial Investigation Report — January 21, 2006 — Flowgate 6169 — Hills-Montezuma 345kV line

Acrobat 57 KB 12/22/05 MISO Initial Investigation Report — November 30 to December 7, 2005 — Flowgate 13256 — Dundee – Hazelton 161 kV.
Acrobat 148 KB 11/03/05 PJM Initial Investigation Report — October 8, 2005 — Flowgate 100 — Kammer #200 765/500 kV transformer l/o Belmont-Harrison 500
Acrobat 68 KB 11/01/05 PJM Initial Investigation Report — September 15, 2005 — Flowgate 100 — Kammer #200 765/500 kV transformer l/o Belmont-Harrison 500
Acrobat 20 KB 10/18/05 MISO Initial Investigation Report — September 24, 2005 — Flowgate 6007 — Western Nebraska – Western Kansas Interface.
Acrobat 117 KB 09/23/05 VACS Initial Investigation Report — June 15, 2005 — Flowgate 12970 — Tillery-Badin 115 kV flo Newport-Richmond 500kV
Acrobat 31 KB 08/05/05 MISO Initial Investigation Report — July 12 & July 13, 2005 — Flowgate 3706 — Arnold - Hazelton Interface.
Acrobat 17 KB 07/28/05 MISO Initial Investigation Report — July 12 & July 13, 2005 — Flowgate 6007 — Western Nebraska – Western Kansas Interface.
Acrobat 16 KB 07/14/05 MISO Initial Investigation Report — July 8 & July 10, 2005 — Flowgate 6072 — Letellier – Drayton 230kv line.
Acrobat 20 KB 07/14/05 MISO Initial Investigation Report — July 2, 2005 — Flowgate 6023 — Western Nebraska – Western Kansas Interface.
Acrobat 19 KB 07/07/05 MISO Initial Investigation Report — July 1, 2005 — Flowgate 6072 — Letellier – Drayton 230kv line.
Acrobat 18 KB 07/07/05 MISO Initial Investigation Report — June 20, 2005 — Flowgate 6002 — Manitoba – USA Interface
Acrobat 17 KB 07/07/05 MISO Initial Investigation Report — June 20, 2005 — Flowgate 12997 — Manitoba – USA Interface
Acrobat 3.8 MB 06/17/05 EES Initial Investigation Report — May, 25, 2005 — Flowgate 12917 Scott-Bonin 138kV for the loss of Richard-Habetz 138kV
Acrobat 4.9 MB 06/17/05 EES Initial Investigation Report — May, 24, 2005 — Flowgate 12931 Scott-Bonin 138kV for the loss of West Fork-Pont des Mouton 230kV
Acrobat 5.1 MB 06/17/05 EES Initial Investigation Report — May, 23, 2005 — Flowgate 1327 — Scott-Bonin 138kV for the loss of Cocodrie-Ville Platte 230kV
Acrobat 4.9 MB 06/13/05 EES Initial Investigation Report — May, 19, 2005 — Flowgate 12917 Scott-Bonin 138kV for the loss of Richard-Habetz 138kV
Acrobat 4.9 MB 06/13/05 EES Initial Investigation Report — May, 18, 2005 — Flowgate 12917 Scott-Bonin 138kV for the loss of Richard-Habetz 138kV
Acrobat 2.8 MB 06/13/05 EES Initial Investigation Report — May, 11, 2005 — Flowgate 1350 — North Crowley-Scott 138kV for the loss of Richard-Scott 138kV