TLR Investigation Reports
|
| File
Type |
Size |
Date |
Description |
|
Acrobat |
93 KB |
7/26/10 |
SPP Initial Investigation Report —
June 22-23, 2010 — Flowgate TEMP10_16439 — Platte City – Kansas City International 161 kV line for loss of Stranger - Craig 345 kV line |
|
Acrobat |
113 KB |
7/26/10 |
SPP Initial Investigation Report —
June 20-21, 2010 — Flowgate TEMP10_16439 — Platte City – Kansas City International 161 kV line for loss of Stranger - Craig 345 kV line |
|
Acrobat |
98 KB |
7/26/10 |
SPP Initial Investigation Report —
June 5, 2010 — Flowgate TEMP01_16413 — Arcadia 345/138 kV Transformer for loss of Arcadia – Northwest 345 kV line |
|
Acrobat |
103 KB |
7/27/10 |
SPP Initial Investigation Report —
May 23, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
115 KB |
7/27/10 |
SPP Initial Investigation Report —
May 22, 2010 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
148 KB |
7/27/10 |
SPP Initial Investigation Report —
May 22, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
124 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 22, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
151 KB |
7/27/10 |
SPP Initial Investigation Report —
May 21, 2010 — Flowgate 15940 — Osage Switch – Canyon East 115 kV for loss of Bushland – Deaf Smith 230 kV |
|
Acrobat |
48 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 21, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
110 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 20, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
108 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 19, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
48 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 19, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
102 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 19, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
105 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 19, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
54 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 18, 2010 — Flowgate 16373 — McAdams - Pickens 230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
109 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 18, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
69 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 17, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
75 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 16, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
139 KB |
7/27/10 |
SPP Initial Investigation Report —
May 16, 2010 — Flowgate 5015 — El Paso – Farber 138 kV for the loss of Wichita - Woodring 345 kV |
|
Acrobat |
107 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 16, 2010 — Flowgate 1324 — Whitebluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
122 KB |
7/27/10 |
SPP Initial Investigation Report —
May 14, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
119 KB |
7/27/10 |
SPP Initial Investigation Report —
May 12, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
84 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 11, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
191 KB |
7/27/10 |
SPP Initial Investigation Report —
May 10-11, 2010 — Flowgate TEMP03_16364 — Southwest Shreveport – Wallace Lake 138 kV Line for loss of Dolet 345/230 kV Transformer |
|
Acrobat |
132 KB |
7/27/10 |
SPP Initial Investigation Report —
May 4, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
124 KB |
7/27/10 |
SPP Initial Investigation Report —
May 3, 2010 — Flowgate TEMP16_16341 — McElroy – Kinze 138 kV for loss of Sooner – Woodring 345 kV |
|
Acrobat |
95 KB |
7/27/10 |
ICTE Initial Investigation Report —
May 1, 2010 — Flowgate 1324 — White Bluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
106 KB |
7/27/10 |
ICTE Initial Investigation Report —
April 30, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
74 KB |
7/27/10 |
MISO Initial Investigation Report —
April 30, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
79 KB |
7/27/10 |
MISO Initial Investigation Report —
April 30, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
128 KB |
7/27/10 |
SPP Initial Investigation Report —
April 29-30, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
75 KB |
7/27/10 |
MISO Initial Investigation Report —
April 29, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
314 KB |
7/27/10 |
SPP Initial Investigation Report —
April 28-29, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
113 KB |
7/27/10 |
SPP Initial Investigation Report —
April 28, 2010 — Flowgate 16332 — McElroy – Kinze 138 kV line for the loss of Sooner – Spring Creek 345 kV line |
|
Acrobat |
110 KB |
7/27/10 |
SPP Initial Investigation Report —
April 27, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
74 KB |
7/27/10 |
MISO Initial Investigation Report —
April 27, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
174 KB |
7/27/10 |
SPP Initial Investigation Report —
April 26-27, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
134 KB |
7/27/10 |
SPP Initial Investigation Report —
April 23, 2010 — Flowgate 16329 — Five Tribes - Hancock 161 kV for the loss of Muskogee – Ft. Smith 345 kV |
|
Acrobat |
121 KB |
7/27/10 |
SPP Initial Investigation Report —
April 23, 2010 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
57 KB |
7/27/10 |
ICTE Initial Investigation Report —
April 19, 2010 — Flowgate 1330 — McAdams 500 - 230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
104 KB |
7/27/10 |
SPP Initial Investigation Report —
April 16, 2010 — Flowgate 16316 — Cherry Creek – Boyd 138 kV for the loss of Pleasant Valley – Hollywood 138 kV |
|
Acrobat |
75 KB |
7/27/10 |
MISO Initial Investigation Report —
April 16, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
127 KB |
7/27/10 |
SPP Initial Investigation Report —
April 16, 2010 — Flowgate 5211 — Lone Oak – Sardis 138 kV for loss of Pittsburg – Valliant 345 kV |
|
Acrobat |
144 KB |
7/27/10 |
SPP Initial Investigation Report —
April 15, 2010 — Flowgate 16316 — Cherry Creek – Boyd 138 kV for the loss of Pleasant Valley – Hollywood 138 kV |
|
Acrobat |
140 KB |
7/27/10 |
SPP Initial Investigation Report —
April 13-14, 2010 — Flowgate 5003 — Broken Bow – Bethel Tap 138 kV for loss of Valliant - Pittsburg 345 kV |
|
Acrobat |
49 KB |
7/27/10 |
ICTE Initial Investigation Report —
April 13, 2010 — Flowgate 16314 — Mabelvale - Bryant 115 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
123 KB |
7/27/10 |
MISO Initial Investigation Report —
April 13, 2010 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
364 KB |
7/27/10 |
SPP Initial Investigation Report —
April 12 and 15, 2010 — Flowgate 5211 — Lone Oak – Sardis 138 kV for loss of Pittsburg – Valliant 345 kV |
|
Acrobat |
125 KB |
7/27/10 |
MISO Initial Investigation Report —
April 12-13, 2010 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
79 KB |
7/27/10 |
MISO Initial Investigation Report —
April 12, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
79 KB |
7/27/10 |
MISO Initial Investigation Report —
April 11, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
321 KB |
7/27/10 |
SPP Initial Investigation Report —
April 10, 2010 — Flowgate 5196 — SPS North - South |
|
Acrobat |
83 KB |
7/27/10 |
MISO Initial Investigation Report —
April 9, 2010 — Flowgate 6061 — R50M 230kV |
|
Acrobat |
84 KB |
7/27/10 |
MISO Initial Investigation Report —
April 9, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
76 KB |
7/27/10 |
ICTE Initial Investigation Report —
April 9, 2010 — Flowgate 1347 — Wilbert - Livonia 138kV for the loss of Webre-Wells 500kV |
|
Acrobat |
41 KB |
7/27/10 |
ICTE Initial Investigation Report —
April 6, 2010 — Flowgate 16288 — Marshall - Botkinburg (aecc) 161 kV for the loss of Dardanelle Dam - Russellville South 161 kV |
|
Acrobat |
120 KB |
7/27/10 |
SPP Initial Investigation Report —
April 6, 2010 — Flowgate 5211 — Lone Oak – Sardis 138 kV for loss of Pittsburg – Valliant 345 kV |
|
Acrobat |
383 KB |
7/27/10 |
SPP Initial Investigation Report —
April 5-7, 2010 — Flowgate 5196 — SPS North - South |
|
Acrobat |
157 KB |
7/27/10 |
SPP Initial Investigation Report —
April 4-5, 2010 — Flowgate 5368 — Kress – Hale Co. 115 kV for loss of Swisher – Tuco 230 kV |
|
Acrobat |
77 KB |
7/27/10 |
MISO Initial Investigation Report —
April 5, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
192 KB |
7/27/10 |
SPP Initial Investigation Report —
April 3-4, 2010 — Flowgate 5354 — Randall – Palo Duro 115 kV for loss of Amarillo – Swisher 230 kV |
|
Acrobat |
285 KB |
7/27/10 |
SPP Initial Investigation Report —
April 1-2, 2010 — Flowgate 5354 — Randall – Palo Duro 115 kV for loss of Amarillo – Swisher 230 kV |
|
Acrobat |
306 KB |
4/15/10 |
SPP Initial Investigation Report —
March 27-28, 2010 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
43 KB |
7/27/10 |
ICTE Initial Investigation Report —
March 23, 2010 — Flowgate 16272 — Nelson AT1 500/230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
223 KB |
4/15/10 |
SPP Initial Investigation Report —
March 17, 2010 — Flowgate 6009 — COOPER_S |
|
Acrobat |
141 KB |
4/15/10 |
SPP Initial Investigation Report —
March 9, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV |
|
Acrobat |
81 KB |
4/15/10 |
SPP Initial Investigation Report —
March 4, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface |
|
Acrobat |
140 KB |
4/15/10 |
SPP Initial Investigation Report —
February 24, 2010 — Flowgate 16178 — Dyess – East Rogers 161 kV for the loss of Tontitown – Lowell 161 kV |
|
Acrobat |
69 KB |
7/27/10 |
ICTE Initial Investigation Report —
February 12, 2010 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
105 KB |
4/15/10 |
SPP Initial Investigation Report —
February 3, 2010 — Flowgate 16203 — Jenson Tap – Jenson Road 138 kV for the loss of Sunnyside – Lawton East 345 kV |
|
Acrobat |
129 KB |
4/15/10 |
SPP Initial Investigation Report —
December 19, 2009 — Flowgate 16129 — Ft. Smith - Arkhoma 161 kV for the loss of AES – Tarby 161 kV |
|
Acrobat |
163 KB |
4/15/10 |
SPP Initial Investigation Report —
December 21, 2009 — Flowgate 16087 — WR North Interface |
|
Acrobat |
108 KB |
4/15/10 |
SPP Initial Investigation Report —
January 10, 2010 — Flowgate 16147 — Neosho – Columbus 161 kV for the loss of Northeast Coal – Oneta 345 kV |
|
Acrobat |
335 KB |
4/15/10 |
SPP Initial Investigation Report —
December 10, 2009 — Flowgate 5029 — Mansfield – Int. Paper 138 kV for the loss of Dolet Hills – SW Shreveport 345 kV(ManIpmDolSws) |
|
Acrobat |
120 KB |
4/15/10 |
SPP Initial Investigation Report —
December 24, 2009 — Flowgate 5358 — Anadarko – Cornville Tap 138 kV for loss of Southwestern Station – Norge 138 kV(ANACORSWSNOR) |
|
Acrobat |
109 KB |
4/15/10 |
SPP Initial Investigation Report —
December 15, 2009 — Flowgate 16118 — McElroy - Kinze 138 kV for the loss of Sooner – Spring Creek 345 kV |
|
Acrobat |
111 KB |
4/15/10 |
SPP Initial Investigation Report —
February 22, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV(LAKALAIATSTR) |
|
Acrobat |
134 KB |
4/15/10 |
SPP Initial Investigation Report —
January 24, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV(LAKALAIATSTR) |
|
Acrobat |
216 KB |
4/15/10 |
SPP Initial Investigation Report —
January 16, 2010 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV(LAKALAIATSTR) |
|
Acrobat |
107 KB |
4/15/10 |
SPP Initial Investigation Report —
December 27, 2009 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
121 KB |
4/15/10 |
SPP Initial Investigation Report —
December 25, 2009 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
111 KB |
4/15/10 |
SPP Initial Investigation Report —
December 24, 2009 — Flowgate 16045 — Neosho – Columbus 161 kV for the loss of Neosho – Delaware 345 kV |
|
Acrobat |
159 KB |
4/15/10 |
SPP Initial Investigation Report —
January 10, 2010 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
159 KB |
4/15/10 |
SPP Initial Investigation Report —
December 27-28, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
209 KB |
4/15/10 |
SPP Initial Investigation Report —
December 25-26, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
75 KB |
4/15/10 |
SPP Initial Investigation Report —
December 24, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
134 KB |
4/15/10 |
SPP Initial Investigation Report —
December 4-5, 2009 — Flowgate 16094 — Neosho – Columbus 161 kV for the loss of Neosho – Morgan 345 kV |
|
Acrobat |
113 KB |
4/15/10 |
SPP Initial Investigation Report —
February 25, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface |
|
Acrobat |
138 KB |
4/15/10 |
SPP Initial Investigation Report —
February 18-19, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface |
|
Acrobat |
138 KB |
4/15/10 |
SPP Initial Investigation Report —
February 16-17, 2010 — Flowgate 16216 — Welsh – Diana 345 kV Interface |
|
Acrobat |
88 KB |
4/15/10 |
MISO Initial Investigation Report —
March 31, 2010 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
141 KB |
4/15/10 |
MISO Initial Investigation Report —
March 1-2, 2010 — Flowgate 16230 — Lewis and Clark - Dawson County 115kV (flo) Belfield – Medora -
Dawson County 230kV + SPS Flowgate |
|
Acrobat |
103 KB |
4/15/10 |
MISO Initial Investigation Report —
February 11, 2010 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
73 KB |
4/15/10 |
MISO Initial Investigation Report —
December 15, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
74 KB |
4/15/10 |
MISO Initial Investigation Report —
December 9, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
74 KB |
4/15/10 |
MISO Initial Investigation Report —
December 9, 2009 — Flowgate 16109 — Leland Olds-Logan 230kV |
|
Acrobat |
85 KB |
4/15/10 |
MISO Initial Investigation Report —
December 9, 2009 — Flowgate 6003 — MHEX_N Interface |
|
Acrobat |
74 KB |
4/15/10 |
ICTE Initial Investigation Report —
October 8, 2009 — Flowgate 1330 — McAdams 500/230 for the loss of McAdams-Lakeover |
|
Acrobat |
44 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 30, 2009 — Flowgate 1326 — Mabelvale-Sheridan for the loss of WhiteBluff-Sheridan |
|
Acrobat |
41 KB |
1/27/10 |
ICTE Initial Investigation Report —
December 24, 2009 — Flowgate 1309 — Terrebonne - Greenwood 115 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
49 KB |
1/27/10 |
ICTE Initial Investigation Report —
December 5, 2009 — Flowgate 1388 — Mt Olive - Hartburg 500 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
44 KB |
1/27/10 |
ICTE Initial Investigation Report —
December 10, 2009 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
43 KB |
1/27/10 |
ICTE Initial Investigation Report —
August 12, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
45 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 14, 2009 — Flowgate 16031 — Mt Olive - Hartburg 500 kV for the loss of McKnight - Coly 500 kV |
|
Acrobat |
38 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 12, 2009 — Flowgate 16031 — Mt Olive - Hartburg 500 kV for the loss of McKnight - Coly 500 kV |
|
Acrobat |
46 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 31, 2009 — Flowgate 1324 — White Bluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
54 KB |
1/27/10 |
ICTE Initial Investigation Report —
December 26, 2009 — Flowgate 1324 — White Bluff - Sheridan 500 kV for the loss of Mabelvale - Sheridan 500 kV |
|
Acrobat |
40 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 22, 2009 — Flowgate 1902 — Scott-Bonin 138 kV for the loss of T J Labbe-Bonin 230 kV |
|
Acrobat |
40 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 6, 2009 — Flowgate 1902 — Scott-Bonin 138 kV for the loss of T J Labbe-Bonin 230 kV |
|
Acrobat |
41 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 14, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
45 KB |
1/27/10 |
ICTE Initial Investigation Report —
October 5, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
38 KB |
1/27/10 |
ICTE Initial Investigation Report —
August 18, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
38 KB |
1/27/10 |
ICTE Initial Investigation Report —
August 25, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
42 KB |
1/27/10 |
ICTE Initial Investigation Report —
August 28, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
56 KB |
1/27/10 |
MISO Initial Investigation Report —
October 13, 2009 — Flowgate 6072 — Letellier-Drayton 230kV PTDF |
|
Acrobat |
59 KB |
1/27/10 |
MISO Initial Investigation Report —
October 11, 2009 — Flowgate 6072 — Letellier-Drayton 230kV PTDF |
|
Acrobat |
44 KB |
1/27/10 |
MISO Initial Investigation Report —
October 26, 2009 — Flowgate 6160 — Laverendrye-Letellier 230kV flo Dorsey-St Leon 230kV Interface |
|
Acrobat |
71 KB |
1/27/10 |
MISO Initial Investigation Report —
October 28, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
52 KB |
1/27/10 |
MISO Initial Investigation Report —
October 26, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
297 KB |
11/20/09 |
SPP Initial Investigation Report —
October 18, 2009 — Flowgate 6009 — COOPER_S |
|
Acrobat |
141 KB |
11/20/09 |
SPP Initial Investigation Report —
September 21, 2009 — Flowgate 15940 — Osage Switch – Canyon East 115 kV for loss of Bushland – Deaf Smith 230 kV |
|
Acrobat |
100 KB |
11/20/09 |
SPP Initial Investigation Report —
October 7, 2009 — Flowgate 16019 — Redbud – Arcadia 345 kV CKT 2 |
|
Acrobat |
120 KB |
11/20/09 |
SPP Initial Investigation Report —
October 9, 2009 — Flowgate 5196 — SPS North - South |
|
Acrobat |
127 KB |
11/20/09 |
SPP Initial Investigation Report —
September 27, 2009 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV |
|
Acrobat |
112 KB |
11/20/09 |
SPP Initial Investigation Report —
September 21, 2009 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
86 KB |
11/20/09 |
SPP Initial Investigation Report —
October 9, 2009 — Flowgate 5014 — Elk City 230/138 kV Transformer for the loss of Tuco – Oklaunion 345 kV Line |
|
Acrobat |
119 KB |
11/20/09 |
SPP Initial Investigation Report —
October 7, 2009 — Flowgate 5014 — Elk City 230/138 kV Transformer for the loss of Tuco – Oklaunion 345 kV Line |
|
Acrobat |
49 KB |
11/20/09 |
MISO Initial Investigation Report —
September 27, 2009 — Flowgate 6061 — Richer-Moranville 230kV (R50M) |
|
Acrobat |
50 KB |
11/20/09 |
MISO Initial Investigation Report —
September 30, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
51 KB |
11/20/09 |
MISO Initial Investigation Report —
September 28, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
47 KB |
11/20/09 |
MISO Initial Investigation Report —
September 25, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
49 KB |
11/20/09 |
MISO Initial Investigation Report —
October 1, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
44 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 20, 2009 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Weber- Wells 500 kV |
|
Acrobat |
34 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 6, 2009 — Flowgate 1911 — Hartburg-Inland Orange 230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
37 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 20, 2009 — Flowgate 1903 — Cecelia-Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
40 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 14, 2009 — Flowgate 15008 — Nelson XF 500/230 for the loss of Cypress-Hartburg 500 kV |
|
Acrobat |
43 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 15, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
47 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 14, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
43 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 13, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
43 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 11, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
44 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 10, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
44 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 7, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
42 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 6, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
43 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 5, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
43 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 4, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
38 KB |
10/28/09 |
ICTE Initial Investigation Report —
August 3, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
123 KB |
10/07/09 |
SPP Initial Investigation Report —
August 30, 2009 — Flowgate 15940 — Osage Switch – Canyon East 115 kV for loss of Bushland – Deaf Smith 230 kV |
|
Acrobat |
113 KB |
10/07/09 |
SPP Initial Investigation Report —
August 26, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2 |
|
Acrobat |
106 KB |
10/07/09 |
SPP Initial Investigation Report —
August 30, 2009 — Flowgate 5242 — Okmulgee – Henryetta 138 kV for loss of Okmulgee – Kelco 138 kV |
|
Acrobat |
198 KB |
10/07/09 |
SPP Initial Investigation Report —
August 8, 2009 — Flowgate 6145 — Lake Rd. – Alabama 161 kV for loss of Iatan – Stranger Creek 345 kV |
|
Acrobat |
105 KB |
10/07/09 |
SPP Initial Investigation Report —
August 6, 2009 — Flowgate 5290 — Powell – Linwood 138 kV for loss of SW Shreveport – Western Electric 138 kV |
|
Acrobat |
80 KB |
10/07/09 |
SPP Initial Investigation Report —
August 27, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV |
|
Acrobat |
76 KB |
10/07/09 |
SPP Initial Investigation Report —
August 26, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV |
|
Acrobat |
104 KB |
10/07/09 |
SPP Initial Investigation Report —
August 25, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV |
|
Acrobat |
109 KB |
10/07/09 |
SPP Initial Investigation Report —
August 12, 2009 — Flowgate 15943 — KSG12 - Hals 138 kV for loss of Reno – Wich 345 kV |
|
Acrobat |
102 KB |
10/07/09 |
SPP Initial Investigation Report —
August 7, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
177 KB |
10/07/09 |
SPP Initial Investigation Report —
August 5-7, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
108 KB |
10/07/09 |
SPP Initial Investigation Report —
August 5, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
91 KB |
10/07/09 |
SPP Initial Investigation Report —
August 1, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
43 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 5, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
43 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 6, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
78 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 1, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
41 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 3, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
41 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 4, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
47 KB |
10/07/09 |
MISO Initial Investigation Report —
August 23, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
45 KB |
10/07/09 |
MISO Initial Investigation Report —
July 30, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
117 KB |
10/07/09 |
SPP Initial Investigation Report —
July 2, 2009 — Flowgate 5242 — Okmulgee – Henryetta 138 kV for loss of Okmulgee – Kelco 138 kV |
|
Acrobat |
125 KB |
10/07/09 |
SPP Initial Investigation Report —
July 2, 2009 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
104 KB |
10/07/09 |
SPP Initial Investigation Report —
July 20, 2009 — Flowgate 15911 — Arcadia 345/138 kV Transformer for loss of Arcadia – Northwestern 345 kV |
|
Acrobat |
89 KB |
10/07/09 |
SPP Initial Investigation Report —
June 11, 2009 — Flowgate 15844 — Temp 04 Roosevelt – Oasis 230 kV for the loss of Tolksub – Eddy County 345 kV |
|
Acrobat |
91 KB |
10/07/09 |
SPP Initial Investigation Report —
June 23, 2009 — Flowgate 15882 — Longwood – Noram 138 kV for the loss of Longwood – Lieberman 138 kV |
|
Acrobat |
133 KB |
10/07/09 |
SPP Initial Investigation Report —
June 17-18, 2009 — Flowgate 15826 — Temp 10 Summit – Exide Jct. 115 kV for the loss of Summit – E. McPherson 230 kV |
|
Acrobat |
140 KB |
10/07/09 |
SPP Initial Investigation Report —
June 2, 2009 — Flowgate 5014 — Elk City 230/138 kV Transformer for the loss of Tuco – Oklaunion 345 kV Line |
|
Acrobat |
212 KB |
10/07/09 |
SPP Initial Investigation Report —
July 30-31, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
108 KB |
10/07/09 |
SPP Initial Investigation Report —
July 25, 2009 — Flowgate 5354 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
116 KB |
10/07/09 |
SPP Initial Investigation Report —
June 5, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
245 KB |
10/07/09 |
SPP Initial Investigation Report —
June 3, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
345 KB |
10/07/09 |
SPP Initial Investigation Report —
July 26, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
322 KB |
10/07/09 |
SPP Initial Investigation Report —
July 24-25, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
313 KB |
10/07/09 |
SPP Initial Investigation Report —
July 14-16, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
337 KB |
10/07/09 |
SPP Initial Investigation Report —
July 16-17, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
168 KB |
10/07/09 |
SPP Initial Investigation Report —
July 13, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
164 KB |
10/07/09 |
SPP Initial Investigation Report —
July 09, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
396 KB |
10/07/09 |
SPP Initial Investigation Report —
July 11-12, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
188 KB |
10/07/09 |
SPP Initial Investigation Report —
July 7, 2009 — Flowgate 6007 — Gentleman – Red Willow 345 kV |
|
Acrobat |
100 KB |
10/07/09 |
SPP Initial Investigation Report —
June 2, 2009 — Flowgate 15776 — Temp 08 Sooner 345/138 kV Transformer for the loss of Sooner – Woodring 345kV |
|
Acrobat |
130 KB |
10/07/09 |
SPP Initial Investigation Report —
June 1, 2009 — Flowgate 15776 — Temp 08 Sooner 345/138 kV Transformer for the loss of Sooner – Woodring 345kV |
|
Acrobat |
122 KB |
10/07/09 |
SPP Initial Investigation Report —
June 4, 2009 — Flowgate 15812 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
121 KB |
10/07/09 |
SPP Initial Investigation Report —
June 2, 2009 — Flowgate 15812 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
110 KB |
10/07/09 |
SPP Initial Investigation Report —
June 1, 2009 — Flowgate 15812 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
113 KB |
10/07/09 |
SPP Initial Investigation Report —
July 9-10, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
137 KB |
10/07/09 |
SPP Initial Investigation Report —
July 21-22, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
102 KB |
10/07/09 |
SPP Initial Investigation Report —
July 21, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
187 KB |
10/07/09 |
SPP Initial Investigation Report —
July 19-20, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
218 KB |
10/07/09 |
SPP Initial Investigation Report —
July 16-17, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
152 KB |
10/07/09 |
SPP Initial Investigation Report —
July 14-15, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
101 KB |
10/07/09 |
SPP Initial Investigation Report —
July 14, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
111 KB |
10/07/09 |
SPP Initial Investigation Report —
July 13, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
184 KB |
10/07/09 |
SPP Initial Investigation Report —
July 11-12, 2009 — Flowgate 15849 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
121 KB |
10/07/09 |
SPP Initial Investigation Report —
July 10, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2 |
|
Acrobat |
113 KB |
10/07/09 |
SPP Initial Investigation Report —
July 6, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2 |
|
Acrobat |
104 KB |
10/07/09 |
SPP Initial Investigation Report —
July 1, 2009 — Flowgate 5207 — Redbud – Arcadia 345 kV Circuit 1 for loss of Redbud – Arcadia 345 kV Circuit 2 |
|
Acrobat |
125 KB |
10/07/09 |
SPP Initial Investigation Report —
June 14, 2009 — Flowgate 15857 — Northwestern – Cimarron 345 kV for the loss of Woodring – Cimarron 345 kV |
|
Acrobat |
264 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 14, 2009 — Flowgate 1938 — Sheridan-El Dorado 500 kV for the loss of Etta-McNeil 500 kV |
|
Acrobat |
11 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 14, 2009 — Flowgate 1911 — Hartburg-Inland Orange 230 kV for the loss of Hartburg-Cypress 500 kV |
|
Acrobat |
64 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 19, 2009 — Flowgate 1903 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
66 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 20, 2009 — Flowgate 1903 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
37 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 21, 2009 — Flowgate 1903 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
69 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 26, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
44 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 20, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
41 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 2, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
34 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 15, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
61 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 10, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
44 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 13, 2009 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams -Lakeover 500 kV |
|
Acrobat |
37 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 20, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
48 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 14, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
46 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 13, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
47 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 11, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
41 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 10, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
42 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 24, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
40 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 25, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
39 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 27, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
37 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 28, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
44 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 29, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
42 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 30, 2009 — Flowgate 15909 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
41 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 9, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
41 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 8, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
44 KB |
10/07/09 |
ICTE Initial Investigation Report —
July 2, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
80 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 21, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
81 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 30, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
83 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 29, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
87 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 26, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
88 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 25, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
94 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 24, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
84 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 23, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
93 KB |
10/07/09 |
ICTE Initial Investigation Report —
June 22, 2009 — Flowgate 15878 — North Crowley - Scott 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
126 KB |
10/07/09 |
ICTE Initial Investigation Report —
May 2, 2009 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta - McNeil 500 kV |
|
Acrobat |
170 KB |
10/07/09 |
ICTE Initial Investigation Report —
May 10, 2009 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta - McNeil 500 kV |
|
Acrobat |
77 KB |
10/07/09 |
ICTE Initial Investigation Report —
May 6, 2009 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells - Pont Des Mouton 230 kV |
|
Acrobat |
115 KB |
10/07/09 |
ICTE Initial Investigation Report —
May 12, 2009 — Flowgate 1968 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV |
|
Acrobat |
47 KB |
10/07/09 |
MISO Initial Investigation Report —
July 18, 2009 — Flowgate 6072 — Letellier-Drayton 230kV (L20D) Interface Proxy for Drayton TR1 for the loss of Drayton TR2 230/115kV |
|
Acrobat |
53 KB |
10/07/09 |
MISO Initial Investigation Report —
June 27, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV |
|
Acrobat |
181 KB |
07/24/09 |
SPP Initial Investigation Report —
May 17, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
141 KB |
07/24/09 |
SPP Initial Investigation Report —
May 18-19, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
136 KB |
07/24/09 |
SPP Initial Investigation Report —
May 16, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
118 KB |
07/24/09 |
SPP Initial Investigation Report —
May 15, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
210 KB |
07/24/09 |
SPP Initial Investigation Report —
May 12-14, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
427 KB |
07/24/09 |
SPP Initial Investigation Report —
May 19, 2009 — Flowgate 15622 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
221 KB |
07/24/09 |
SPP Initial Investigation Report —
May 30, 2009 — Flowgate 15815 — Temp 6 Woodring 345/138 kV Transformer for the loss of Woodring – Cimarron 345 kV line |
|
Acrobat |
111 KB |
07/24/09 |
SPP Initial Investigation Report —
May 28, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2 |
|
Acrobat |
127 KB |
07/24/09 |
SPP Initial Investigation Report —
May 30, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2 |
|
Acrobat |
115 KB |
07/24/09 |
SPP Initial Investigation Report —
May 26, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2 |
|
Acrobat |
121 KB |
07/24/09 |
SPP Initial Investigation Report —
May 29, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2 |
|
Acrobat |
88 KB |
07/24/09 |
SPP Initial Investigation Report —
May 7, 2009 — Flowgate 15765 — Temp 07 Kress-Hale Co. 115kV for the loss of Swisher-Tuco 230kV |
|
Acrobat |
273 KB |
07/24/09 |
SPP Initial Investigation Report —
May 28-29, 2009 — Flowgate 15815 — Temp 6 Woodring 345/138 kV Transformer for the loss of Woodring – Cimarron 345 kV line |
|
Acrobat |
121 KB |
07/24/09 |
SPP Initial Investigation Report —
May 29, 2009 — Flowgate 15812 — Temp 20 Arcadia 345/138 kV Transformer 1 for the loss of Arcadia 345/138 kV Transformer 2 |
|
Acrobat |
116 KB |
07/24/09 |
SPP Initial Investigation Report —
May 28, 2009 — Flowgate 15776 — Temp 08 Sooner 345/138 kV Transformer for the loss of Sooner – Woodring 345kV |
|
Acrobat |
115 KB |
07/24/09 |
ICTE Initial Investigation Report —
May 12, 2009 — Flowgate 1968 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV |
|
Acrobat |
170 KB |
07/24/09 |
ICTE Initial Investigation Report —
May 10, 2009 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta - McNeil 500 kV |
|
Acrobat |
49 KB |
07/24/09 |
MISO Initial Investigation Report —
June 23, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV |
|
Acrobat |
52 KB |
07/24/09 |
MISO Initial Investigation Report —
June 22, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV |
|
Acrobat |
52 KB |
07/24/09 |
MISO Initial Investigation Report —
June 21, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV |
|
Acrobat |
47 KB |
07/24/09 |
MISO Initial Investigation Report —
June 19, 2009 — Flowgate 6199 — Council Bluffs-River Bend 161kV flo Cooper-St Joe 345kV |
|
Acrobat |
57 KB |
07/24/09 |
MISO Initial Investigation Report —
June 18, 2009 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
56 KB |
07/24/09 |
MISO Initial Investigation Report —
June 17, 2009 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
45 KB |
07/24/09 |
MISO Initial Investigation Report —
June 11, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
47KB |
07/24/09 |
MISO Initial Investigation Report —
May 31, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
58 KB |
07/24/09 |
MISO Initial Investigation Report —
May 29, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
43 KB |
06/23/09 |
MISO Initial Investigation Report —
May 9, 2009 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
45 KB |
06/23/09 |
MISO Initial Investigation Report —
May 20, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
42 KB |
06/23/09 |
MISO Initial Investigation Report —
May 8, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
121 KB |
06/23/09 |
ICTE Initial Investigation Report —
June 11, 2009 — Flowgate 1968 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV |
|
Acrobat |
68 KB |
06/23/09 |
ICTE Initial Investigation Report —
April 25, 2009 — Flowgate 15732 — Willow Glen 500/230 AT2 for the loss of Willow Glen-Waterford 500 kV |
|
Acrobat |
485 KB |
06/23/09 |
ICTE Initial Investigation Report —
April 22, 2009 — Flowgate 1948 — Paragould - Monette Junction 161 kV for the loss of Independence - Dell 500 kV |
|
Acrobat |
218 KB |
06/23/09 |
ICTE Initial Investigation Report 2 —
April 20, 2009 — Flowgate 1948 — Paragould - Monette Junction 161 kV for the loss of Independence - Dell 500 kV |
|
Acrobat |
208 KB |
06/23/09 |
ICTE Initial Investigation Report 2 —
April 20, 2009 — Flowgate 1345 — Mabelvale - Bryant 115 kV for the loss of Sheridan - El Dorado 500 kV |
|
Acrobat |
60 KB |
06/23/09 |
ICTE Initial Investigation Report 1 —
April 20, 2009 — Flowgate 1345 — Mabelvale - Bryant 115 kV for the loss of Sheridan - El Dorado 500 kV |
|
Acrobat |
46 KB |
06/01/09 |
ICTE Initial Investigation Report —
March 14, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
46 KB |
06/01/09 |
ICTE Initial Investigation Report —
March 11, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
46 KB |
06/01/09 |
ICTE Initial Investigation Report —
March 10, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
46 KB |
06/01/09 |
ICTE Initial Investigation Report —
March 12, 2009 — Flowgate 1347 — Wilbert - Livonia Bulk 138 kV for the loss of Webre - Wells 500 kV |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
March 12, 2009 — Flowgate 15679 — Longwood 345:138 kV XF for the loss of SW Shreveport 345:138 kV XF |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
April 23, 2009 — Flowgate 15622 — Randall-Palo Duro 115kV for the loss of Amarillo-Swisher 230kV |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
January 29, 2009 — Flowgate 15575 — Pecan Creek – Five Tribes 161 kV for the Loss of Pecan Creek – Agency 161kV Line |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
February 1, 2009 — Flowgate 15369 — Plant X – Sundown 230 kV Line for the Loss of Tolk – Yoakum 230 kV Line |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
March 3, 2009 — Flowgate 15553 — Flint Creek-Decatur 161 kV for the loss of Flint Creek-Brookline 345 kV |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
January 28, 2009 — Flowgate 5247 — SPPSPSTIES |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
March 2, 2009 — Flowgate 5073 — Bartlesville SE – N. Bartlesville 138 kV Line for loss of Northeastern – Delaware 345 kV |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
January 7, 2009 — Flowgate 15524 — Pecan 161/138 kV Transformer for the Loss of Sand Springs – Prattville 138 kV Line |
|
Acrobat |
46 KB |
06/01/09 |
SPP Initial Investigation Report —
February 2, 2009 — Flowgate 15613 — Sikeston – Idalia 161 kV Line for the Loss of New Madrid – Tipton 161 kV Line |
|
Acrobat |
46 KB |
06/01/09 |
MISO Initial Investigation Report —
April 19, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
46 KB |
06/01/09 |
MISO Initial Investigation Report —
April 13, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
46 KB |
04/27/09 |
MISO Initial Investigation Report —
March 26, 2009 — Flowgate 6100 — MHEB_SPC_W Interface |
|
Acrobat |
49 KB |
04/27/09 |
MISO Initial Investigation Report —
April 5, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
46 KB |
04/27/09 |
MISO Initial Investigation Report —
January 27, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
64 KB |
04/27/09 |
ICTE Initial Investigation Report —
March 3, 2009 — Flowgate 1941 — Greenbrier - Quitman 161 kV for the loss of Pleasant Hills - Mayflower 500 kV |
|
Acrobat |
75 KB |
04/27/09 |
ICTE Initial Investigation Report —
March 3, 2009 — Flowgate 1355 — Little Gypsy - Fairview 230 kV for the loss of McKnight - Franklin 500 kV |
|
Acrobat |
105 KB |
03/09/09 |
ICTE Initial Investigation Report —
January 29, 2009 — Flowgate 15565 — Quitman - Heber Springs 161 kV for the loss of Newport - Newport Industrial 161
kV |
|
Acrobat |
44 KB |
03/09/09 |
ICTE Initial Investigation Report —
February 17, 2009 — Flowgate 1962 — Nelson - Lake Charles Bulk 138 kV for the loss of Nelson - Richard 500 kV |
|
Acrobat |
76 KB |
03/09/09 |
ICTE Initial Investigation Report —
January 16, 2009 — Flowgate 15544 — Sheridan - Mabelvale 500 kV for the loss of White Bluff - Keo 500 kV |
|
Acrobat |
46 KB |
03/09/09 |
MISO Initial Investigation Report —
January 21, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
46 KB |
03/09/09 |
MISO Initial Investigation Report —
January 26, 2009 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
60 KB |
03/09/09 |
MISO Initial Investigation Report —
January 08, 2009 — Flowgate 6190 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV |
|
Acrobat |
133 KB |
02/05/09 |
SPP Initial Investigation Report —
December 17, 2008 — Flowgate 5078 — S. Coffeyville – Dearing 138 kV for the loss of Delaware – Neosho 345 kV |
|
Acrobat |
106 KB |
02/05/09 |
SPP Initial Investigation Report —
November 14, 2008 — Flowgate 15437 — Flint Creek – Chambers 161kV for loss of Flint Creek – S. Springs 161kV |
|
Acrobat |
626 KB |
02/05/09 |
SPP Initial Investigation Report —
November 27-December 1, 2008 — Flowgate 15369 — Plant X – Sundown 230kV for loss of Tolk – Yoakum 230kV |
|
Acrobat |
140 KB |
02/05/09 |
SPP Initial Investigation Report —
December 7, 2008 — Flowgate 15337 — Kress – Hale Co. 115kV for loss of Swisher – Tuco 230kV |
|
Acrobat |
304 KB |
02/05/09 |
SPP Initial Investigation Report —
November 29-30, 2008 — Flowgate 15337 — Kress – Hale Co. 115kV for loss of Swisher – Tuco 230kV |
|
Acrobat |
201 KB |
02/05/09 |
SPP Initial Investigation Report —
November 18, 2008 — Flowgate 15431 — Dyess – East Rogers 161kV for loss of Lowell – Tontitown 161kV |
|
Acrobat |
150 KB |
02/05/09 |
SPP Initial Investigation Report —
November 10, 2008 — Flowgate 15431 — Dyess – East Rogers 161kV for loss of Lowell – Tontitown 161kV |
|
Acrobat |
138 KB |
02/05/09 |
SPP Initial Investigation Report —
November 5, 2008 — Flowgate 5203 — N. American Philips – W. McPherson 115 kV for loss of E. McPherson – Summit 230 kV |
|
Acrobat |
430 KB |
02/05/09 |
SPP Initial Investigation Report —
November 9, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
154 KB |
02/05/09 |
SPP Initial Investigation Report —
November 5, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
181 KB |
02/05/09 |
SPP Initial Investigation Report —
November 3, 2008 — Flowgate 5203 — N. American Philips – W. McPherson 115 kV for loss of E. McPherson – Summit 230 kV |
|
Acrobat |
192 KB |
02/05/09 |
SPP Initial Investigation Report —
November 4, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
253 KB |
02/05/09 |
SPP Initial Investigation Report —
November 14, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
253 KB |
02/05/09 |
SPP Initial Investigation Report —
November 25, 2008 — Flowgate 15369 — Plant X – Sundown 230kV for loss of Tolk – Yoakum 230kV |
|
Acrobat |
301 KB |
02/05/09 |
SPP Initial Investigation Report —
December 13-14, 2008 — Flowgate 15369 — Plant X – Sundown 230kV for loss of Tolk – Yoakum 230kV |
|
Acrobat |
50 KB |
02/05/09 |
MISO Initial Investigation Report —
January 03, 2009 — Flowgate 3766 — Dundee-Hazelton 161kV flo Arnold-Hazelton 345kV |
|
Acrobat |
107 KB |
01/23/09 |
ICTE Initial Investigation Report —
January 15, 2009 — Flowgate 15544 — Sheridan=Mabelvale 500 kV for the loss of White Bluff-Keo 500 kV |
|
Acrobat |
72 KB |
01/23/09 |
ICTE Initial Investigation Report —
January 11, 2009 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
68 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 10, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
183 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 15, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
93 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 21, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
70 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 29, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
71 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 23, 2008 — Flowgate 1347 — Wilbert-Livonia Bulk 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
128 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 10, 2008 — Flowgate 1309 — Terrebonne - Greenwood 115 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
53 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 11, 2008 — Flowgate 14870 — Fancy Auto 500/230 kV for the loss of Big Cajun 2 - Webre 500 kV |
|
Acrobat |
58 KB |
01/23/09 |
ICTE Initial Investigation Report —
December 05, 2008 — Flowgate 1911 — Hartburg - Inland Orange 230 kV for the loss of Hartburg - Cypress 500 kV |
|
Acrobat |
57 KB |
01/23/09 |
MISO Initial Investigation Report —
December 21, 2008 — Flowgate 6190 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV |
|
Acrobat |
53 KB |
01/23/09 |
MISO Initial Investigation Report —
December 10, 2008 — Flowgate 6126 — Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV |
|
Acrobat |
54 KB |
12/17/08 |
MISO Initial Investigation Report —
November 5, 2008 — Flowgate 6009 — Cooper South Interface |
|
Acrobat |
67 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 17, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for loss of Webre-Wells 500 kV |
|
Acrobat |
65 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 21, 2008 — Flowgate 15451 — ANO 500/161 Xfmr for loss of ANO-Mabelvale 500 kV |
|
Acrobat |
61 KB |
12/17/08 |
ICTE Initial Investigation Report —
December 2, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
100 KB |
12/17/08 |
ICTE Initial Investigation Report —
October 18, 2008 — Flowgate 1938 — Sheridan-El Dorado 500 kV for the loss of Etta-McNeil 500 kV |
|
Acrobat |
96 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 6, 2008 — Flowgate 1347 — Mt. Olive – Hartburg 500 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
88 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 11, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
74 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 12, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
64 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 16, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for loss of Webre-Wells 500 kV |
|
Acrobat |
66 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 16, 2008 — Flowgate 1347 — Wilbert-Livonia 138 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
79 KB |
12/17/08 |
ICTE Initial Investigation Report —
November 16, 2008 — Flowgate 15429 — Hilltop-Marshall 161 kV for loss of Russellville - Dardanelle Dam 161 kV |
|
Acrobat |
292 KB |
11/20/08 |
SPP Initial Investigation Report —
September 18-19, 2008 — Flowgate 15323 — Harrington – Nichols 230 kV for loss of Harrington – Nichols 230 kV |
|
Acrobat |
151 KB |
11/20/08 |
SPP Initial Investigation Report —
September 21, 2008 — Flowgate 15323 — Harrington – Nichols 230 kV for loss of Harrington – Nichols 230 kV |
|
Acrobat |
180 KB |
11/20/08 |
SPP Initial Investigation Report —
September 13, 2008 — Flowgate 15317 — N. Texas – Whitney 138 kV for loss of Pirkey – Diana 345 kV |
|
Acrobat |
186 KB |
11/20/08 |
SPP Initial Investigation Report —
September 13-14, 2008 — Flowgate 15316 — Diana – Lonestar South 138 kV for loss of Wilkes – Welsh 345 kV |
|
Acrobat |
153 KB |
11/20/08 |
SPP Initial Investigation Report —
September 14, 2008 — Flowgate 15317 — N. Texas – Whitney 138 kV for loss of Pirkey – Diana 345 kV |
|
Acrobat |
117 KB |
11/20/08 |
SPP Initial Investigation Report —
September 17, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV |
|
Acrobat |
148 KB |
11/20/08 |
SPP Initial Investigation Report —
September 16, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV |
|
Acrobat |
199 KB |
11/20/08 |
SPP Initial Investigation Report —
September 11, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV |
|
Acrobat |
160 KB |
11/20/08 |
SPP Initial Investigation Report —
September 8, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV |
|
Acrobat |
169 KB |
11/20/08 |
SPP Initial Investigation Report —
September 9, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV |
|
Acrobat |
141 KB |
11/20/08 |
SPP Initial Investigation Report —
October 4, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV) |
|
Acrobat |
150 KB |
11/20/08 |
SPP Initial Investigation Report —
October 5, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV) |
|
Acrobat |
180 KB |
11/20/08 |
SPP Initial Investigation Report —
October 21, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV) |
|
Acrobat |
138 KB |
11/20/08 |
SPP Initial Investigation Report —
September 12, 2008 — Flowgate 15290 — Arcadia 345/138 kV Transformer A for loss of Northwest – Arcadia 345 kV |
|
Acrobat |
161 KB |
11/20/08 |
SPP Initial Investigation Report —
September 11, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
218 KB |
11/20/08 |
SPP Initial Investigation Report —
October 22, 2008 — Flowgate 5203 — Hugo Power Plant – Valliant 138kV for loss of Pittsburg – Valliant 345kV |
|
Acrobat |
99 KB |
11/20/08 |
TVA Initial Investigation Report —
January 9, 2008 — Flowgate 1377 — Fairport - Lathrop 161 KV (flo) Iatan - Stranger 345 KV + Lake Rd. - Nashua 161 KV |
|
Acrobat |
82 KB |
11/20/08 |
TVA Initial Investigation Report —
July 05, 2008 — Flowgate 15196 — Stoddard - Essex 161 KV (flo) New Madrid - Essex - Lutesville 345 KV |
|
Acrobat |
107 KB |
11/20/08 |
TVA Initial Investigation Report —
June 13, 2008 — Flowgate 15134 — Shawnee - Northeast Area 161 KV (flo) Shawnee - Marshall 500 KV |
|
Acrobat |
85 KB |
11/20/08 |
TVA Initial Investigation Report —
April 9, 2008 — Flowgate 15006 — Lebanon - Orla 161 KV (flo) Huben - Marshfield 161 KV |
|
Acrobat |
83 KB |
11/20/08 |
TVA Initial Investigation Report —
April 8, 2008 — Flowgate 15007 — Huben - Marshfield 161 KV (flo) Lebanon - Mansfield 161 KV |
|
Acrobat |
86 KB |
11/20/08 |
TVA Initial Investigation Report —
April 8, 2008 — Flowgate 15011 — Huben - Marshfield 161 KV |
|
Acrobat |
84 KB |
11/20/08 |
TVA Initial Investigation Report —
February 15, 2008 — Flowgate 14897 — New Hardinsburg - Hardinsburg 138 KV (flo) Cloverport - Hardinsburg 138 KV |
|
Acrobat |
83 KB |
11/20/08 |
TVA Initial Investigation Report —
February 14, 2008 — Flowgate 14897 — New Hardinsburg - Hardinsburg 138 KV (flo) Cloverport - Hardinsburg 138 KV |
|
Acrobat |
96 KB |
11/20/08 |
TVA Initial Investigation Report —
January 8, 2008 — Flowgate 1377 — Fairport - Lathrop 161 KV (flo) Iatan - Stranger 345 KV + Lake Rd. - Nashua 161 KV |
|
Acrobat |
69 KB |
10/28/08 |
ICTE Initial Investigation Report —
October 16, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
68 KB |
10/28/08 |
ICTE Initial Investigation Report —
October 10, 2008 — Flowgate 15008 — Nelson AT1 500/230 kV for the loss of Hartburg-Cypress 500 kV |
|
Acrobat |
88 KB |
10/28/08 |
ICTE Initial Investigation Report —
October 6, 2008 — Flowgate 15008 — Nelson AT1 500/230 kV for the loss of Hartburg-Cypress 500 kV |
|
Acrobat |
105 KB |
10/28/08 |
ICTE Initial Investigation Report —
October 4, 2008 — Flowgate 1938 — Sheridan - El Dorado 500 kV for the loss of Etta-McNeil 500 kV |
|
Acrobat |
89 KB |
10/28/08 |
ICTE Initial Investigation Report —
October 1, 2008 — Flowgate 15328 — Addis Tiger 230 kV for the loss of Fancy Point McKnight 500 kV |
|
Acrobat |
85 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 26, 2008 — Flowgate 15328 — Addis Tiger 230 kV for the loss of Fancy Point McKnight 500 kV |
|
Acrobat |
67 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 25, 2008 — Flowgate 15328 — Addis Tiger 230 kV for the loss of Fancy Point McKnight 500 kV |
|
Acrobat |
64 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 15, 2008 — Flowgate 1910 — Fancy Auto 500/230 kV for the loss of Coly - McKnight 500 kV |
|
Acrobat |
80 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 14, 2008 — Flowgate 15304 — Baxter Wilson - Ray Braswell 500 kV for the loss of Grand Gulf - Franklin 500 kV |
|
Acrobat |
58 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 11, 2008 — Flowgate 1910 — Fancy Auto 500/230 kV for the loss of Coly - McKnight 500 kV |
|
Acrobat |
73 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 8, 2008 — Flowgate 1910 — Fancy Auto 500/230 kV for the loss of Coly - McKnight 500 kV |
|
Acrobat |
73 KB |
10/28/08 |
ICTE Initial Investigation Report —
September 8, 2008 — Flowgate 1902 — Scott-Bonin 138 kV for the loss of TJ Labbe-Bonin 230 kV |
|
Acrobat |
83 KB |
10/28/08 |
ICTE Initial Investigation Report —
August 28, 2008 — Flowgate 1330 — McAdams 500-230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
69 KB |
10/28/08 |
MISO Initial Investigation Report —
August 13, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
97 KB |
9/22/08 |
ICTE Initial Investigation Report —
August 12, 2008 — Flowgate 1388 — Mt. Olive - Hartburg for the loss of Webre - Wells |
|
Acrobat |
260 KB |
11/20/08 |
IESO Initial Investigation Report —
August 11-12, 2008 — Flowgate 9160 — ONT-NYIS |
|
Acrobat |
161 KB |
9/22/08 |
ICTE Initial Investigation Report —
August 10, 2008 — Flowgate 1388 — Mt. Olive - Hartburg for the loss of Webre - Wells |
|
Acrobat |
54 KB |
9/22/08 |
ICTE Initial Investigation Report —
August 9, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
51 KB |
10/28/08 |
MISO Initial Investigation Report —
August 06, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
80 KB |
9/22/08 |
ICTE Initial Investigation Report —
August 5, 2008 — Flowgate 15239 — Sheridan - Mabelvale 500 kV for the loss of White Bluff - Keo 500 kV |
|
Acrobat |
62 KB |
9/22/08 |
MISO Initial Investigation Report —
August 1-4, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
60 KB |
8/19/08 |
ICTE Initial Investigation Report —
July 27, 2008 — Flowgate 15243 — McAdams 500/230 Auto for the loss of Choctaw Gas - W. Point 500 kV |
|
Acrobat |
64 KB |
8/19/08 |
ICTE Initial Investigation Report —
July 27, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV |
|
Acrobat |
66 KB |
8/19/08 |
ICTE Initial Investigation Report —
July 25, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV |
|
Acrobat |
55 KB |
9/22/08 |
MISO Initial Investigation Report —
July 24-26, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
60 KB |
8/19/08 |
ICTE Initial Investigation Report —
July 24, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV |
|
Acrobat |
44 KB |
9/22/08 |
MISO Initial Investigation Report —
July 23, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
51 KB |
9/22/08 |
MISO Initial Investigation Report —
July 22, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
89 KB |
7/30/08 |
ICTE Initial Investigation Report —
July 20, 2008 — Flowgate 14782 — Scott - Semere 138 kV for the loss of Wells-Pont Des Mouton 230 kV |
|
Acrobat |
57 KB |
8/19/08 |
MISO Initial Investigation Report —
July 14, 2008 — Flowgate 6190 — Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV |
|
Acrobat |
77 KB |
8/19/08 |
ICTE Initial Investigation Report —
July 3, 2008 — Flowgate 1309 — Terrebonne - Greenwood 115 kV for the loss of Webre – Wells 500 kV |
|
Acrobat |
77 KB |
7/30/08 |
ICTE Initial Investigation Report —
July 3, 2008 — Flowgate 1388 — Terrebonne - Greenwood for the loss of Webre – Wells 500 kV |
|
Acrobat |
89 KB |
7/30/08 |
ICTE Initial Investigation Report —
July 2, 2008 — Flowgate 1388 — Mt. Olive – Hartburg 500 kV for the loss of Webre – Wells 500 kV |
|
Acrobat |
69 KB |
6/27/08 |
ICTE Initial Investigation Report —
June 24, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
43 KB |
7/30/08 |
MISO Initial Investigation Report —
June 10, 2008 — Flowgate 6072 — Letellier-Drayton 230kV (L20D) |
|
Acrobat |
54 KB |
6/27/08 |
ICTE Initial Investigation Report —
June 09, 2008 — Flowgate 15127 — Bull Shoals - Midway 161kVfor the loss of Independence - Moorefield 161kV |
|
Acrobat |
41 KB |
7/30/08 |
MISO Initial Investigation Report —
June 07, 2008 — Flowgate 6175 — Wabaco- Rochester 161kV flo Prairie Island-Byron 345kV |
|
Acrobat |
43 KB |
6/27/08 |
MISO Initial Investigation Report —
June 07, 2008 — Flowgate 6009 — Cooper South Interface |
|
Acrobat |
49 KB |
6/27/08 |
ICTE Initial Investigation Report —
June 06, 2008 — Flowgate 15127 — Bull Shoals - Midway 161kVfor the loss of Independence - Moorefield 161kV |
|
Acrobat |
44 KB |
6/27/08 |
MISO Initial Investigation Report —
June 04, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
45 KB |
6/27/08 |
MISO Initial Investigation Report —
June 03, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
38 KB |
6/16/08 |
MISO Initial Investigation Report —
May 24, 2008 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
59 KB |
6/27/08 |
MISO Initial Investigation Report —
May 22, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
75 KB |
6/27/08 |
ICTE Initial Investigation Report —
May 22, 2008 — Flowgate 1942 — Hartburg 500/230 kV Auto for the loss of Hartburg - Cypress 500 kV) |
|
Acrobat |
75 KB |
6/16/08 |
ICTE Initial Investigation Report —
May 16, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
84 KB |
6/16/08 |
ICTE Initial Investigation Report —
May 15, 2008 — Flowgate 1903 — Cecelia - Moril 138 kV for the loss of Flanders - Hopkins 138 kV |
|
Acrobat |
70 KB |
6/11/08 |
ICTE Initial Investigation Report —
May 9, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
345 KB |
6/11/08 |
ICTE Initial Investigation Report —
May 6, 2008 — Flowgate 15064 — Mabelvale - Bryant 115 kV for the loss of Whitebluff - Sheridan 500 kV |
|
Acrobat |
202 KB |
6/11/08 |
ICTE Initial Investigation Report —
May 2, 2008 — Flowgate 15056 — Mabelvale - Bryant 115 kV for the loss of Whitebluff - Sheridan 500 kV |
|
Acrobat |
97 KB |
6/11/08 |
ICTE Initial Investigation Report —
May 2, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
87 KB |
6/11/08 |
ICTE Initial Investigation Report —
May 1, 2008 — Flowgate 1330 — McAdams AT1 500/230 kV for the loss of McAdams - Lakeover 500 kV |
|
Acrobat |
46 KB |
6/04/08 |
MISO Initial Investigation Report —
May 1, 2008 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
43 KB |
5/23/08 |
MISO Initial Investigation Report —
April 24, 2008 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
47 KB |
5/23/08 |
ICTE Initial Investigation Report —
April 22, 2008 — Flowgate 14737 — Scott - Semere 138 kV for the loss of Scott - Judice 138 kV |
|
Acrobat |
54 KB |
5/23/08 |
ICTE Initial Investigation Report —
April 21, 2008 — Flowgate 14737 — Scott - Semere 138 kV for the loss of Scott - Judice 138 kV |
|
Acrobat |
60 KB |
4/28/08 |
ICTE Initial Investigation Report —
April 10, 2008 — Flowgate 14945 — Scott-Bonin 138 kV for the loss of Wells-Pont Des Mouton 230 kV |
|
Acrobat |
83 KB |
4/28/08 |
ICTE Initial Investigation Report —
April 08, 2008 — Flowgate 15008 — Nelson XF 500/230 for the loss of Cypress-Hartburg 500 kV |
|
Acrobat |
42 KB |
4/07/08 |
MISO Initial Investigation Report —
March 31, 2008 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
54 KB |
4/28/08 |
ICTE Initial Investigation Report —
March 31, 2008 — Flowgate 14945 — Scott-Bonin 138 kV for the loss of Wells-Pont Des Mouton 230 kV |
|
Acrobat |
81 KB |
4/28/08 |
ICTE Initial Investigation Report —
March 27, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
82 KB |
4/28/08 |
ICTE Initial Investigation Report —
March 26, 2008 — Flowgate 1309 — Terrebonne-Greenwood 115 kV for the loss of Webre-Wells 500 kV |
|
Acrobat |
38 KB |
4/07/08 |
MISO Initial Investigation Report —
March 26, 2008 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
38 KB |
4/07/08 |
MISO Initial Investigation Report —
March 25, 2008 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
82 KB |
3/28/08 |
ICTE Initial Investigation Report —
March 08, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover |
|
Acrobat |
98 KB |
3/28/08 |
ICTE Initial Investigation Report —
March 06, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover |
|
Acrobat |
115 KB |
3/28/08 |
ICTE Initial Investigation Report —
March 04-05, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover |
|
Acrobat |
88 KB |
3/28/08 |
ICTE Initial Investigation Report —
February 27, 2008 — Flowgate 1330 — McAdams 500-230 for the loss of McAdams-Lakeover |
|
Acrobat |
153 KB |
2/27/08 |
ICTE Initial Investigation Report —
February 1, 2008 — Flowgate 14870 — Fancy Point Auto 500/230kv for the loss of Big Cajun 2 - Webre 500kv |
|
Acrobat |
47 KB |
2/25/08 |
MISO Initial Investigation Report —
January 24, 2008 — Flowgate 6126 — Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV |
|
Acrobat |
41 KB |
2/05/08 |
MISO Initial Investigation Report —
December 30, 2007 — Flowgate 2086 — SIGE Flowgate 2086 Newtonville 138/161 |
|
Acrobat |
49 KB |
2/05/08 |
MISO Initial Investigation Report —
December 10, 2007 — Flowgate 6116 & 14551 — 6116:Alma-Elk Mound 161kV FLO King-Eau Claire 345kV 14551:Alma-Elk Mound 161kV FLO King-Eau Claire-Arpin 345kV |
|
Acrobat |
62 KB |
1/24/08 |
MISO Initial Investigation Report —
December 5, 2007 — Flowgate 6164 — Plymouth-Sioux City 161kV flo Raun-Sioux City 345kV |
|
Acrobat |
45 KB |
1/17/08 |
MISO Initial Investigation Report —
December 4, 2007 — Flowgate 6126 — Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV |
|
Acrobat |
59 KB |
1/24/08 |
MISO Initial Investigation Report —
December 1, 2007 — Flowgate 6164 — Plymouth-Sioux City 161kV flo Raun-Sioux City 345kV |
|
Acrobat |
53 KB |
1/2/08 |
MISO Initial Investigation Report —
November 29, 2007 — Flowgate 6126 —Sub 1226-Tekamah 161kV flo Ft. Calhoun-Raun 345kV |
|
Acrobat |
57 KB |
1/2/08 |
MISO Initial Investigation Report —
November 27, 2007 — Flowgate 6146 —Tekamah-Raun 161kV flo Ft. Calhoun-Raun 345kV |
|
Acrobat |
99 KB |
12/03/07 |
MISO Initial Investigation Report —
November 16, 2007 — Flowgate 2506 — Speed - Northside 138 |
|
Acrobat |
51 KB |
1/2/08 |
MISO Initial Investigation Report —
November 8, 2007 — Flowgate 6146 — Tekamah-Raun 161kV flo Ft. Calhoun-Raun 345kV |
|
Acrobat |
41 KB |
12/17/07 |
MISO Initial Investigation Report —
November 7, 2007 — Flowgate 14660 —Rochester-Wabaco 161kV flo King-Eau Claire-Arpin 345kV |
|
Acrobat |
41 KB |
12/17/07 |
MISO Initial Investigation Report —
November 7, 2007 — Flowgate 6015 —Alma-Wabaco 161kV flo King-Eau Claire 345kV |
|
Acrobat |
44 KB |
11/28/07 |
MISO Initial Investigation Report —
October 26, 2007 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
46 KB |
1/2/08 |
MISO Initial Investigation Report #2 —
October 22, 2007 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
46 KB |
11/16/07 |
MISO Initial Investigation Report #1 —
October 22, 2007 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
64 KB |
11/16/07 |
ICTE Initial Investigation Report —
October 16-17, 2007 — Flowgate 14587 — Mabelvale-Bryant 115kV for the loss of Magnet Cove-Hot Springs 500kV |
|
Acrobat |
33 KB |
10/31/07 |
ICTE Initial Investigation Report —
September 19, 2007 — Flowgate 1309 — Terrebonne-Greenwood 115kV FTLO Webre-Wells 500kV |
|
Acrobat |
64 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 29, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
66 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 24, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
64 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 23, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
63 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 22, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
61 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 17, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
70 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 16, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
60 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 15, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
60 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 14, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
71 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 10, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
80 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 9, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
78 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 8, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
78 KB |
10/31/07 |
ICTE Initial Investigation Report —
August 7, 2007 — Flowgate 14484 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
62 KB |
10/16/07 |
MISO Initial Investigation Report —
August 8, 2007 — Flowgate 14543 — Rochester-Wabaco 161kV flo Eau Claire TR9 + Eau Claire TR9 +
King-Ea Claire-Arpin-Arpin 345kV |
|
Acrobat |
46 KB |
10/10/07 |
MISO Initial Investigation Report —
September 18, 2007 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
175 KB |
10/09/07 |
PJM Initial Investigation Report —
August 20, 2007 — Flowgate 14580 — Clubhouse-Lakeview 230kV flo Carson-Wake 500kv |
|
Acrobat |
52 KB |
10/04/07 |
MISO Initial Investigation Report —
September 5, 2007 — Flowgate 6116 — Alma-Elk Mound 161kV flo King-Eau Claire 345kV |
|
Acrobat |
51 KB |
10/03/07 |
MISO Initial Investigation Report —
August 15, 2007 — Flowgate 6007 — WNE-WKS Interface |
|
Acrobat |
54 KB |
09/26/07 |
MISO Initial Investigation Report —
August 16, 2007 — Flowgate 14551 — Alma-Elk Mound 161kV flo King-Eau Claire-Arpin 345kV |
|
Acrobat |
69 KB |
09/26/07 |
MISO Initial Investigation Report —
August 14, 2007 — Flowgate 14551 — Alma-Elk Mound 161kV flo King-Eau Claire-Arpin 345kV |
|
Acrobat |
53 KB |
09/20/07 |
MISO Initial Investigation Report —
August 10, 2007 — Flowgate 6002 — MHEX_S Interface |
Acrobat
Excel |
26
KB
45 KB |
09/10/07 |
TVA Initial Investigation Report —
August 11, 2007 — Flowgate 14555 — TVA RC for TVA Flowgate No. 14555 |
Acrobat
Excel |
33 KB
114 KB |
09/10/07 |
TVA Initial Investigation Report —
June 30, 2007 — Flowgate 14387 — TVA RC for AECI Flowgate No. 14387 |
Acrobat
Excel |
94 KB
129 KB |
09/10/07 |
TVA Initial Investigation Report —
July 10, 2007 — Flowgate 1613 — TVA for Flowgate No. 1613 |
Acrobat
Excel |
27 KB
39 KB |
09/07/07 |
TVA Initial Investigation Report —
July 09, 2007 — Flowgate 1011 — TVA RC for AECI Flowgate No. 1011 |
|
Acrobat |
62 KB |
08/30/07 |
MISO Initial Investigation Report —
July 02-03, 2007 — Flowgate 14423 — Ottumwa-Bridgeport 161kV flo Ottumwa-EIC 161kV |
|
Acrobat |
117 KB |
08/24/07 |
ICTE Initial Investigation Report —
July 17, 2007 — Flowgate 14426 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
105 KB |
08/24/07 |
ICTE Initial Investigation Report —
July 16, 2007 — Flowgate 14426 — White Bluff-Keo 500KV FTLO Mabelvale-Sheridan 500KV |
|
Acrobat |
49 KB |
08/23/07 |
ICTE Initial Investigation Report —
July 12, 2007 — Flowgate 1903 — Cecelia-Moril 138 kV for loss of Flanders-Hopkins 138 kV |
|
Acrobat |
51 KB |
08/23/07 |
ICTE Initial Investigation Report —
July 10, 2007 — Flowgate 1903 — Cecelia-Moril 138 kV for loss of Flanders-Hopkins 138 kV |
|
Acrobat |
79 KB |
08/23/07 |
ICTE Initial Investigation Report —
June 23, 2007 — Flowgate 1330 — McAdams500-230 for loss of McAdams-Lakeover |
|
Acrobat |
43 KB |
08/22/07 |
MISO Initial Investigation Report —
July 18, 2007 — Flowgate 14474 — Duff – Dubois 138 (flo) Duff – Ramsey 345 |
|
Acrobat |
46 KB |
08/15/07 |
ICTE Initial Investigation Report —
June 19, 2007 — Flowgate 14404 — Thomas-Louisiana Station 138kV for the loss of Webre-Wells 500 |
|
Acrobat |
58 KB |
08/15/07 |
ICTE Initial Investigation Report —
June 14, 2007 — Flowgate 1330 — McAdams 500/230 auto FTLO McAdams-Lakeover 500Kv |
|
Acrobat |
81 KB |
08/15/07 |
ICTE Initial Investigation Report —
June 11, 2007 — Flowgate 1330 — McAdams 500/230 auto FTLO McAdams-Lakeover 500Kv |
|
Acrobat |
88 KB |
08/15/07 |
ICTE Initial Investigation Report —
June 9, 2007 — Flowgate 1330 — McAdams 500/230 for loss of McAdams-Lakeover 500Kv |
|
Acrobat |
104 KB |
08/14/07 |
ICTE Initial Investigation Report —
May 20, 2007 — Flowgate 1330 — McAdams 500/230 FTLO McAdams-Lakeover 500kV |
|
Acrobat |
90 KB |
08/13/07 |
ICTE Initial Investigation Report —
May 18, 2007 — Flowgate 14281 — Nelson 500/230 for the loss of Cypress-Hartburg 500kV |
|
Acrobat |
102 KB |
07/30/07 |
MISO Initial Investigation Report —
June 18, 2007 — Flowgate 6166 — Alma-Elk Mound 161kV flo King-Eau Claire 345kV |
|
Acrobat |
100 KB |
07/26/07 |
MISO Initial Investigation Report —
June 12, 2007 — Flowgate 14266 — Wisdom-Triboji 161kV flo Sherco #3 |
|
Acrobat |
87 KB |
07/13/07 |
MISO Initial Investigation Report —
June 11, 2007 — Flowgate 14266 —
Wisdom-Triboji 161kV flo Sherco #3 |
|
Acrobat |
63 KB |
07/02/07 |
MISO Initial Investigation Report —
June 11, 2007 — Flowgate 3529 — N. Appleton-Werner W. 345 (WEC) |
|
Acrobat |
88 KB |
06/21/07 |
MISO Initial Investigation Report —
May 9, 2007 — Flowgate 14292 — Raun-Interchange 161kV flo
Raun-Sioux City 345kV |
|
Acrobat |
33 KB |
06/18/07 |
MISO Initial Investigation Report —
May 15, 2007 — Flowgate 6002 — MHEX_S Interface |
|
Acrobat |
195 KB |
06/14/07 |
MISO Initial Investigation Report —
May 13, 2007 — Flowgate 2916 — Newtonville —
Troy 161 |
|
Acrobat |
112 KB |
06/08/07 |
ICTE Initial Investigation Report — May 6, 2007 — Flowgate
14225 — Morrilton East-Gleason 161kV for the loss of Pleasant
Hill-Mayflower 500kV |
|
Acrobat |
117 KB |
06/08/07 |
ICTE Initial Investigation Report — April 28, 2007 — Flowgate
14225 — Morrilton East-Gleason 161kV for the loss of Pleasant
Hill-Mayflower 500kV |
|
Acrobat |
67 KB |
06/07/07 |
MISO Initial Investigation Report — May 5th & 6th, 2007 — Flowgate
2026 — Newtonville - Coleman 161 |
|
Acrobat |
45 KB |
06/07/07 |
MISO Initial Investigation Report — May 1, 2007 — Flowgate
14260 —
Dubois – Culley 138 (flo) Warrick Unit 4 |
|
Acrobat |
102 KB |
06/07/07 |
ICTE Initial Investigation Report — April 23, 2007 — Flowgate 1902 —
Scott-Bonin
138kV for the loss of Renaud-Bonin 230kV |
|
Acrobat |
90 KB |
05/24/07 |
MISO Initial Investigation Report — April 9, 2007 — Flowgate
14228 —
Hazleton-Blackhawk 161kV flo Hazleton-Washburn 161kV |
|
Acrobat |
32 KB |
04/09/07 |
ICTE Initial Investigation Report — March 3, 2007 — Flowgate 1347 —
Wilbert-Livonia 138kV for the loss of Webre-Wells 500kV |
|
Acrobat |
18 KB |
03/22/07 |
MISO Initial Investigation Report — February 24, 2007 — Flowgate
6003 — MHEX_N Interface |
|
Acrobat |
36 KB |
03/22/07 |
MISO Initial Investigation Report — February 14, 2007 — Flowgate
14100 —
Davenport-Sub 78 161kV flo Sub
91-Davenport 345kV |
|
Acrobat |
145 KB |
03/08/07 |
MISO Initial Investigation Report — February 8, 2007 — Flowgate
6003 — MHEX_N Interface |
|
Acrobat |
35 KB |
02/24/07 |
MISO Initial Investigation Report — January 19, 2007 — Flowgate
14028 — Plymouth-Sioux City 161kV flo Raun-Lakefield 345kV line |
|
Acrobat |
28 KB |
02/24/07 |
MISO Initial Investigation Report — January 16, 2007 — Flowgate
6169 — Hills-Montezuma 345 kV line |
|
Acrobat |
38 KB |
02/24/07 |
MISO Initial Investigation Report — January 16, 2007 — Flowgate
6168 —
Hills-Parnell 161kV flo Hills-Montezuma 345kV line |
|
Acrobat |
190 KB |
01/19/07 |
MISO Initial Investigation Report — December 7, 2006 — Flowgate
13953 — Arnold-Hazleton 345kV line |
|
Acrobat |
1.2 MB |
01/06/07 |
ICTE Initial Investigation Report — December 6, 2006 — Flowgate
1902 — Scott-Bonin 138kV for the loss of Renaud-Bonin 230kV |
|
Acrobat |
166 KB |
12/01/06 |
MISO Initial Investigation Report — October 23, 2006 — Flowgate 2086 — Newtonville 161/138
|
|
Acrobat |
103 KB |
11/28/06 |
MISO Initial Investigation Report — October 13 & October 25, 2006 — Flowgate 6060 — Dorsey-Forbes 500kV line
|
|
Acrobat |
142 KB |
11/14/06 |
MISO Initial Investigation Report — October 12, 2006 — Flowgate 6003 — MHEX_N Interface
|
|
Acrobat |
14 KB |
11/07/06 |
EES Initial Investigation Report — October 3, 2006 — Flowgate 1903 — Cecelia-Moril 138kV for the loss of Flanders-Hopkins 138kV
|
|
Acrobat |
30 KB |
11/01/06 |
MISO Initial Investigation Report — October 1, 2006 — Flowgate 3741 — Marshalltown-Fernald 115 kV (flo) Montezuma-Bondurant 345 kV
|
|
Acrobat |
37 KB |
10/30/06 |
MISO Initial Investigation Report — October 1, 2006 — Flowgate 6139 — Judson Large-Greensburg 115 kV (flo) Mullergren 230/115 kV Xfmr
|
|
Acrobat |
22 KB |
10/26/06 |
MISO Initial Investigation Report — September 28, 2006 and September 27, 2006 — Flowgate 13746 — Genoa-Lacrosse 161kV for the loss of the JPM unit
|
|
Acrobat |
51 KB |
10/25/06 |
MISO Initial Investigation Report — September 28, 2006 and September 29, 2006 — Flowgate 6115 — St. Joe-Midway 161 kV for loss of St. Joe - Fairport 345 kV
|
|
Acrobat |
33 KB |
10/25/06 |
MISO Initial Investigation Report — September 28, 2006 — Flowgate 6702 — Letellier-Drayton 230kV line
|
|
Acrobat |
3.4 MB |
10/20/06 |
EES Initial Investigation Report — August 22, 2006 — Flowgate 1903 — Cecelia-Moril 138kV for the loss of Flanders-Hopkins 138kV
|
|
Acrobat |
148 KB |
10/20/06 |
MISO Initial Investigation Report — September 19, 2006 — Flowgates 2506 & 13752 — Duke Energy Speed – Northside 138 and Speed 345/138 Xfmr (flo) LGEE Ghent 345kV Bus Outage due to Breaker Outage without SPS.
|
|
Acrobat |
26 KB |
10/17/06 |
MISO Initial Investigation Report — September 16, 2006 — Flowgate 3706 — Arnold-Hazleton 345kV line
|
|
Acrobat |
83 KB |
09/28/06 |
MISO Initial Investigation Report — June 21-23, 2006 — Flowgate 2877 — Goddard-Rodburn 138 (flo) Spurlock-Avon 345 line and Flowgate 13555 — Goddard – Rodburn 138 (flo) EKP13024
Sheridan-Mabelvale 500kV FTLO White Bluff-Keo 500kV |
|
Acrobat |
10.2 MB |
09/05/06 |
EES
Initial Investigation Report — August 1, 2006 — Flowgate 13616 —
Sheridan-Mabelvale 500kV FTLO White Bluff-Keo 500kV |
|
Acrobat |
10.5 MB |
09/05/06 |
EES
Initial Investigation Report — July 31, 2006 — Flowgate 13616 —
Sheridan-Mabelvale 500kV FTLO White Bluff-Keo 500kV |
|
Acrobat |
112 KB |
08/15/06 |
MISO
Initial Investigation Report — July 19, 2006 — Flowgate 6002 —
the MHEX_S Interface |
|
Acrobat |
117 KB |
08/15/06 |
MISO
Initial Investigation Report — July 16, 2006 — Flowgate 6002 —
the MHEX_S Interface |
|
Acrobat |
764 KB |
08/08/06 |
SPP
Initial Investigation Report — June 11, 2006 — Flowgate 5204 —
SphWmcSumEmc flowgate |
|
Acrobat |
1 MB |
08/08/06 |
SPP
Initial Investigation Report — June 9, 2006 — Flowgate 13525 —
Temporary 4 flowgate (#13525 at that time) |
|
Acrobat |
10 MB |
08/08/06 |
EES
Initial Investigation Report — July 18, 2006 — Flowgate 13622 —
North Crowley-Scott 138kV for the loss of Wells-Pont Des Mouton 230kV |
|
Acrobat |
31 KB |
07/31/06 |
MISO
Initial Investigation Report — June 30, 2006 — Flowgate 3719 —
Salem 345/161kV Xfmr flo Quad Cities-Sub 91 345kV Line |
|
Acrobat |
34 KB |
07/31/06 |
MISO
Initial Investigation Report — June 30, 2006 — Flowgate 3724 —
Arnold-Vinton 161kV Line flo Arnold-Hazleton 345kV Line |
|
Acrobat |
135 KB |
07/24/06 |
MISO
Initial Investigation Report — June 24, 2006 — Flowgate 6060 —
Dorsey-Forbes 500kV Line |
|
Acrobat |
22 KB |
07/17/06 |
SPP
Initial Investigation Report — February 4 & 5, 2006 — Flowgate 5203 —
HppValPitVal flow gate |
|
Acrobat |
748 KB |
07/14/06 |
SPP
Initial Investigation Report — May 31, 2006 — Flowgate 5098 —
PecXfrMukCla flowgate |
|
Acrobat |
934 KB |
07/14/06 |
SPP
Initial Investigation Report — April 23, 2006 — Flowgate 5204 —
SphWmcSumEmc flowgate |
|
Acrobat |
28 KB |
07/05/06 |
MISO
Initial Investigation Report — June 2, 2006 — Flowgate 6168 —
Hills-Parnell 161kV flo Hills-Montezuma 345kV line |
|
Acrobat |
2 MB |
6/21/06 |
EES Initial Investigation Report —
June 8, 2006 — Flowgate 13502 —
Scott-Bonin 138kV for the loss of Renaud-Bonin 230kV |
| Acrobat |
54 KB |
03/30/06 |
MISO
Initial Investigation Report — February 27, 2006 — Flowgate
2877 — Goddard-Rodburn 138 (flo) Spurlock-Avon 345 line |
| Acrobat |
50 KB |
03/27/06 |
MISO
Initial Investigation Report — March 12, 2006 — Flowgate 6145 — Lake
Road-Nashua 161 kV for loss of Iatan-Stranger Creek 345kV |
| Acrobat |
24 KB |
02/28/06 |
MISO
Initial Investigation Report — February 18, 2006 — Flowgate
13351 — Hazleton-Blackhawk 161 kV |
| Acrobat |
24 KB |
02/22/06 |
MISO
Initial Investigation Report — January 21, 2006 — Flowgate
6169 — Hills-Montezuma
345kV line |
| Acrobat |
57 KB |
12/22/05 |
MISO
Initial Investigation Report — November 30 to December 7, 2005 — Flowgate
13256 — Dundee
– Hazelton 161 kV. |
| Acrobat |
148 KB |
11/03/05 |
PJM
Initial Investigation Report — October 8, 2005 — Flowgate
100 —
Kammer
#200 765/500 kV transformer l/o Belmont-Harrison 500
|
| Acrobat |
68 KB |
11/01/05 |
PJM
Initial Investigation Report — September 15, 2005 — Flowgate
100 —
Kammer
#200 765/500 kV transformer l/o Belmont-Harrison 500 |
| Acrobat |
20 KB |
10/18/05 |
MISO
Initial Investigation Report — September 24, 2005 — Flowgate
6007 —
Western Nebraska – Western Kansas Interface. |
| Acrobat |
117 KB |
09/23/05 |
VACS Initial Investigation Report
— June 15, 2005 — Flowgate 12970 — Tillery-Badin 115 kV flo
Newport-Richmond 500kV |
| Acrobat |
31
KB |
08/05/05 |
MISO
Initial Investigation Report — July 12 & July 13, 2005 — Flowgate
3706 —
Arnold - Hazelton Interface. |
| Acrobat |
17
KB |
07/28/05 |
MISO
Initial Investigation Report — July 12 & July 13, 2005 — Flowgate
6007 —
Western Nebraska – Western Kansas Interface. |
| Acrobat |
16
KB |
07/14/05 |
MISO
Initial Investigation Report — July 8 & July 10, 2005 — Flowgate 6072 —
Letellier – Drayton 230kv line. |
| Acrobat |
20
KB |
07/14/05 |
MISO
Initial Investigation Report — July 2, 2005 — Flowgate 6023 —
Western Nebraska – Western Kansas Interface. |
| Acrobat |
19
KB |
07/07/05 |
MISO
Initial Investigation Report — July 1, 2005 — Flowgate 6072 —
Letellier – Drayton 230kv line. |
| Acrobat |
18
KB |
07/07/05 |
MISO
Initial Investigation Report — June 20, 2005 — Flowgate 6002 —
Manitoba – USA Interface |
| Acrobat |
17
KB |
07/07/05 |
MISO
Initial Investigation Report — June 20, 2005 — Flowgate 12997 —
Manitoba – USA Interface |
| Acrobat |
3.8 MB |
06/17/05 |
EES Initial Investigation Report —
May, 25, 2005 — Flowgate 12917 —
Scott-Bonin 138kV for the loss
of Richard-Habetz 138kV |
| Acrobat |
4.9 MB |
06/17/05 |
EES Initial Investigation Report —
May, 24, 2005 — Flowgate 12931 —
Scott-Bonin 138kV for the loss of West Fork-Pont des Mouton 230kV |
| Acrobat |
5.1 MB |
06/17/05 |
EES Initial Investigation Report —
May, 23, 2005 — Flowgate 1327 —
Scott-Bonin 138kV for the loss of Cocodrie-Ville Platte 230kV |
| Acrobat |
4.9 MB |
06/13/05 |
EES Initial Investigation Report —
May, 19, 2005 —
Flowgate 12917 —
Scott-Bonin 138kV for the loss
of Richard-Habetz 138kV |
| Acrobat |
4.9 MB |
06/13/05 |
EES Initial Investigation Report —
May, 18, 2005 —
Flowgate 12917 —
Scott-Bonin 138kV for the loss of Richard-Habetz 138kV |
| Acrobat |
2.8 MB |
06/13/05 |
EES Initial Investigation Report — May, 11,
2005 — Flowgate 1350 — North
Crowley-Scott 138kV for the loss of Richard-Scott 138kV |
|