Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  

Facility Ratings Alert

Recommendation to Industry: Consideration of Actual Field Conditions in Determination of Facility Ratings

On November 30, 2010, NERC provided an update to the October 7, 2010 Recommendation to Industry entitled “Consideration of Actual Field Conditions in Determination of Facility Ratings.”  Transmission Owners and Generator Owners of bulk electric system facilities should review their current facility ratings methodology for their transmission lines to verify the methodology used is based on actual field conditions and determine if their ratings methodology will produce appropriate ratings when considering differences between design and field conditions.  If entities have not previously verified that the facility design, installation, and field conditions are within design tolerances when the facilities are loaded at their ratings, entities are required by January 18, 2011, to describe its plans to complete such an assessment of all its transmission lines, with the highest priority lines assessed by December 31, 2011, medium priority lines by December 31, 2012, and the lowest priority by December 31, 2013.  At the conclusion of each year, each Transmission Owner and Generator Owner must report to its Regional Entity a summary of the assessments and identification of all transmission facilities where as-built conditions are different from design conditions, resulting in incorrect ratings, and their associated mitigation timelines.  Remediation is expected within one year from identification of the issue or on a schedule approved by the Regional Entity if longer than a year.  Owners are also expected to coordinate with their respective operating and planning organizations to coordinate interim mitigation strategies.



Related Files
File Type Size Date  
Acrobat 274 KB 4/23/2012 FAC Alert Recommendation Update Webinar - Participant Q&A
Acrobat 459 KB 03/20/2012 FAC Alert Recommendation Update Webinar presentation
Acrobat 470 KB 03/02/2012 FAC Alert Update to FERC staff
Acrobat
Excel
243 KB
70 KB
11/16/11
11/16/11
FAC Alert Recommendation Webinar 09/22/2011 - Q&A
Semi-Annual Owner Reporting Spreadsheet v7
Acrobat 1123 KB 09/22/11 FAC Recommendation Update Webinar presentation
Excel 67 KB 09/16/11 FAC Reporting Spreadsheet
Acrobat 100 KB 05/20/11 Regional Entity Contacts for FAC Alert Questions
Acrobat
Acrobat
243 KB
712 KB
06/14/11
05/12/11
NERC Response to FAC Assessment Plan Review Criteria Webinar Questions
FAC Assessment Plan Review Criteria Webinar presentation
Acrobat 204 KB 05/11/11 Assessment Plan Review Criteria (05/11/2011)
Acrobat 198 KB 01/18/11

Q&A - Consideration of Actual Field Conditions in Determination of Facility Ratings (1/14/2011)

Acrobat 118 KB 11/30/2010 Letter from Gerry Cauley, NERC President and CEO, to Industry CEOs
Compliance Application Notice for Determination of Facility Ratings - FINAL
PowerPoint 6,421 KB 11/04/2010  NERC Alerts Training Responding to Alerts - September 22, 2009
Acrobat
Streaming Webinar
639 KB 11/04/2010 Webinar: 
Consideration of Actual Field Conditions in Determination of Facility Ratings

To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.
Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.