Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  


BAL-006-1
―Inadvertent Interchange

Related Files

Status:
The drafting team has posted the consideration of comments for the BAL-006-1 SAR Version 1.

Purpose/Industry Need:
The Resources Subcommittee (RS) proposes revising BAL-006-0, Inadvertent Interchange, to expand the Balancing Authority's Inadvertent Interchange reliability requirements, calculations, and measures; add Inadvertent Interchange dispute resolution methodology; and add regional differences to address MISO's and SPP's use of "scheduling agents"

The Resources Subcommittee recommends incorporating Inadvertent Interchange payback reliability requirements into this standard to maintain Interconnection frequency within a predefined frequency profile under all conditions.  As long as unilateral payback is based on the ACE equation (and includes a limiting factor of ACE - Lsub10) it has significant reliability implications.

Note: The SAR drafting team will work cooperatively with NAESB to revise this standard to assure it is developed in harmony with the NAESB business practices standard(s).

Proposed Standard Supporting
Materials
Comment 
Period
Comments 
Received

Response to Comments

October 2, 2006 WebEx/Conference Call: PowerPoint Presentation

Announcement

Draft 1
BAL-006-1
Posted for 30-day Comment
June 1 through June 30, 2006

Draft SAR Version 1

    Comment Period Closed

06/01/06 - 06/30/06

Comments Consideration of Comments
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

All comments should be forwarded to sarcomm@nerc.com.