Purpose/Industry Need:
The purpose of this set of four standards is to ensure that
Balancing Authorities take actions to maintain interconnection frequency
with each Balancing Authority contributing its fair share to frequency
control and without burdening transmission facilities with excessive
imbalances of load and generation.
This SAR is intended to address the following:
§ FERC Final Rule “Mandatory Reliability Standards for the
Bulk-Power System, FERC Order 693” on the NERC standards BAL-002, 004,
005, and 006
§
To specify the Time Error Correction, special Area Control
Error cases, and Inadvertent Interchange reliability
requirements/business practices with NERC and NAESB collaborative
participation
§
To incorporate the necessary content, structure, and
language to comply with the NERC standards process
This SAR expands on
the work already under way with the BAL-004, 005, 006 SARs, by requiring
that BAL-002, 004, 005, and 006 be upgraded in accordance with the NERC
Reliability Standards Development Plan 2007–2009.
|