Critical Infrastructure Protection ― Violation Risk Factors
Status:
The drafting team is considering the comments received from the
30-day posting.
There are nine Critical Infrastructure Protection (CIP) Violation Risk
Factors (VRFs) that were developed as part of the Version 1 VRF project,
but were missing when the set of Version 1 VRFs were posted for ballot.
The Standards Committee made a preliminary
determination that these
nine CIP VRFs meet the criteria for “errata”
and directed staff to post these VRFs for a 30-day comment period to
provide stakeholders an opportunity to identify any material impacts
associated with the errata.
Purpose/Industry Need:
As
NERC moves forward to become the Electric Reliability Organization (ERO)
and enforcement of the NERC reliability standards and the requirements
contained within begins, there will be a need to determine and specify
the relative risk the violation of each requirement poses to the bulk
electric system. A matrix
(Violation Risk Matrix) delineating the relative risks associated with
the violation of each NERC standard requirement was developed.
The Violation Risk Matrix would be used for the initial basis for
determining enforcement action for future violations.
|