Project 2008-08
EOP Violation Severity Levels Revisions

Related Files

Status:
NERC staff is finalizing the Violation Severity Level compliance filing which will be made on or before March 1, 2010.

Purpose/Industry Need:
The Feder
al Energy Regulatory Commission (FERC) in its Order on Compliance Filing dated June 7, 2007, directed NERC to replace the “Levels of Non-compliance” with “Violation Severity Levels” (VSLs) in the 83 previously approved reliability standards by March 1, 2008. Project 2007-23 Violation Severity Levels was initiated to respond to FERC’s directive.

VSLs define the degree to which compliance with a requirement or sub-requirement was not achieved. As set forth in the NERC Sanction Guidelines, VSLs are considered in conjunction with Violation Risk Factors to determine the base penalty range for a violation of a reliability standard requirement or sub-requirement. Revising the VSLs for the 8 EOP standards in question will enable the ERO’s Sanctions Guidelines to be used as designed for these standards.

Revise the VSLs for the eight EOP standards that were not approved in the balloting process for Project 2007-23 in support of stakeholder comments submitted during the balloting process.

  • EOP-001-0     Emergency Operations Planning

  • EOP-002-1     Capacity and Energy Emergencies

  • EOP-003-1     Load Shedding Plans

  • EOP-004-1     Disturbance Reporting

  • EOP-005-1     System Restoration Plans

  • EOP-006-1     Reliability Coordination ― System Restoration

  • EOP-008-0     Plans for Loss of Control Center Functionality

  • EOP-009-0     Documentation of Blackstart Generating Unit Test Results

Draft Action Dates Results Consideration of Comments

Staff Proposed Changes to Balloted Violation Severity Levels for Projects 2007-23 and 2008-08 (EOP VSL Revisions)

Proposed Changes

Comment Period

Info>>

Submit Comments>>


*Please submit only one comment form.  The form covers Project 2007-23 and Project 2008-08.
11/03/09 - 12/03/09
(closed)
   
 

Draft 3
EOP Violation Severity Levels


EOP VSLs
Clean  |  Redline to last posting
Recirculation Ballot

Info>> | Vote>>
08/17/09 - 08/27/09
(closed)
Summary>>

Full Record>>


Initial Ballot

Info>> |
Vote>>
07/31/09 - 08/10/09
(closed)
Summary>>

Full Record>>
Consideration of Comments>>
Pre-ballot Review
Info>> | Join>>
06/30/09 - 07/31/09
(closed)
 
Draft 2
EOP Violation Severity Levels


EOP VSLs
Clean  |  Redline to last posting
30-day Comment Period

Info>>


Submit Comments>>
04/09/09 - 05/08/09
(closed)
Comments Received>> Consideration of Comments>>
 

Eight EOP Standards with
VSL Revisions

Draft SAR Version 1

Supporting Materials:
Comment Questions in
Word Form

30-day Comment Period

Info>>

Submit Comments>>

 04/18/08 ― 05/19/08
(closed)

Comments Received>> Consideration of Comments>>
 
EOP VSL Drafting Team Nominations Nomination Period

Info>>

Submit Nomination>>
04/18/08 ― 05/01/08
(closed)
   
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

All comments should be forwarded to sarcomm@nerc.net.