|
Project 2008-05
Credible Multiple Element Contingency Events
Related
Files
Status:
The SAR drafting team is considering the comments received from the
second
posting of a SAR that proposes revising FAC-011-1.
Purpose/Industry
Need:
The purpose of this SAR is to revise
FAC-011-1 to require consideration of credible multiple element
contingency events for determining SOLs in the operating horizon, as
required by TPL-003-0 and FAC-010-1 for the planning horizon.
|