Project 2007-14
Coordinate
Interchange ― Timing Table
Related
Files
Status:
The
INT-005-3, INT-006-3, and INT-008-3 standards (Permanent Changes to
Coordinate Interchange Timing Tables) were approved by stakeholders with
a 100% weighted segment vote.
Purpose/Industry Need:
An Urgent Action SAR to modify the Timing Table in three of the
Coordinate Interchange standards (INT-005, INT-006, and INT-008) was
approved by its ballot pool on March 30, 2007.
The Urgent Action SAR modified the timing table so that the
reliability assessment period for WECC was lengthened from 5 minutes to
10 minutes for e-tags submitted less than 1 hour and greater than 20
minutes prior to ramp start. Under the Reliability Standards
Development Procedure, a change made to a standard with the Urgent
Action process is not "permanent"
— an urgent action
change to a standard expires unless that change is vetted through the
full standards development process.
|