ATC/TTC/AFC and CBM/TRM Revisions (Project 2006-07)

Registered Ballot Body
| Related Files | Drafting Team Rosters

Status
The drafting team has posted the recirculation ballot results for MOD-004-1.
The drafting team also posted its response to comments received from the MOD-004-1 initial ballot. 

The NERC Board of Trustees adopted the MOD-001, MOD-008, MOD-028, MOD-029, and MOD-030 standards during its August 26, 2008 conference call.  The standards have been filed with the FERC.  The Board has deferred action on the Violation Risk Factors for these standards, pending further analysis. 

Purpose/Industry Need
The ATC/TTC/AFC Revision SAR proposes changing MOD-001-0 by adding a requirement for transmission providers to coordinate the calculation of ATC and requires that specific reliability practices be incorporated into the ATC calculation and coordination methodologies.  Such changes will enhance the reliable use of the transmission system without needlessly limiting commercial activity. This request adds a requirement for documentation of the methodologies used to coordinate ATC.  In addition, a requirement is added for the enhanced documentation of the calculation methodology.

The CBM/TRM Revisions SAR proposes changing existing standards on TRM to require crisp and clear documentation of the calculation of TRM and make various components of the methodology mandatory so there is more consistency across methodologies.

MOD-030-2 Status
The drafting team has posted MOD-030-2 for a 30-day ballot and pre-ballot review.  The drafting team has also posted the response to comments received from the 10-day ballot window.

Purpose/Industry Need
Requirements 2 and 11 of MOD-030-1 will be modified.

 

Proposed Standard

Supporting
Material

Comment
Period

Comments
Received

Response to Comments

Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 30-day Pre-ballot Review and Join Ballot Pool


MOD-030-2
Clean
| Redline to Last Posting
Implementation Plan 10/28/08–11/26/08

30-day Pre-ballot Review and Join Ballot Pool
   
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 10-day Recirculation Ballot Window

MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting
10/28/08–11/06/08
(closed)


10-day Recirculation Ballot
  Announcement

Ballot Results
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 10-day Ballot Window

MOD-004-1
Clean | Redline to Last Posting

Implementation Plan
Clean | Redline to Last Posting

09/11/08 – 09/21/08
(closed)

10-day Ballot Window

 

Announcement

Ballot Results

Ballot Comments

Response to Comments

Project 2006-07 ― ATC/TTC and CBM/TRM


Posted for Board of Trustees Adoption August 22, 2008


MOD-001-1
Clean | Redline to last posting

MOD-008-1
Clean | Redline to last posting

MOD-028-1
Clean | Redline to last posting

MOD-029-1
Clean | Redline to last posting

MOD-030-1
Clean | Redline to last posting

MOD-001-1 Implementation Plan
Clean | Redline
Process Steps

MOD-008-1 Implementation Plan
Clean | Redline
Process Steps

MOD-028-1 Implementation Plan
Clean | Redline
Process Steps

MOD-029-1

Implementation Plan
Clean | Redline
Process Steps

 

MOD-030-1

Implementation Plan
Clean | Redline
Process Steps

     
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
10-day Recirculation Ballot Window

MOD-001-1
Clean | Redline to last posting

MOD-008-1
Clean | Redline to last posting

MOD-028 1
Clean | Redline to last posting

MOD-029-1
Clean | Redline to last posting

MOD-030-1
Clean | Redline to last posting

MOD-001-1 Implementation Plan
Clean | Redline
Process Steps

MOD-008-1 Implementation Plan
Clean | Redline
Process Steps

MOD-028-1 Implementation Plan
Clean | Redline
Process Steps

MOD-029-1

Implementation Plan
Clean | Redline
Process Steps

 

MOD-030-1

Implementation Plan
Clean | Redline
Process Steps

08/12/08 – 08/21/08
(closed)

Recirculation Ballot

  Announcement

Recirculation Ballot Results

MOD-001-1

MOD-008-1

MOD-028-1

MOD-029-1

MOD-030-1
Announcement
Project 2006-07 ― ATC/TTC and CBM/TRM
Posted for 30-day Pre-ballot Window and Ballot Pool

MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting

08/12/08 – 09/11/08
(closed)

Pre-Ballot Window and Ballot Pool

   
Announcement
Project 2006-07 ― ATC/TTC and CBM/TRM
Posted for 45-day Comment Period

MOD-030-2
Clean | Redline to recirculation version

SAR Version 1
Implementation Plan 08/12/08 – 09/24/08
(closed)

Electronic Comment Form

Questions in Word Form
Comments



Response to Comments

Announcement

ATC/TTC and CBM/TRM Project 2006-07
10-day Ballot Window

July 21July 30, 2008
(closed)

Announcement

ATC/TTC and CBM/TRM Project 2006-07
30-day Pre-ballot Review

June 20July 21, 2008
(closed)

MOD-001-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-008-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-028-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-029-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-030-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

Announcement

Project 2006-07 ― ATC/TTC and CBM/TRM Posted for 30-day Comment Period

MOD-004-1
Clean | Redline to Last Posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp
Implementation Plan
Clean | Redline to Last Posting
05/23/08 – 06/23/08
(closed)

Electronic Comment Form

Comment Form in Word
Comments

 

 Consideration of Comments

Announcement

30-day Comment Period for Project 2006-07
ATC/TTC and CBM/TRM

April 16-May 15, 2008
(closed)

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

MOD-001-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-008-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-028-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-029-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-030-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.