ATC/TTC/AFC and CBM/TRM Revisions (Project 2006-07)

 Related Files

Status:
The drafting team is working on responding to the comments received from the VRF Analysis and Recommendations Report that was posted for a 21-day comment period ending on January 28, 2009.

The NERC Board of Trustees adopted the MOD-001, MOD-008, MOD-028, MOD-029, and MOD-030 standards during its August 26, 2008 conference call.  The standards have been approved by FERC (MOD-001-1, MOD-008-1, MOD-028-1, MOD-029-1, MOD030-2).  The Board has deferred action on the Violation Risk Factors for these standards, pending further analysis. 

Purpose/Industry Need:
The ATC/TTC/AFC Revision SAR proposes changing MOD-001-0 by adding a requirement for transmission providers to coordinate the calculation of ATC and requires that specific reliability practices be incorporated into the ATC calculation and coordination methodologies.  Such changes will enhance the reliable use of the transmission system without needlessly limiting commercial activity. This request adds a requirement for documentation of the methodologies used to coordinate ATC.  In addition, a requirement is added for the enhanced documentation of the calculation methodology.

The CBM/TRM Revisions SAR proposes changing existing standards on TRM to require crisp and clear documentation of the calculation of TRM and make various components of the methodology mandatory so there is more consistency across methodologies.

MOD-030-2 Status:
The recirculation ballot results are posted below.  The standard was approved and will be submitted to the NERC Board of Trustees for adoption

Purpose/Industry Need:
Requirements 2 and 11 of MOD-030-1 will be modified.

 

Proposed Standard

Supporting
Material

Comment
Period

Comments
Received

Response to Comments

Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 10-day Recirculation Ballot Window


MOD-030-2
Clean | Redline to Last Posting
Implementation Plan 01/20/09 01/29/09
(closed)


10-day Recirculation Ballot
  Announcement

Ballot Results
Announcement

ATC Violation Risk Factor Analysis and Recommendations Report for a 21-day comment period
VRF Analysis and Recommendations Report 01/07/09 - 01/28/09
(closed)


Electronic Comment Form

Word Version of Questions
Comments Received  
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 10-day Ballot Window


MOD-030-2
Clean
| Redline to Last Posting
  12/01/0812/10/08
(closed)


10-day Ballot Window
  Announcement

Ballot Results


Response to Comments
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 30-day Pre-ballot Review and Join Ballot Pool


MOD-030-2
Clean
| Redline to Last Posting
Implementation Plan 10/28/08–11/26/08
(closed)


30-day Pre-ballot Review and Join Ballot Pool
   
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 10-day Recirculation Ballot Window

MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting
10/28/08–11/06/08
(closed)


10-day Recirculation Ballot
  Announcement

Ballot Results
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
Posted for 10-day Ballot Window

MOD-004-1
Clean | Redline to Last Posting

Implementation Plan
Clean | Redline to Last Posting

09/11/08 – 09/21/08
(closed)

10-day Ballot Window

 

Announcement

Ballot Results

Ballot Comments

Response to Comments

Project 2006-07 ― ATC/TTC and CBM/TRM


Posted for Board of Trustees Adoption August 22, 2008


MOD-001-1
Clean | Redline to last posting

MOD-008-1
Clean | Redline to last posting

MOD-028-1
Clean | Redline to last posting

MOD-029-1
Clean | Redline to last posting

MOD-030-1
Clean | Redline to last posting

MOD-001-1 Implementation Plan
Clean | Redline
Process Steps

MOD-008-1 Implementation Plan
Clean | Redline
Process Steps

MOD-028-1 Implementation Plan
Clean | Redline
Process Steps

MOD-029-1

Implementation Plan
Clean | Redline
Process Steps

 

MOD-030-1

Implementation Plan
Clean | Redline
Process Steps

     
Announcement

Project 2006-07 ― ATC/TTC and CMB/TRM
10-day Recirculation Ballot Window

MOD-001-1
Clean | Redline to last posting

MOD-008-1
Clean | Redline to last posting

MOD-028 1
Clean | Redline to last posting

MOD-029-1
Clean | Redline to last posting

MOD-030-1
Clean | Redline to last posting

MOD-001-1 Implementation Plan
Clean | Redline
Process Steps

MOD-008-1 Implementation Plan
Clean | Redline
Process Steps

MOD-028-1 Implementation Plan
Clean | Redline
Process Steps

MOD-029-1

Implementation Plan
Clean | Redline
Process Steps

 

MOD-030-1

Implementation Plan
Clean | Redline
Process Steps

08/12/08 – 08/21/08
(closed)

Recirculation Ballot

  Announcement

Recirculation Ballot Results

MOD-001-1

MOD-008-1

MOD-028-1

MOD-029-1

MOD-030-1
Announcement
Project 2006-07 ― ATC/TTC and CBM/TRM
Posted for 30-day Pre-ballot Window and Ballot Pool

MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting

08/12/08 – 09/11/08
(closed)

Pre-Ballot Window and Ballot Pool

   
Announcement
Project 2006-07 ― ATC/TTC and CBM/TRM
Posted for 45-day Comment Period

MOD-030-2
Clean | Redline to recirculation version

SAR Version 1
Implementation Plan 08/12/08 – 09/24/08
(closed)

Electronic Comment Form

Questions in Word Form
Comments



Response to Comments

Announcement

ATC/TTC and CBM/TRM Project 2006-07
10-day Ballot Window

July 21July 30, 2008
(closed)

Announcement

ATC/TTC and CBM/TRM Project 2006-07
30-day Pre-ballot Review

June 20July 21, 2008
(closed)

MOD-001-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-008-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-028-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-029-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

MOD-030-1
Clean | Redline to last posting

Implementation Plan
Clean | Redline

Process Steps

 

 

Initial Ballot Results

Ballot Comments

Response to Comments

Announcement

Project 2006-07 ― ATC/TTC and CBM/TRM Posted for 30-day Comment Period

MOD-004-1
Clean | Redline to Last Posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp
Implementation Plan
Clean | Redline to Last Posting
05/23/08 – 06/23/08
(closed)

Electronic Comment Form

Comment Form in Word
Comments

 

 Consideration of Comments

Announcement

30-day Comment Period for Project 2006-07
ATC/TTC and CBM/TRM

April 16-May 15, 2008
(closed)

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

MOD-001-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-008-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-028-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-029-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

MOD-030-1
Clean | Redline to last posting

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

Implementation Plan
Clean | Redline to Last Posting

Comment Form

Word Form

Comments

Consideration of Comments

Announcement

Ballot Windows Project 2006-07 - ATC/TTC and CBM/TRM

March 3-12, 2008
(closed)

 

 

 

Announcement

Initial Ballot Results

Link to Ballot Summary and Comments

MOD-001-1
Clean | Redline to last posting

Implementation Plan

 

 

  Consideration of Comments

MOD-004-1
Clean | Redline to last posting

Implementation Plan

 

 

  Consideration of Comments

MOD-008-1
Clean | Redline to last posting

Implementation Plan

 

 

  Consideration of Comments

MOD-028-1
Clean | Redline to last posting

Implementation Plan

 

 

  Consideration of Comments

MOD-029-1
Clean | Redline to last posting

Implementation Plan

 

 

Consideration of Comments

MOD-030-1
Clean | Redline to last posting

Implementation Plan

 

 

  Consideration of Comments

Announcement

Pre-ballot Windows and Ballot Pools Open for Project 2006-07
ATC/TTC and CBM/TRM

February 1-March 3, 2008
(closed)

MOD-001-1
Clean | Redline to last posting

Implementation Plan

 

 

 

MOD-004-1
Clean | Redline to last posting

Implementation Plan

 

 

 

MOD-008-1
Clean | Redline to last posting

Implementation Plan

 

 

 

MOD-028-1
Clean | Redline to last posting

Implementation Plan

 

 

 

MOD-029-1
Clean | Redline to last posting

Implementation Plan

 

 

 

MOD-030-1
Clean | Redline to last posting

Implementation Plan

 

 

 

Announcement

Draft 
Available Transfer Capability Standards
Posted for 45-day Comment Period

 

10/31/07 - 12/14/07
(closed)

Comment Form

Comments

Consideration of Comments

MOD-001-1

Implementation Plan

Summary of FERC Directives in FERC Orders 693 and 890 and Corresponding NERC Standards and Requirements

 

 

 

MOD-004-1

 

 

 

MOD-008-1

 

 

 

MOD-028-1

 

 

 

MOD-029-1 (revised)

 

 

 

MOD-030-1

 

 

 

Announcement

Draft 
Available Transfer Capability Standards
Posted for 30-day Comment Period
May 25 through June 25, 2007 (closed)

 

 

 

 

MOD-001-1

White Paper
Summary of Changes to the Structure of the Standards for ATC

Comment Form

Comments

Consideration of Comments

MOD-004-1

Comment Form

Attachment 1

Comments

Consideration of Comments
(revised)

MOD-008-1

Comment Form

Attachment 1

Comments

Consideration of Comments

MOD-028-1

Comment Form

Comments

Consideration of Comments

MOD-029-1

Comment Form

Comments

Consideration of Comments

MOD-030-1

Comment Form

Comments

Consideration of Comments

Final Supplemental ATC SAR


Clean | Redline to last posting

 

 

 

Announcement

Supplemental ATC SAR

Comment Form

Nomination Form
05/25/07 - 06/08/07

 (closed)

Comments

Consideration of Comments 

Announcement

Draft 1
Standard MOD-001-1
Posted for 30-day Comment Period
February 15 through March 16, 2007

MOD-001-1
Clean |
Redline to Version 0

 

02/15/07 - 03/16/07

(closed)

 

Comment Form

Comments

Consideration of Comments

Final SAR: ATC/TTC/AFC

Final SAR: CBM/TRM

CBM Minority Opinion

 

 

 

Draft SAR Version 1: ATC/TTC/AFC Revision

Draft SAR Version 1: CBM/TRM Revision

 

07/08/05 - 08/08/05

(closed)

Comments

Responses

To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Lauren Koller - lauren.koller@nerc.net or 609-452-8060.


Legal and Privacy  :  609.452.8060 voice  :  609.452.9550 fax  :  116-390 Village Boulevard  :  Princeton, NJ 08540-5721
Washington Office: 1120 G Street, N.W. : Suite 990 : Washington, DC 20005-3801





Copyright © 2008 by the North American Electric Reliability Corporation.  :  All rights reserved.
A New Jersey Nonprofit Corporation