Reliability Standards Effective Dates for Mandatory Enforcement

Mandatory Standards Subject to Enforcement | Standards Awaiting Regulatory Approval |

Inactive Standards

NERC Reliability Standards are adopted in New Brunswick under the Electricity Market Rules according to the process set out under the Electricity Act for amending a market rule.

NERC files a Board approved standard and related information with the New Brunswick Energy and Utilities Board and copies the New Brunswick System Operator (NBSO). At the beginning of each calendar year the NBSO initiates the adoption process by posting a list of new or amended standards filed by NERC in the previous year for a 30 day review period. If there are no requests for the New Brunswick Energy and Utilities Board to review a new or modified standard the standard will be deemed approved at the end of the review period and will take effect on the prescribed date. The NBSO may also initiate the adoption process for a standard at any time during the year if conditions warrant such action. 

A listing of adopted standards is maintained and posted in Appendix B of the NBSO Reliability Compliance Program- Market Procedure 08.

NERC Board of Trustees Approval: the date on which the NERC Board of Trustees approved the standard in accordance with the implementation plan proposed by the standard.

Regulatory Approval Date: the date the applicable regulatory authority affirmatively acted to approve the standard or the period of review has expired and the standard is automatically approved.

Mandatory Effective Implementation Date: the date on which the standard becomes mandatory and enforceable in accordance with the existing laws of the jurisdiction.

BOT Approved Effective Date: the date approved by the NERC Board of Trustees for the standard to be implemented.

Last Update — May 19, 2009

New Brunswick
Mandatory Standards Subject to Enforcement

Standard
Number
Title (MM/DD/YY)
NERC BOT
Approval
Regulatory
Approval
Date
Mandatory
Implementation
Date
Resource and Demand Balancing
BAL-001-0 Real Power Balancing Control Performance 02/02/05     
BAL-001-0a Real Power Balancing Control Performance 10/23/07     
BAL-001-0.1a Real Power Balancing Control Performance 10/29/08     02/23/09
BAL-001-AB-0a Real Power Balancing Control Performance    02/04/09 02/13/09
BAL-002-0 Disturbance Control Performance 02/02/05     02/08/05
BAL-002-WECC-1 Contingency Reserve 10/29/08     
BAL-STD-002-0 Operating Reserves (WECC) 03/12/07     06/18/07
BAL-003-0 Frequency Response and Bias 02/02/05     
BAL-003-0a Frequency Response and Bias 10/23/07     
BAL-003-0b Frequency Response and Bias 02/12/08     
BAL-003-AB-0a Frequency Response and Bias    02/04/09 02/13/09
BAL-003-0.1b Frequency Response and Bias 10/29/08     02/23/09
BAL-004-0 Time Error Correction 02/02/05     
BAL-004-1

Time Error Correction

03/26/08     03/26/08
BAL-004-WECC-01 Automatic Time Error Correction 03/26/08     
BAL-005-0 Automatic Generation Control 02/02/05     
BAL-005-0b Automatic Generation Control 02/12/08     
BAL-005-0.1b Automatic Generation Control 10/29/08     02/23/09
BAL-006-1 Inadvertent Interchange 05/02/06     
BAL-006-1.1 Inadvertent Interchange 10/29/08   02/23/09  
BAL-006-AB-1 Inadvertent Interchange    02/04/09 02/13/09

Communications

COM-001-1 Telecommunications 11/01/06    
COM-001-1.1 Telecommunications 10/29/08    02/23/09
COM-002-2 Communications and Coordination 11/01/06    11/01/06

Critical Infrastructure Protection

CIP-001-1 Sabotage Reporting 11/01/06    11/01/06  
CIP-002-1 Cyber Security — Critical Cyber Asset Identification 05/02/06    05/02/06
CIP-003-1 Cyber Security — Security Management Controls 05/02/06    05/02/06
CIP-004-1 Cyber Security — Personnel & Training 05/02/06     05/02/06
CIP-005-1 Cyber Security — Electronic Security Perimeter(s) 05/02/06     05/02/06
CIP-006-1 Cyber Security — Physical Security of Critical Cyber Assets 05/02/06    
CIP-006-1a Cyber Security — Physical Security of Critical Cyber Assets 02/12/08     02/12/08
CIP-007-1 Cyber Security — Systems Security Management 05/02/06     05/02/06
CIP-008-1 Cyber Security — Incident Reporting and Response Planning 05/02/06      05/02/06
CIP-009-1 Cyber Security — Recovery Plans for Critical Cyber Assets 05/02/06     05/02/06

Emergency Preparedness and Operations

EOP-001-0 Emergency Operations Planning 02/02/05     04/01/05
EOP-001-1 Emergency Operations Planning 10/17/08     07/01/09
EOP-002-2 Capacity and Energy Emergencies 11/01/06     
EOP-002-2.1 Capacity and Energy Emergencies 10/29/08   02/23/09
EOP-003-1 Load Shedding Plans 11/01/06    11/01/06
EOP-004-1 Disturbance Reporting 11/01/06     11/01/06
EOP-005-1 System Restoration Plans 05/02/06     11/01/06
EOP-006-1 Reliability Coordination - System Restoration 11/01/06     11/01/06
EOP-007-0 Establish, Maintain, and Document a Regional Blackstart Capability Plan 02/02/05    04/01/05
EOP-008-0 Plans for Loss of Control Center Functionality 02/02/05     04/01/05
EOP-009-0 Documentation of Blackstart Generating Unit Test Results 02/02/05     04/01/05

Facilities Design, Connections, and Maintenance

FAC-001-0 Facility Connection Requirements 02/02/05     04/01/05
FAC-002-0 Coordination of Plans For New Generation, Transmission, and End-User 02/02/05     04/01/05
FAC-003-AB-1 Transmission Vegetation Management Program(R1 and R2 effective: 2010-01-26)    01/26/09 03/27/09
FAC-003-1 Vegetation Management Program 02/07/06     02/07/06
FAC-501-WECC-1 Transmission Maintenance 10/29/08     
FAC-008-1 Facility Ratings Methodology 02/07/06     02/07/06
FAC-009-1 Establish and Communicate Facility Ratings 02/07/06     07/01/06
FAC-010-1 System Operating Limits Methodology for the Planning Horizon 11/01/06     
FAC-010-2 System Operating Limits Methodology for the Planning Horizon 06/24/08   02/23/09
FAC-011-1 System Operating Limits Methodology for the Operations Horizon 11/01/06     
FAC-011-2 System Operating Limits Methodology for the Operations Horizon 06/24/08      02/23/09
FAC-012-1 Transfer Capability Methodology 02/07/06   02/07/06
FAC-013-1 Establish and Communicate Transfer Capabilities 02/07/06   02/07/06
FAC-014-1 Establish and Communicate System Operating Limits 11/01/06    
FAC-014-2 Establish and Communicate System Operating Limits 06/24/08     02/23/09

Interchange Scheduling and Coordination

INT-001-2 Interchange Information 11/01/06     
INT-001-3 Interchange Information 10/09/07     11/01/06
INT-003-AB-2 Interchange Transaction Implementation   01/26/09 01/26/09
INT-003-2 Interchange Transaction Implementation 11/01/06     11/01/06
INT-004-1 Dynamic Interchange Transaction Modifications 05/02/06     
INT-004-2 Dynamic Interchange Transaction Modifications 10/09/07     10/09/07
INT-005-1 Interchange Authority Distributes Arranged Interchange 05/02/06     
INT-005-2 Interchange Authority Distributes Arranged Interchange 05/01/07     05/02/07
INT-005-3 Interchange Authority Distributes Arranged Interchange 10/29/08     
INT-006-1 Response to Interchange Authority 05/02/06     
INT-006-2 Response to Interchange Authority 05/01/07   05/02/07
INT-006-3 Response to Interchange Authority 10/29/08     
INT-007-1 Interchange Confirmation 05/02/06     05/02/06
INT-008-1 Interchange Authority Distributes Status 05/02/06     
INT-008-2 Interchange Authority Distributes Status 05/01/07   05/02/07
INT-008-3 Interchange Authority Distributes Status 10/29/08     
INT-009-1 Implementation of Interchange 05/02/06     05/02/06
INT-010-1 Interchange Coordination Exemptions 05/02/06     05/02/06

Interconnection Reliability Operations and Coordination

IRO-001-1 Reliability Coordination Responsibilities and Authorities 11/01/06     
IRO-001-1.1 Reliability Coordination Responsibilities and Authorities 10/29/08     02/23/09
IRO-002-1 Reliability Coordination Facilities 11/01/06     11/01/06
IRO-002-2 Reliability Coordination Facilities 10/17/08    07/01/09
IRO-003-2 Reliability Coordination Wide-Area View 11/01/06     01/01/07
IRO-004-1 Reliability Coordination Operations Planning 02/07/06     02/07/06
IRO-004-2 Reliability Coordination Operations Planning 10/17/08     07/01/09
IRO-005-1 Reliability Coordination Current-Day Operations 02/07/06     
IRO-005-2 Reliability Coordination Current-Day Operations 11/01/06     11/01/06
IRO-005-3 Reliability Coordination Current-Day Operations 10/17/08     07/01/09
IRO-006-3 Reliability Coordination Transmission Loading Relief 08/02/06     08/02/06
IRO-006-4 Reliability Coordination Transmission Loading Relief 10/09/07     
IRO-006-WECC-1 Qualified Path Unscheduled Flow Relief 02/10/09     
IRO-STD-006-0 Qualified Path Unscheduled Flow Relief (WECC) 03/12/07     
IRO-008-1 Reliability Coordinator Operational Analyses and Real-time Assessments 10/17/08     07/01/09
IRO-009-1 Reliability Coordinator Actions to Operate Within IROLs 10/17/08     07/01/09
IRO-010-1 Reliability Coordinator Data Specification and Collection 10/17/08     07/01/09
IRO-014-1 Procedures, Processes, or Plans to Support Coordination Between Reliability Coordinators 02/07/06     02/07/06
IRO-015-1 Notifications and Information Exchange Between Reliability Coordinators 02/07/06     02/07/06
IRO-016-1 Coordination of Real-time Activities Between Reliability Coordinators 02/07/06     02/07/06

Modeling, Data, and Analysis

MOD-001-0 Documentation of Total Transfer Capability and Available Transfer Capability Calculation Methodologies 02/02/05     02/08/05
MOD-001-1 Documentation of Total Transfer Capability and Available Transfer Capability Calculation Methodologies 08/26/08     
MOD-002-0 Review of Transmission Service Provider Total Transfer Capability and Available Transfer Capability Calculations and Results 02/02/05     02/07/06
MOD-003-0 Regional Procedure for Input on Total Transfer Capability and Available Transfer Capability Methodologies and Values 02/02/05     02/07/06
MOD-004-0 Documentation of Regional Reliability Organization Capacity Benefit Margin Methodologies 02/02/05     02/07/06
MOD-004-1 Documentation of Regional Reliability Organization Capacity Benefit Margin Methodologies 11/13/08     
MOD-005-0 Procedure for Verifying Capacity Benefit Margin Values 02/02/05     02/07/06
MOD-006-0 Procedures for the Use of Capacity Benefit Margin Values 02/02/05     
MOD-006-0.1 Procedures for the Use of Capacity Benefit Margin Values 10/29/08     02/23/09
MOD-007-0 Documentation of the Use of Capacity Benefit Margin 02/02/05     02/07/06
MOD-008-0 Documentation and Content of Each Regional Transmission Reliability Margin Methodology 02/02/05     02/07/06
MOD-008-1 Documentation and Content of Each Regional Transmission Reliability Margin Methodology 08/26/08    
MOD-009-0 Procedure for Verifying Transmission Reliability Margin Values 02/02/05     02/07/06
MOD-010-0 Steady-State Data for Modeling and Simulation of the Interconnected Transmission System 02/02/05     02/07/06
MOD-011-0 Maintenance and Distribution of Steady-State Data Requirements and Reporting Procedures 02/02/05     02/07/06
MOD-012-0 Dynamics Data for Modeling and Simulation of the Interconnected Transmission System 02/02/05    02/07/06
MOD-013-1 Maintenance and Distribution of Dynamics Data Requirements and Reporting Procedures 05/02/06     02/07/06
MOD-014-0 Development of Steady-State System Models 02/02/05     02/07/06
MOD-015-0 Development of Dynamics System Models 02/02/05    
MOD-015-0.1 Development of Dynamics System Models 10/29/08     02/23/09
MOD-016-1 Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, and Controllable Demand-Side Management   05/02/06     
MOD-016-1.1 Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, and Controllable Demand-Side Management   10/29/08     02/23/09
MOD-017-0 Aggregated Actual and Forecast Demands and Net Energy for Load 02/02/05     
MOD-017-0.1 Aggregated Actual and Forecast Demands and Net Energy for Load 10/29/08     02/23/09
MOD-018-0 Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load 02/02/05     02/07/06
MOD-019-0 Reporting of Interruptible Demands and Direct Control Load Management 02/02/05     
MOD-019-0.1 Reporting of Interruptible Demands and Direct Control Load Management 10/29/08     02/23/09
MOD-020-0 Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators 02/02/05     02/07/06
MOD-021-0 Documentation of the Accounting Methodology for the Effects of Controllable Demand-Side Management in Demand and Energy Forecasts. 02/02/05     02/07/06
MOD-024-1 Verification of Generator Gross and Net Real Power Capability 02/07/06     02/07/06
MOD-025-1 Verification of Generator Gross and Net Reactive Power Capability 02/07/06     02/07/06
MOD-028-1 Area Interchange Methodology 08/26/08     
MOD-029-1 Rated System Path Methodology 08/26/08     
MOD-030-1 Flowgate Methodology 08/26/08      
MOD-030-2 Flowgate Methodology 02/10/09      

Nuclear

NUC-001-1

Nuclear Plant Interface Coordination 05/01/07     05/02/07

Personnel Performance, Training, and Qualifications

PER-001-0 Operating Personnel Responsibility and Authority 02/02/05     02/08/05
PER-002-0 Operating Personnel Training 02/02/05     02/08/05
PER-003-0 Operating Personnel Credentials 02/02/05     02/08/05
PER-004-1 Reliability Coordination Staffing 11/01/06     11/01/06
PER-004-2 Reliability Coordination Staffing 02/10/09     04/01/09
PER-005-1 System Personnel Training 02/10/09     

 Protection and Control

PRC-001-1 System Protection Coordination 11/01/06     11/01/07
PRC-002-1 Define Regional Disturbance Monitoring and Reporting Requirements 08/02/06     08/02/06
PRC-STD-001-1 Certification of Protective Relay Applications and Settings (WECC) 03/12/07     
PRC-STD-003-1 Protective Relay and Remedial Action Scheme Misoperation (WECC) 03/12/07     
PRC-003-1 Regional Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems 02/07/06     02/07/06
PRC-004-1 Analysis and Mitigation of Transmission and Generation Protection System Misoperations 02/07/06     02/07/06
PRC-004-WECC-1 Protection System and Remedial Action Scheme Misoperation 10/29/08     
PRC-005-1 Transmission and Generation Protection System Maintenance and Testing 02/07/06     02/07/06
PRC-STD-005-1 Transmission Maintenance (WECC) 03/12/07     
PRC-006-0 Development and Documentation of Regional Reliability Organizations’ Underfrequency Load Shedding Programs 02/02/05     02/07/06
PRC-007-0 Assuring Consistency of Entity Underfrequency Load Shedding Programs with Regional Reliability Organization’s Underfrequency Load Shedding Program Requirements 02/02/05     02/08/05
PRC-008-0 Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program 02/02/05     02/08/05
PRC-009-0 Analysis and Documentation of Underfrequency Load Shedding 02/02/05     02/08/05
PRC-010-0 Technical Assessment of the Design and Effectiveness of Undervoltage Load 02/02/05     02/08/05
PRC-011-0 Undervoltage Load Shedding System Maintenance and Testing 02/02/05     02/08/05
PRC-012-0 Special Protection System Review Procedure 02/02/05   02/07/06
PRC-013-0 Special Protection System Database 02/02/05     02/07/06
PRC-014-0 Special Protection System Assessment 02/02/05     02/07/06
PRC-015-0 Special Protection System Data and Documentation 02/02/05     02/07/06
PRC-016-0 Special Protection System Misoperations 02/02/05     
PRC-016-0.1 Special Protection System Misoperations 10/29/08     02/23/09
PRC-017-0 Special Protection System Maintenance and Testing 02/02/05     02/08/05
PRC-018-1 Disturbance Monitoring Equipment Installation and Data Reporting 08/02/06     08/02/06
PRC-020-1 Under-Voltage Load Shedding Program Database 02/07/06     02/07/06
PRC-021-1 Under-Voltage Load Shedding Program Data 02/07/06     02/07/06
PRC-022-1 Under-Voltage Load Shedding Program Performance 02/07/06     02/07/06
PRC-023-1 Transmission Relay Loadability 02/12/08     02/12/08

 Transmission Operations

TOP-001-1 Reliability Responsibilities and Authorities 11/01/06     11/01/06
TOP-002-2 Normal Operations Planning 11/01/06     11/01/06
TOP-002-2a Normal Operations Planning 02/10/09     
TOP-003-0 Planned Outage Coordination 02/02/05     02/08/05
TOP-003-1 Planned Outage Coordination 10/17/08     07/01/09
TOP-004-1 Transmission Operations 11/01/06     
TOP-004-2 Transmission Operations 11/01/06    02/23/09
TOP-005-AB-1 Operational Reliability Information    01/26/09 05/26/09
TOP-005-1 Operational Reliability Information 02/07/06     
TOP-005-1.1 Operational Reliability Information 10/29/08     02/23/09
TOP-005-2 Operational Reliability Information 10/17/08     07/01/09
TOP-006-1 Monitoring System Conditions 11/01/06    11/01/06
TOP-006-2 Monitoring System Conditions 10/17/08    07/01/09 
TOP-007-0 Reporting System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations 02/02/05     02/08/05
TOP-007-WECC-1 System Operating Limits (WECC) 10/29/08     
TOP-STD-007-0 Operating Transfer Capability (WECC) 03/12/07     
TOP-008-1 Response to Transmission Limit Violations 11/01/06     11/01/06

 Transmission Planning

TPL-001-0 System Performance Under Normal (No Contingency) Conditions (Category A) 02/02/05     
TPL-001-0.1 System Performance Under Normal (No Contingency) Conditions (Category A) 10/29/08     02/23/09
TPL-002-0 System Performance Following Loss of a Single Bulk Electric System Element (Category B) 02/02/05     
TPL-002-0a System Performance Following Loss of a Single Bulk Electric System Element (Category B) 07/30/08     02/23/09
TPL-003-0 System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 02/02/05     
TPL-003-0a System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 07/30/08      02/23/09
TPL-004-0 System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 02/02/05     02/08/05
TPL-005-0 Regional and Interregional Self-Assessment Reliability Reports 02/02/05     02/08/05
TPL-006-0 Data From the Regional Reliability Organization Needed to Assess 02/02/05     02/08/05

 Voltage and Reactive

VAR-001-1 Voltage and Reactive Control 08/02/06     
VAR-001-1a Voltage and Reactive Control 03/26/08    03/26/08
VAR-002-1 Generator Operation for Maintaining Network Voltage Schedules 08/02/06     
VAR-002-1a Generator Operation for Maintaining Network Voltage Schedules 08/01/07     
VAR-002-1.1a Generator Operation for Maintaining Network Voltage Schedules 10/29/08     02/23/09 
VAR-002-1.1b Generator Operation for Maintaining Network Voltage Schedules 02/10/09     
VAR-002-WECC-1 Automatic Voltage Regulators 10/29/08     
VAR-STD-002a-1 Automatic Voltage Regulators (WECC) 03/12/07     
VAR-STD-002b-1 Power System Stabilizer (WECC) 03/12/07     
VAR-501-WECC-1 Power System Stabilizer 10/29/08     
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.  For more information download the Adobe Reader User Guide.


New Brunswick
Standards Awaiting Regulatory Approval

Standard
Number
Title (MM/DD/YY)
NERC BOT
Approval
BOT Approved Effective Date
Resource and Demand Balancing
BAL-001-0 Real Power Balancing Control Performance 02/02/05  
BAL-001-0a Real Power Balancing Control Performance 10/23/07  
BAL-001-0.1a Real Power Balancing Control Performance 10/29/08  
BAL-001-AB-0a Real Power Balancing Control Performance    
BAL-002-0 Disturbance Control Performance 02/02/05  
BAL-002-WECC-1 Contingency Reserve 10/29/08  
BAL-STD-002-0 Operating Reserves (WECC) 03/12/07  
BAL-003-0 Frequency Response and Bias 02/02/05  
BAL-003-0a Frequency Response and Bias 10/23/07
BAL-003-0b Frequency Response and Bias 02/12/08  
BAL-003-AB-0a Frequency Response and Bias    
BAL-003-0.1b Frequency Response and Bias 10/29/08  
BAL-004-0 Time Error Correction 02/02/05  
BAL-004-1

Time Error Correction

03/26/08  
BAL-004-WECC-01 Automatic Time Error Correction 03/26/08  
BAL-005-0 Automatic Generation Control 02/02/05  
BAL-005-0b Automatic Generation Control 02/12/08  
BAL-005-0.1b Automatic Generation Control 10/29/08  
BAL-006-1 Inadvertent Interchange 05/02/06  
BAL-006-1.1 Inadvertent Interchange 10/29/08  
BAL-006-AB-1 Inadvertent Interchange    

Communications

COM-001-1 Telecommunications 11/01/06  
COM-001-1.1 Telecommunications 10/29/08  
COM-002-2 Communications and Coordination 11/01/06  

Critical Infrastructure Protection

CIP-001-1 Sabotage Reporting 11/01/06  
CIP-002-1 Cyber Security — Critical Cyber Asset Identification 05/02/06  
CIP-003-1 Cyber Security — Security Management Controls 05/02/06  
CIP-004-1 Cyber Security — Personnel & Training 05/02/06  
CIP-005-1 Cyber Security — Electronic Security Perimeter(s) 05/02/06  
CIP-006-1 Cyber Security — Physical Security of Critical Cyber Assets 05/02/06  
CIP-006-1a Cyber Security — Physical Security of Critical Cyber Assets 02/12/08  
CIP-007-1 Cyber Security — Systems Security Management 05/02/06  
CIP-008-1 Cyber Security — Incident Reporting and Response Planning 05/02/06  
CIP-009-1 Cyber Security — Recovery Plans for Critical Cyber Assets 05/02/06  

Emergency Preparedness and Operations

EOP-001-0 Emergency Operations Planning 02/02/05  
EOP-001-1 Emergency Operations Planning 10/17/08  
EOP-002-2 Capacity and Energy Emergencies 11/01/06  
EOP-002-2.1 Capacity and Energy Emergencies 10/29/08  
EOP-003-1 Load Shedding Plans 11/01/06  
EOP-004-1 Disturbance Reporting 11/01/06  
EOP-005-1 System Restoration Plans 05/02/06  
EOP-006-1 Reliability Coordination System Restoration 11/01/06  
EOP-007-0 Establish, Maintain, and Document a Regional Blackstart Capability Plan 02/02/05  
EOP-008-0 Plans for Loss of Control Center Functionality 02/02/05  
EOP-009-0 Documentation of Blackstart Generating Unit Test Results 02/02/05  

Facilities Design, Connections, and Maintenance

FAC-001-0 Facility Connection Requirements 02/02/05  
FAC-002-0 Coordination of Plans For New Generation, Transmission, and End-User 02/02/05  
FAC-003-AB-1 Transmission Vegetation Management Program(R1 and R2 effective: 2010-01-26)    
FAC-003-1 Vegetation Management Program 02/07/06  
FAC-501-WECC-1 Transmission Maintenance 10/29/08  
FAC-008-1 Facility Ratings Methodology 02/07/06  
FAC-009-1 Establish and Communicate Facility Ratings 02/07/06  
FAC-010-1 System Operating Limits Methodology for the Planning Horizon 11/01/06  
FAC-010-2 System Operating Limits Methodology for the Planning Horizon 06/24/08  
FAC-011-1 System Operating Limits Methodology for the Operations Horizon 11/01/06  
FAC-011-2 System Operating Limits Methodology for the Operations Horizon 06/24/08  
FAC-012-1 Transfer Capability Methodology 02/07/06  
FAC-013-1 Establish and Communicate Transfer Capabilities 02/07/06  
FAC-014-1 Establish and Communicate System Operating Limits 11/01/06  
FAC-014-2 Establish and Communicate System Operating Limits 06/24/08  

Interchange Scheduling and Coordination

INT-001-2 Interchange Information 11/01/06  
INT-001-3 Interchange Information 10/09/07  
INT-003-AB-2 Interchange Transaction Implementation    
INT-003-2 Interchange Transaction Implementation 11/01/06  
INT-004-1 Dynamic Interchange Transaction Modifications 05/02/06  
INT-004-2 Dynamic Interchange Transaction Modifications 10/09/07  
INT-005-1 Interchange Authority Distributes Arranged Interchange 05/02/06  
INT-005-2 Interchange Authority Distributes Arranged Interchange 05/01/07  
INT-005-3 Interchange Authority Distributes Arranged Interchange 10/29/08  
INT-006-1 Response to Interchange Authority 05/02/06  
INT-006-2 Response to Interchange Authority 05/01/07  
INT-006-3 Response to Interchange Authority 10/29/08  
INT-007-1 Interchange Confirmation 05/02/06  
INT-008-1 Interchange Authority Distributes Status 05/02/06  
INT-008-2 Interchange Authority Distributes Status 05/01/07  
INT-008-3 Interchange Authority Distributes Status 10/29/08  
INT-009-1 Implementation of Interchange 05/02/06  
INT-010-1 Interchange Coordination Exemptions 05/02/06  

Interconnection Reliability Operations and Coordination

IRO-001-1 Reliability Coordination Responsibilities and Authorities 11/01/06  
IRO-001-1.1 Reliability Coordination Responsibilities and Authorities 10/29/08  
IRO-002-1 Reliability Coordination Facilities 11/01/06  
IRO-002-2 Reliability Coordination Facilities 10/17/08  
IRO-003-2 Reliability Coordination Wide-Area View 11/01/06  
IRO-004-1 Reliability Coordination Operations Planning 02/07/06  
IRO-004-2 Reliability Coordination Operations Planning 10/17/08  
IRO-005-1 Reliability Coordination Current-Day Operations 02/07/06  
IRO-005-2 Reliability Coordination Current-Day Operations 11/01/06  
IRO-005-3 Reliability Coordination Current-Day Operations 10/17/08  
IRO-006-3 Reliability Coordination Transmission Loading Relief 08/02/06  
IRO-006-4 Reliability Coordination Transmission Loading Relief 10/09/07  
IRO-006-WECC-1 Qualified Path Unscheduled Flow Relief 02/10/09  
IRO-STD-006-0 Qualified Path Unscheduled Flow Relief (WECC) 03/12/07  
IRO-008-1 Reliability Coordinator Operational Analyses and Real-time Assessments 10/17/08  
IRO-009-1 Reliability Coordinator Actions to Operate Within IROLs 10/17/08  
IRO-010-1 Reliability Coordinator Data Specification and Collection 10/17/08  
IRO-014-1 Procedures, Processes, or Plans to Support Coordination Between Reliability Coordinators 02/07/06  
IRO-015-1 Notifications and Information Exchange Between Reliability Coordinators 02/07/06  
IRO-016-1 Coordination of Real-time Activities Between Reliability Coordinators 02/07/06  

Modeling, Data, and Analysis

MOD-001-0 Documentation of Total Transfer Capability and Available Transfer Capability Calculation Methodologies 02/02/05  
MOD-001-1 Documentation of Total Transfer Capability and Available Transfer Capability Calculation Methodologies 08/26/08  
MOD-002-0 Review of Transmission Service Provider Total Transfer Capability and Available Transfer Capability Calculations and Results 02/02/05  
MOD-003-0 Regional Procedure for Input on Total Transfer Capability and Available Transfer Capability Methodologies and Values 02/02/05  
MOD-004-0 Documentation of Regional Reliability Organization Capacity Benefit Margin Methodologies 02/02/05  
MOD-004-1 Documentation of Regional Reliability Organization Capacity Benefit Margin Methodologies 11/13/08  
MOD-005-0 Procedure for Verifying Capacity Benefit Margin Values 02/02/05  
MOD-006-0 Procedures for the Use of Capacity Benefit Margin Values 02/02/05  
MOD-006-0.1 Procedures for the Use of Capacity Benefit Margin Values 10/29/08  
MOD-007-0 Documentation of the Use of Capacity Benefit Margin 02/02/05  
MOD-008-0 Documentation and Content of Each Regional Transmission Reliability Margin Methodology 02/02/05  
MOD-008-1 Documentation and Content of Each Regional Transmission Reliability Margin Methodology 08/26/08  
MOD-009-0 Procedure for Verifying Transmission Reliability Margin Values 02/02/05  
MOD-010-0 Steady-State Data for Modeling and Simulation of the Interconnected Transmission System 02/02/05  
MOD-011-0 Maintenance and Distribution of Steady-State Data Requirements and Reporting Procedures 02/02/05  
MOD-012-0 Dynamics Data for Modeling and Simulation of the Interconnected Transmission System 02/02/05  
MOD-013-1 Maintenance and Distribution of Dynamics Data Requirements and Reporting Procedures 05/02/06  
MOD-014-0 Development of Steady-State System Models 02/02/05  
MOD-015-0 Development of Dynamics System Models 02/02/05  
MOD-015-0.1 Development of Dynamics System Models 10/29/08  
MOD-016-1 Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, and Controllable Demand-Side Management   05/02/06  
MOD-016-1.1 Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, and Controllable Demand-Side Management   10/29/08  
MOD-017-0 Aggregated Actual and Forecast Demands and Net Energy for Load 02/02/05  
MOD-017-0.1 Aggregated Actual and Forecast Demands and Net Energy for Load 10/29/08  
MOD-018-0 Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load 02/02/05  
MOD-019-0 Reporting of Interruptible Demands and Direct Control Load Management 02/02/05  
MOD-019-0.1 Reporting of Interruptible Demands and Direct Control Load Management 10/29/08  
MOD-020-0 Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators 02/02/05  
MOD-021-0 Documentation of the Accounting Methodology for the Effects of Controllable Demand-Side Management in Demand and Energy Forecasts. 02/02/05  
MOD-024-1 Verification of Generator Gross and Net Real Power Capability 02/07/06  
MOD-025-1 Verification of Generator Gross and Net Reactive Power Capability 02/07/06  
MOD-028-1 Area Interchange Methodology 08/26/08  
MOD-029-1 Rated System Path Methodology 08/26/08  
MOD-030-1 Flowgate Methodology 08/26/08  
MOD-030-2 Flowgate Methodology 02/10/09  

Nuclear

NUC-001-1

Nuclear Plant Interface Coordination 05/01/07  

Personnel Performance, Training, and Qualifications

PER-001-0 Operating Personnel Responsibility and Authority 02/02/05  
PER-002-0 Operating Personnel Training 02/02/05  
PER-003-0 Operating Personnel Credentials 02/02/05  
PER-004-1 Reliability Coordination Staffing 11/01/06  
PER-004-2 Reliability Coordination Staffing 02/10/09  
PER-005-1 System Personnel Training 02/10/09  

 Protection and Control

PRC-001-1 System Protection Coordination 11/01/06  
PRC-002-1 Define Regional Disturbance Monitoring and Reporting Requirements 08/02/06  
PRC-STD-001-1 Certification of Protective Relay Applications and Settings (WECC) 03/12/07  
PRC-STD-003-1 Protective Relay and Remedial Action Scheme Misoperation (WECC) 03/12/07  
PRC-003-1 Regional Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems 02/07/06  
PRC-004-1 Analysis and Mitigation of Transmission and Generation Protection System Misoperations 02/07/06  
PRC-004-WECC-1 Protection System and Remedial Action Scheme Misoperation 10/29/08  
PRC-005-1 Transmission and Generation Protection System Maintenance and Testing 02/07/06  
PRC-STD-005-1 Transmission Maintenance (WECC) 03/12/07  
PRC-006-0 Development and Documentation of Regional Reliability Organizations’ Underfrequency Load Shedding Programs 02/02/05  
PRC-007-0 Assuring Consistency of Entity Underfrequency Load Shedding Programs with Regional Reliability Organization’s Underfrequency Load Shedding Program Requirements 02/02/05  
PRC-008-0 Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program 02/02/05  
PRC-009-0 Analysis and Documentation of Underfrequency Load Shedding 02/02/05  
PRC-010-0 Technical Assessment of the Design and Effectiveness of Undervoltage Load 02/02/05  
PRC-011-0 Undervoltage Load Shedding System Maintenance and Testing 02/02/05  
PRC-012-0 Special Protection System Review Procedure 02/02/05  
PRC-013-0 Special Protection System Database 02/02/05  
PRC-014-0 Special Protection System Assessment 02/02/05  
PRC-015-0 Special Protection System Data and Documentation 02/02/05  
PRC-016-0 Special Protection System Misoperations 02/02/05  
PRC-016-0.1 Special Protection System Misoperations 10/29/08  
PRC-017-0 Special Protection System Maintenance and Testing 02/02/05  
PRC-018-1 Disturbance Monitoring Equipment Installation and Data Reporting 08/02/06  
PRC-020-1 Under-Voltage Load Shedding Program Database 02/07/06  
PRC-021-1 Under-Voltage Load Shedding Program Data 02/07/06  
PRC-022-1 Under-Voltage Load Shedding Program Performance 02/07/06  
PRC-023-1 Transmission Relay Loadability 02/12/08  

 Transmission Operations

TOP-001-1 Reliability Responsibilities and Authorities 11/01/06  
TOP-002-2 Normal Operations Planning 11/01/06  
TOP-002-2a Normal Operations Planning 02/10/09  
TOP-003-0 Planned Outage Coordination 02/02/05  
TOP-003-1 Planned Outage Coordination 10/17/08  
TOP-004-1 Transmission Operations 11/01/06  
TOP-004-2 Transmission Operations 11/01/06  
TOP-005-AB-1 Operational Reliability Information    
TOP-005-1 Operational Reliability Information 02/07/06  
TOP-005-1.1 Operational Reliability Information 10/29/08  
TOP-005-2 Operational Reliability Information 10/17/08  
TOP-006-1 Monitoring System Conditions 11/01/06  
TOP-006-2 Monitoring System Conditions 10/17/08  
TOP-007-0 Reporting System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations 02/02/05  
TOP-007-WECC-1 System Operating Limits (WECC) 10/29/08  
TOP-STD-007-0 Operating Transfer Capability (WECC) 03/12/07  
TOP-008-1 Response to Transmission Limit Violations 11/01/06  

 Transmission Planning

TPL-001-0 System Performance Under Normal (No Contingency) Conditions (Category A) 02/02/05  
TPL-001-0.1 System Performance Under Normal (No Contingency) Conditions (Category A) 10/29/08  
TPL-002-0 System Performance Following Loss of a Single Bulk Electric System Element (Category B) 02/02/05  
TPL-002-0a System Performance Following Loss of a Single Bulk Electric System Element (Category B) 07/30/08  
TPL-003-0 System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 02/02/05  
TPL-003-0a System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 07/30/08  
TPL-004-0 System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 02/02/05  
TPL-005-0 Regional and Interregional Self-Assessment Reliability Reports 02/02/05  
TPL-006-0 Data From the Regional Reliability Organization Needed to Assess 02/02/05  

 Voltage and Reactive

VAR-001-1 Voltage and Reactive Control 08/02/06  
VAR-001-1a Voltage and Reactive Control 03/26/08  
VAR-002-1 Generator Operation for Maintaining Network Voltage Schedules 08/02/06  
VAR-002-1a Generator Operation for Maintaining Network Voltage Schedules 08/01/07  
VAR-002-1.1a Generator Operation for Maintaining Network Voltage Schedules 10/29/08  
VAR-002-1.1b Generator Operation for Maintaining Network Voltage Schedules 02/10/09  
VAR-002-WECC-1 Automatic Voltage Regulators 10/29/08  
VAR-STD-002a-1 Automatic Voltage Regulators (WECC) 03/12/07  
VAR-STD-002b-1 Power System Stabilizer (WECC) 03/12/07  
VAR-501-WECC-1 Power System Stabilizer 10/29/08  
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.


New Brunswick
Inactive Standards

Standard
Number
Title (MM/DD/YY)
Enforcement Date
Resource and Demand Balancing
     

Communications

     

Critical Infrastructure Protection

     

Emergency Preparedness and Operations

     

Facilities Design, Connections, and Maintenance

     

Interchange Scheduling and Coordination

     

Interconnection Reliability Operations and Coordination

     

Modeling, Data, and Analysis

     

Nuclear

     

Personnel Performance, Training, and Qualifications

     

 Protection and Control

     

 Transmission Operations

     

 Transmission Planning

     

 Voltage and Reactive

     