|
EOP-008-0 |
Plans for Loss of Control
Center Functionality |
02/02/05 |
04/01/05 |
|
EOP-009-0 |
Documentation of Blackstart
Generating Unit Test Results |
02/02/05 |
04/01/05 |
|
Facilities Design,
Connections, and Maintenance |
|
FAC-001-0 |
Facility Connection
Requirements
|
02/02/05 |
04/01/05 |
|
FAC-002-0 |
Coordination of Plans For
New Generation, Transmission, and End-User |
02/02/05 |
04/01/05 |
|
FAC-003-1 |
Transmission Vegetation
Management Program |
02/07/06 |
04/07/06 |
|
FAC-008-1
|
Facility Ratings
Methodology
|
02/07/06 |
05/01/06 |
|
FAC-009-1
|
Establish and Communicate
Facility Ratings
|
02/07/06 |
07/01/06 |
|
FAC-010-2 |
System Operating Limits
Methodology for the Planning Horizon |
06/24/08 |
07/01/08 |
|
FAC-011-2 |
System Operating Limits
Methodology for the Operations Horizon
|
06/24/08 |
10/01/08 |
|
FAC-012-1
|
Transfer Capability
Methodology
|
02/07/06 |
05/01/06 |
|
FAC-013-1
|
Establish and Communicate
Transfer Capabilities
|
02/07/06 |
07/01/06 |
|
FAC-014-2 |
Establish and Communicate
System Operating Limits
|
06/24/08 |
01/01/09 |
|
FAC-501-WECC-1 |
Transmission
Maintenance
|
10/29/08 |
01/01/09 |
|
Interchange Scheduling and
Coordination |
|
INT-001-3 |
Interchange Information
|
10/09/07 |
11/01/07 |
|
INT-003-2 |
Interchange Transaction
Implementation |
11/01/06 |
01/01/07 |
|
INT-004-2
|
Dynamic Interchange
Transaction Modifications
|
10/09/07 |
11/01/07 |
|
INT-005-2 |
Interchange Authority
Distributes Arranged Interchange
|
05/01/07 |
05/01/07 |
|
INT-006-2 |
Response to Interchange
Authority
|
05/01/07 |
05/01/07 |
|
INT-007-1
|
Interchange Confirmation
|
05/02/06 |
01/01/07 |
|
INT-008-2
|
Interchange Authority
Distributes Status
|
05/01/07 |
05/01/07 |
|
INT-009-1
|
Implementation of
Interchange
|
05/02/06 |
01/01/07 |
|
INT-010-1
|
Interchange Coordination
Exemptions
|
05/02/06 |
01/01/07 |
|
Interconnection
Reliability Operations and Coordination |
|
IRO-001-1.1
|
Reliability Coordination
- Responsibilities and Authorities |
10/29/08 |
10/29/08 |
|
IRO-002-2 |
Reliability Coordination -
Facilities |
10/17/08 |
04/01/09 |
|
IRO-003-2 |
Reliability Coordination -
Wide-Area View |
11/01/06 |
01/01/07 |
|
IRO-004-2 |
Reliability Coordination -
Operations Planning |
10/17/08 |
04/01/09 |
|
IRO-005-3 |
Reliability Coordination -
Current Day Operations |
10/17/08 |
04/01/09 |
|
IRO-006-4 |
Reliability Coordination -
Transmission Loading Relief |
10/09/07 |
|
|
IRO-006-4.1 |
Reliability Coordination
- Transmission Loading Relief (TLR)
|
04/15/09 |
|
|
IRO-006-WECC-1 |
Qualified Transfer
Path Unscheduled Flow Relief |
02/10/09 |
04/01/09 |
|
IRO-008-1
|
Reliability Coordinator
Operational Analyses and Real-time Assessments
|
10/17/08 |
04/01/09 |
|
IRO-009-1
|
Reliability Coordinator
Actions to Operate Within IROLs |
10/17/08 |
04/01/09 |
|
IRO-010-1
|
Reliability Coordinator
Data Specification and Collection |
10/17/08 |
04/01/09 |
|
IRO-014-1 |
Procedures, Processes, or
Plans to Support Coordination Between Reliability Coordinators
|
02/07/06 |
11/01/06 |
|
IRO-015-1 |
Notifications and
Information Exchange Between Reliability Coordinators
|
02/07/06 |
11/01/06 |
|
IRO-016-1 |
Coordination of Real-time
Activities Between Reliability Coordinators
|
02/07/06 |
11/01/06 |
|
Modeling,
Data, and Analysis |
|
MOD-001-0 |
Documentation of Total
Transfer Capability and Available Transfer Capability Calculation Methodologies |
02/02/05 |
04/01/05 |
|
MOD-002-0 |
Review of Transmission
Service Provider Total Transfer Capability and Available Transfer Capability
Calculations and Results |
02/02/05 |
04/01/05 |
|
MOD-003-0 |
Regional Procedure for
Input on Total Transfer Capability and Available Transfer Capability
Methodologies and Values |
02/02/05 |
04/01/05 |
|
MOD-004-0 |
Documentation of Regional
Capacity Benefit Margin Methodologies |
02/02/05 |
04/01/05 |
|
MOD-004-1 |
Capacity Benefit Margin |
11/13/08 |
01/01/10 |
|
MOD-005-0 |
Procedure for Verifying
Capacity Benefit Margin Values |
02/02/05 |
04/01/05 |
|
MOD-006-0.1
|
Procedures for the Use of
Capacity Benefit Margin Values |
10/29/08 |
10/29/08 |
|
MOD-007-0 |
Documentation of the Use of
Capacity Benefit Margin |
02/02/05 |
04/01/05 |
|
MOD-008-0 |
Documentation and Content
of Each Regional Transmission Reliability Margin Methodology |
02/02/05 |
04/01/05 |
|
MOD-008-1 |
Transmission Reliability
Margin Calculation Methodology |
08/26/08 |
10/01/09 |
|
MOD-009-0 |
Procedure for Verifying
Transmission Reliability Margin Values |
02/02/05 |
04/01/05 |
|
MOD-010-0 |
Steady-State Data for
Modeling and Simulation of the Interconnected Transmission System |
02/02/05 |
04/01/05 |
|
MOD-011-0 |
Maintenance and
Distribution of Steady-State Data Requirements and Reporting Procedures |
02/02/05 |
04/01/05 |
|
MOD-012-0 |
Dynamics Data for Modeling
and Simulation of the Interconnected Transmission System |
02/02/05 |
04/01/05 |
|
MOD-013-1 |
Maintenance and
Distribution of Dynamics Data Requirements and Reporting Procedures |
05/02/06 |
11/02/06 |
|
MOD-014-0 |
Development of Steady-State
System Models |
02/02/05 |
04/01/05 |
|
MOD-015-0.1
|
Development of Dynamics
System Models |
10/29/08 |
10/29/08 |
|
MOD-016-1.1
|
Documentation of Data
Reporting Requirements for Actual and Forecast Demands
|
10/29/08 |
10/29/08 |
|
MOD-017-0.1
|
Aggregated Actual and
Forecast Demands and Net Energy for Load |
10/29/08 |
10/29/08 |
|
MOD-018-0 |
Treatment of Nonmember
Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and
Net Energy for Load |
02/02/05 |
04/01/05 |
|
MOD-019-0.1
|
Reporting of
Interruptible Demands and Direct Control Load Management |
10/29/08 |
10/29/08 |
|
MOD-020-0 |
Providing Interruptible
Demands and Direct Control Load Management Data to System Operators and
Reliability Coordinators |
02/02/05 |
04/01/05 |
|
MOD-021-0 |
Documentation of the
Accounting Methodology for the Effects of Controllable DSM in Demand and Energy
Forecasts |
02/02/05 |
04/01/05 |
|
MOD-021-0.1 |
Documentation of the
Accounting Methodology for the Effects of Controllable DSM in Demand and Energy
Forecasts |
04/15/09 |
04/01/05 |
|
MOD-024-1 |
Verification of Generator
Gross and Net Real Power Capability |
02/07/06 |
04/01/06 |
|
MOD-025-1 |
Verification of Generator
Gross and Net Reactive Power Capability |
02/07/06 |
01/01/07 |
|
MOD-028-1 |
Area Interchange
Methodology |
08/26/08 |
|
|
MOD-029-1 |
Rated System Path
Methodology |
08/26/08 |
|
|
MOD-30-2 |
Flowgate Methodology |
02/10/09 |
|
|
Nuclear |
|
NUC-001-1 |
Nuclear Plant Interface
Coordination |
05/01/07 |
01/01/09 |
|
Personnel
Performance, Training, and Qualifications |
|
PER-001-0 |
Operating Personnel
Responsibility and Authority |
02/02/05 |
04/01/05 |
|
PER-001-0.1 |
Operating Personnel
Responsibility and Authority |
04/15/09 |
04/01/05 |
|
PER-003-0 |
Operating Personnel
Credentials |
02/02/05 |
04/01/05 |
|
PER-004-2 |
Reliability Coordination -
Staffing |
02/10/09 |
04/01/09 |
|
PER-005-1 |
System Personnel Training |
02/10/09 |
04/01/09 |
|
Protection
and Control |
|
PRC-001-1 |
System Protection
Coordination |
11/01/06 |
01/01/07 |
|
PRC-002-1 |
Define Regional Disturbance
Monitoring and Reporting Requirements |
08/02/06 |
05/02/07 |
|
PRC-003-1 |
Regional Procedure for
Analysis of Misoperations of Transmission and Generation Protection Systems |
02/07/06 |
05/01/06 |
|
PRC-004-1 |
Analysis and Mitigation of
Transmission and Generation Protection System Misoperations |
02/07/06 |
08/01/06 |
|
PRC-004-WECC-1
|
Protection System and
Remedial Action Scheme Misoperation (WECC) |
10/29/08 |
04/01/09 |
|
PRC-005-1 |
Transmission and Generation
Protection System Maintenance and Testing |
02/07/06 |
05/01/06 |
|
PRC-006-0 |
Development and
Documentation of Regional UFLS Programs |
02/02/05 |
04/01/05 |
|
PRC-007-0 |
Assuring Consistency of
Entity Underfrequency Load Shedding Programs |
02/02/05 |
04/01/05 |
|
PRC-008-0 |
Implementation and
Documentation of Underfrequency Load Shedding Equipment Maintenance Program |
02/02/05 |
04/01/05 |
|
PRC-009-0 |
Analysis and Documentation
of Underfrequency Load Shedding Performance Following an Underfrequency Event |
02/02/05 |
04/01/05 |
|
PRC-010-0 |
Technical Assessment of the
Design and Effectiveness of Undervoltage Load Shedding Program |
02/02/05 |
04/01/05 |
|
PRC-011-0 |
Undervoltage Load Shedding
System Maintenance and Testing |
02/02/05 |
04/01/05 |
|
PRC-012-0 |
Special Protection System
Review Procedure |
02/02/05 |
04/01/05 |
|
PRC-013-0 |
Special Protection System
Database |
02/02/05 |
04/01/05 |
|
PRC-014-0 |
Special Protection System
Assessment |
02/02/05 |
04/01/05 |
|
PRC-015-0 |
Special Protection System
Data and Documentation |
02/02/05 |
04/01/05 |
|
PRC-016-0.1
|
Special Protection System
Misoperations |
10/29/08 |
10/29/08 |
|
PRC-017-0 |
Special Protection System
Maintenance and Testing |
02/02/05 |
04/01/05 |
|
PRC-018-1 |
Disturbance Monitoring
Equipment Installation and Data Reporting |
08/02/06 |
05/02/07 |
|
PRC-020-1 |
Under-Voltage Load Shedding
Program Database |
02/07/06 |
05/01/06 |
|
PRC-021-1 |
Under-Voltage Load Shedding
Program Data |
02/07/06 |
08/01/06 |
|
PRC-022-1 |
Under-Voltage Load Shedding
Program Performance |
02/07/06 |
05/01/06 |
|
PRC-023-1 |
Transmission Relay
Loadability |
02/12/08 |
04/01/08 |
|
Transmission
Operations |
|
TOP-001-1 |
Reliability
Responsibilities and Authorities |
11/01/06 |
01/01/07 |
|
TOP-002-2a |
Normal Operations Planning |
02/10/09 |
02/10/09 |
|
TOP-003-1 |
Planned Outage Coordination |
10/17/08 |
04/01/09 |
|
TOP-004-2 |
Transmission Operations |
11/01/06 |
01/01/09 |
|
TOP-005-2 |
Operational Reliability
Information |
10/17/08 |
04/01/09 |
|
TOP-006-2 |
Monitoring System
Conditions |
10/17/08 |
04/01/09 |
|
TOP-007-0 |
Reporting System Operating
Limit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations |
02/02/05 |
04/01/05 |
|
TOP-007-WECC-1
|
System Operating
Limits (WECC) |
10/29/08 |
01/01/09 |
|
TOP-008-1 |
Response to Transmission
Limit Violations |
11/01/06 |
01/01/07 |
|
Transmission
Planning |
|
TPL-001-0.1
|
System Performance Under
Normal (No Contingency) Conditions (Category A) |
10/29/08 |
10/29/08 |
|
TPL-002-0a
|
System Performance
Following Loss of a Single Bulk Electric System Element (Category B) |
07/30/08 |
07/30/08 |
|
TPL-003-0a |
System Performance
Following Loss of Two or More Bulk Electric System Elements (Category C) |
07/30/08 |
07/30/08 |
|
TPL-004-0 |
System Performance
Following Extreme Events Resulting in the Loss of Two or More Bulk Electric
System Elements (Category D) |
02/02/05 |
04/01/05 |
|
TPL-005-0 |
Regional and Interregional
Self-Assessment Reliability Reports |
02/02/05 |
04/01/05 |
|
TPL-006-0 |
Data From the Regional
Reliability Organization Needed to Assess Reliability |
02/02/05 |
04/01/05 |
|
TPL-006-0.1 |
Data From the Regional
Reliability Organization Needed to Assess Reliability |
04/15/09 |
04/01/05 |
|
Voltage and
Reactive |
|
VAR-001-1a |
Voltage and Reactive
Control |
03/26/08 |
03/26/08 |
|
VAR-002-1.1b |
Generator Operation for
Maintaining Network Voltage Schedules |
02/10/09 |
02/10/09 |
|
VAR-002-WECC-1
|
Automatic Voltage
Regulators (AVR) (WECC) |
10/29/08 |
01/01/09 |
|
VAR-501-WECC-1
|
Power System
Stabilizer (PSS) (WECC) |
10/29/08 |
01/01/09 |
|
To download a file click on the file using your right mouse button, then save
it to your computer in a directory of your choice. |