Reliability Standards Effective Dates for Mandatory Enforcement

Mandatory Standards Subject to Enforcement | Standards Awaiting Regulatory Approval |

Inactive Standards | Mandatory Standards Subject to Future Enforcement

 

Section 215 of the Federal Power Act requires the Electric Reliability Organization (ERO) to develop mandatory and enforceable reliability standards, which are subject to Commission review and approval.  Commission-approved reliability standards become mandatory and enforceable in the U.S. on a date established in the Orders approving the standards.

NERC Board of Trustees Approval: the date on which the NERC Board of Trustees adopted the standards.

Regulatory Approval Date: the date the applicable regulatory authority approved the standard to be implemented in the jurisdiction.

Mandatory Implementation Date: the date on which the standard becomes mandatory and enforceable in accordance with the existing laws of the jurisdiction and the approval granted by the regulatory authority.

BOT Approved Effective Date: the date approved by the NERC Board of Trustees for the standard to be implemented.

Last Update — July 30, 2010


United States
Mandatory Standards Subject to Enforcement

Standard
Number
Title (MM/DD/YY)
NERC BOT
Approval
Regulatory Approval Date Mandatory
Implementation
Date
Resource and Demand Balancing
BAL-001-0.1a Real Power Balancing Control Performance 10/29/08 05/13/09 05/13/09
BAL-002-0 Disturbance Control Performance 02/08/05 03/16/07 06/18/07
BAL-STD-002-0 Operating Reserves (WECC) 03/12/07 06/08/07 06/18/07
BAL-003-0.1b Frequency Response and Bias 10/29/08 05/13/09 05/13/09
BAL-004-0 Time Error Correction 02/08/05 03/16/07 06/18/07
BAL-004-WECC-01 Automatic Time Error Correction 03/26/08 05/21/09 07/01/09
BAL-005-0.1b Automatic Generation Control 10/29/08 05/13/09 05/13/09
BAL-006-1.1 Inadvertent Interchange 10/29/08 05/13/09 05/13/09

Communications

COM-001-1.1 Telecommunications 10/29/08 05/13/09 05/13/09
COM-002-2 Communications and Coordination 11/01/06 03/16/07 06/18/07

Critical Infrastructure Protection

CIP-001-1 Sabotage Reporting 11/01/06 03/16/07 06/18/07
CIP-002-2 Cyber Security - Critical Cyber Asset Identification 05/06/09 09/30/09 04/01/10
CIP-003-2 Cyber Security - Security Management Controls 05/06/09 09/30/09 04/01/10
CIP-004-2 Cyber Security - Personnel & Training 05/06/09 09/30/09 04/01/10
CIP-005-2 Cyber Security - Electronic Security Perimeter(s) 05/06/09 09/30/09 04/01/10
CIP-006-2c Cyber Security - Physical Security of Critical Cyber Assets 02/16/10 07/15/10 07/15/10
CIP-007-2a Cyber Security - Systems Security Management 11/05/09 03/18/10 04/01/10
CIP-008-2 Cyber Security - Incident Reporting and Response Planning 05/06/09 09/30/09 04/01/10
CIP-009-2 Cyber Security - Recovery Plans for Critical Cyber Assets 05/06/09 09/30/09 04/01/10

Emergency Preparedness and Operations

EOP-001-0 Emergency Operations Planning 02/08/05 03/16/07 06/18/07
EOP-002-2.1 Capacity and Energy Emergencies 10/29/08 05/13/09 05/13/09
EOP-003-1 Load Shedding Plans 11/01/06 03/16/07 06/18/07
EOP-004-1 Disturbance Reporting 11/01/06 03/16/07 06/18/07
EOP-005-1 System Restoration Plans 05/02/06 03/16/07 06/18/07
EOP-006-1 Reliability Coordination - System Restoration 11/01/06 03/16/07 06/18/07
EOP-008-0 Plans for Loss of Control Center Functionality 02/08/05 03/16/07 06/18/07
EOP-009-0 Documentation of Blackstart Generating Unit Test Results 02/08/05 03/16/07 06/18/07

Facilities Design, Connections, and Maintenance

FAC-001-0 Facility Connection Requirements 02/08/05 03/16/07 06/18/07
FAC-002-0 Coordination of Plans For New Generation, Transmission, and End-User 02/08/05 03/16/07 06/18/07
FAC-003-1 Transmission Vegetation Management Program 02/07/06 03/16/07 06/18/07
FAC-008-1 Facility Ratings Methodology 02/07/06 03/16/07 06/18/07
FAC-009-1 Establish and Communicate Facility Ratings 02/07/06 03/16/07 06/18/07
FAC-010-2.1 System Operating Limits Methodology for the Planning Horizon 11/05/09 04/19/10 04/19/10
FAC-011-2 System Operating Limits Methodology for the Operations Horizon 06/24/08 03/20/09 04/29/09
FAC-013-1 Establish and Communicate Transfer Capabilities 02/07/06 03/16/07 06/18/07
FAC-014-2 Establish and Communicate System Operating Limits 06/24/08 03/20/09 04/29/09

Interchange Scheduling and Coordination

INT-001-3 Interchange Information  10/09/07 07/21/08 08/28/08
INT-003-2 Interchange Transaction Implementation 11/01/06 03/16/07 06/18/07
INT-004-2 Dynamic Interchange Transaction Modifications 10/09/07 07/21/08 08/28/08
INT-005-3 Interchange Authority Distributes Arranged Interchange 10/29/08 12/17/09 07/01/10
INT-006-3 Response to Interchange Authority 10/29/08 12/17/09 07/01/10
INT-007-1 Interchange Confirmation 05/02/06 03/16/07 06/18/07
INT-008-3 Interchange Authority Distributes Status 10/29/08 12/17/09 07/01/10
INT-009-1 Implementation of Interchange 05/02/06 03/16/07 06/18/07
INT-010-1 Interchange Coordination Exemptions 05/02/06 03/16/07 06/18/07

Interconnection Reliability Operations and Coordination

IRO-001-1.1 Reliability Coordination - Responsibilities and Authorities 10/29/08 05/13/09 05/13/09
IRO-002-1 Reliability Coordination - Facilities 11/01/06 03/16/07 06/18/07
IRO-003-2 Reliability Coordination - Wide-Area View 11/01/06 03/16/07 06/18/07
IRO-004-1 Reliability Coordination - Operations Planning 02/07/06 03/16/07 06/18/07
IRO-005-2 Reliability Coordination - Current-Day Operations 11/01/06 01/22/09 01/22/09
IRO-006-4.1 Reliability Coordination - Transmission Loading Relief (TLR) 04/15/09 12/10/09 12/10/09
IRO-STD-006-0 Qualified Path Unscheduled Flow Relief (WECC) 03/12/07 06/08/07 06/18/07
IRO-014-1 Procedures, Processes, or Plans to Support Coordination Between Reliability Coordinators 02/07/06 03/16/07 06/18/07
IRO-015-1 Notifications and Information Exchange Between Reliability Coordinators 02/07/06 03/16/07 06/18/07
IRO-016-1 Coordination of Real-time Activities Between Reliability Coordinators 02/07/06 03/16/07 06/18/07

Modeling, Data, and Analysis

MOD-006-0.1 Procedures for the Use of Capacity Benefit Margin Values 10/29/08 05/13/09 05/13/09
MOD-007-0 Documentation of the Use of Capacity Benefit Margin 02/08/05 03/16/07 06/18/07
MOD-010-0 Steady-State Data for Modeling and Simulation of the Interconnected Transmission System 02/08/05 03/16/07 06/18/07
MOD-012-0 Dynamics Data for Modeling and Simulation of the Interconnected Transmission System 02/08/05 03/16/07 06/18/07
MOD-016-1.1 Documentation of Data Reporting Requirements for Actual and Forecast Demands 10/29/08 05/13/09 05/13/09
MOD-017-0.1 Aggregated Actual and Forecast Demands and Net Energy for Load 10/29/08 05/13/09 05/13/09
MOD-018-0 Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load 02/08/05 03/16/07 06/18/07
MOD-019-0.1 Reporting of Interruptible Demands and Direct Control Load Management 10/29/08 05/13/09 05/13/09
MOD-020-0 Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators 02/08/05 03/16/07 06/18/07
MOD-021-0.1 Documentation of the Accounting Methodology for the Effects of Controllable DSM in Demand and Energy Forecasts 04/15/09 12/10/09 12/10/09

Nuclear

NUC-001-2 Nuclear Plant Interface Coordination 08/05/09 1/21/10 04/01/10

Personnel Performance, Training, and Qualifications

PER-001-0.1 Operating Personnel Responsibility and Authority 04/15/09 12/10/09 12/10/09
PER-002-0 Operating Personnel Training 02/08/05 03/16/07 06/18/07
PER-003-0 Operating Personnel Credentials 02/08/05 03/16/07 06/18/07
PER-004-1 Reliability Coordination - Staffing 11/01/06 03/16/07 06/18/07

 Protection and Control

PRC-001-1 System Protection Coordination 11/01/06 03/16/07 06/18/07
PRC-STD-001-1 Certification of Protective Relay Applications and Settings (WECC) 03/12/07 06/08/07 06/18/07
PRC-STD-003-1 Protective Relay and Remedial Action Scheme Misoperation (WECC) 03/12/07 06/08/07 06/18/07
PRC-004-1 Analysis and Mitigation of Transmission and Generation Protection System Misoperations 02/07/06 03/16/07 06/18/07
PRC-005-1 Transmission and Generation Protection System Maintenance and Testing 02/07/06 03/16/07 06/18/07
PRC-STD-005-1 Transmission Maintenance (WECC) 03/12/07 06/08/07 06/18/07
PRC-007-0 Assuring Consistency of Entity Underfrequency Load Shedding Programs 02/08/05 03/16/07 06/18/07
PRC-008-0 Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program 02/08/05 03/16/07 06/18/07
PRC-009-0 Analysis and Documentation of Underfrequency Load Shedding Performance Following an Underfrequency Event 02/08/05 03/16/07 06/18/07
PRC-010-0 Technical Assessment of the Design and Effectiveness of Undervoltage Load Shedding Program 02/08/05 03/16/07 06/18/07
PRC-011-0 Undervoltage Load Shedding System Maintenance and Testing 02/08/05 03/16/07 06/18/07
PRC-015-0 Special Protection System Data and Documentation 02/08/05 03/16/07 06/18/07
PRC-016-0.1 Special Protection System Misoperations 10/29/08 05/13/09 05/13/09
PRC-017-0 Special Protection System Maintenance and Testing 02/08/05 03/16/07 06/18/07
PRC-018-1 Disturbance Monitoring Equipment Installation and Data Reporting 08/02/06 03/16/07 06/18/07
PRC-021-1 Under-Voltage Load Shedding Program Data 02/07/06 03/16/07 06/18/07
PRC-022-1 Under-Voltage Load Shedding Program Performance 02/07/06 03/16/07 06/18/07
PRC-023-1 Transmission Relay Loadability 02/12/08 03/18/10 7/1/2010

 Transmission Operations

TOP-001-1 Reliability Responsibilities and Authorities 11/01/06 03/16/07 06/18/07
TOP-002-2a Normal Operations Planning 02/10/09 12/02/09 12/02/09
TOP-003-0 Planned Outage Coordination 02/08/05 03/16/07 06/18/07
TOP-004-2 Transmission Operations 11/01/06 01/22/09 01/22/09
TOP-005-1.1 Operational Reliability Information 10/29/08 05/13/09 05/13/09
TOP-006-1 Monitoring System Conditions 11/01/06 03/16/07 06/18/07
TOP-007-0 Reporting System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations 02/08/05 03/16/07 06/18/07
TOP-STD-007-0 Operating Transfer Capability (WECC) 03/12/07 06/08/07 06/18/07
TOP-008-1 Response to Transmission Limit Violations 11/01/06 03/16/07 06/18/07

 Transmission Planning

TPL-001-0.1 System Performance Under Normal (No Contingency) Conditions (Category A) 10/29/08 05/13/09 05/13/09
TPL-002-0a System Performance Following Loss of a Single Bulk Electric System Element (Category B) 7/30/2008 04/23/10 04/23/10
TPL-003-0a System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 7/30/2008 04/23/10 04/23/10
TPL-004-0 System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 02/08/05 03/16/07 06/18/07

 Voltage and Reactive

VAR-001-1 Voltage and Reactive Control 08/02/06 03/16/07 06/18/07
VAR-002-1.1a Generator Operation for Maintaining Network Voltage Schedules 10/29/08 05/13/09 05/13/09
VAR-STD-002a-1 Automatic Voltage Regulators (WECC) 03/12/07 06/08/07 06/18/07
VAR-STD-002b-1 Power System Stabilizer (WECC) 03/12/07 06/08/07 06/18/07
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

United States
Standards Subject to Future Enforcement

Standard
Number
Title (MM/DD/YY)
NERC BOT
Approval
Regulatory Approval Date Mandatory
Implementation
Date
Resource and Demand Balancing
         

Communications

         

Critical Infrastructure Protection

CIP-002-3 Cyber Security - Critical Cyber Asset Identification 12/16/09 03/31/10 10/01/10
CIP-003-3 Cyber Security - Security Management Controls 12/16/09 03/31/10 10/01/10
CIP-004-3 Cyber Security - Personnel & Training 12/16/09 03/31/10 10/01/10
CIP-005-3 Cyber Security - Electronic Security Perimeter(s) 12/16/09 03/31/10 10/01/10
CIP-006-3 Cyber Security - Physical Security of Critical Cyber Assets 12/16/09 03/31/10 10/01/10
CIP-007-3 Cyber Security - Systems Security Management 12/16/09 03/31/10 10/01/10
CIP-008-3 Cyber Security - Incident Reporting and Response Planning 12/16/09 03/31/10 10/01/10
CIP-009-3 Cyber Security - Recovery Plans for Critical Cyber Assets 12/16/09 03/31/10 10/01/10

Emergency Preparedness and Operations

         

Facilities Design, Connections, and Maintenance

         

Interchange Scheduling and Coordination

         

Interconnection Reliability Operations and Coordination

         

Modeling, Data, and Analysis

MOD-001-1 Available Transmission System Capability 08/26/08 11/24/09 04/01/11
MOD-004-1 Capacity Benefit Margin 11/13/08 11/24/09 04/01/11
MOD-008-1 Transmission Reliability Margin Calculation Methodology 08/26/08 11/24/09 04/01/11
MOD-028-1 Area Interchange Methodology 08/26/08 11/24/09 04/01/11
MOD-029-1 Rated System Path Methodology 08/26/08 11/24/09 04/01/11
MOD-030-2 Flowgate Methodology 02/10/09 11/24/09 04/01/11

Nuclear

 

       

Personnel Performance, Training, and Qualifications

         

 Protection and Control

         

 Transmission Operations

         

 Transmission Planning

         

 Voltage and Reactive

         
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

United States
Standards Awaiting Regulatory Approval

Standard
Number
Title (MM/DD/YY)
NERC BOT
Approval
BOT Approved Effective Date
Resource and Demand Balancing
BAL-002-WECC-1 Contingency Reserve 10/29/08 01/27/09
BAL-502-RFC-02

Planned Resource Adequacy Assessment

08/05/09 TBD
BAL-004-1

Time Error Correction

03/26/08 03/26/08

Communications

       

Critical Infrastructure Protection

CIP-001-1a Cyber Security - Sabotage Reporting 02/16/10 TBD
CIP-005-1a Cyber Security - Electronic Security Perimeter(s) 02/16/10 TBD
CIP-005-2a Cyber Security - Electronic Security Perimeter(s) 02/16/10 TBD
CIP-006-1a Physical Security of Critical Cyber Assets 02/12/08 TBD
CIP-006-1b Physical Security of Critical Cyber Assets 08/05/09 TBD
CIP-006-1c Cyber Security - Physical Security of Critical Cyber Assets 02/16/10 TBD

Emergency Preparedness and Operations

EOP-001-1 Emergency Operations Planning 10/17/08 04/01/09
EOP-001-2 Emergency Operations Planning 08/05/09 TBD
EOP-005-2 System Restoration from Blackstart Resources 08/05/09 TBD
EOP-006-2 System Restoration Coordination 08/05/09 TBD
EOP-007-0 Establish, Maintain, and Document a Regional Blackstart Capability Plan 02/02/05 04/01/05

Facilities Design, Connections, and Maintenance

FAC-012-1 Transfer Capability Methodology  02/07/06 05/01/06
FAC-501-WECC-1 Transmission Maintenance 10/29/08 01/01/09

Interchange Scheduling and Coordination

       

Interconnection Reliability Operations and Coordination

IRO-002-2 Reliability Coordination - Facilities 10/17/08 04/01/09
IRO-004-2 Reliability Coordination - Operations Planning 10/17/08 04/01/09
IRO-005-2a Reliability Coordination - Current Day Operations 11/05/09 TBD
IRO-005-3 Reliability Coordination - Current Day Operations 10/17/08 04/01/09
IRO-006-WECC-1 Qualified Transfer Path Unscheduled Flow Relief 02/10/09 04/01/09
IRO-008-1 Reliability Coordinator Operational Analyses and Real-time Assessments 10/17/08 04/01/09
IRO-009-1 Reliability Coordinator Actions to Operate Within IROLs  10/17/08 04/01/09
IRO-010-1 Reliability Coordinator Data Specification and Collection 10/17/08 04/01/09
IRO-010-1a Reliability Coordinator Data Specification and Collection 08/05/09 TBD

Modeling, Data, and Analysis

MOD-011-0 Maintenance and Distribution of Steady-State Data Requirements and Reporting Procedures 02/02/05 04/01/05
MOD-013-1 Maintenance and Distribution of Dynamics Data Requirements and Reporting Procedures 05/02/06 11/02/06
MOD-014-0 Development of Steady-State System Models 02/02/05 04/01/05
MOD-015-0 Development of Dynamics System Models 02/02/05 04/01/05
MOD-015-0.1 Development of Dynamics System Models 10/29/08 10/29/08
MOD-024-1 Verification of Generator Gross and Net Real Power Capability 02/07/06 04/01/06
MOD-025-1 Verification of Generator Gross and Net Reactive Power Capability 02/07/06 01/01/07

Nuclear

       

Personnel Performance, Training, and Qualifications

PER-004-2 Reliability Coordination - Staffing 02/10/09 04/01/09
PER-005-1 System Personnel Training 02/10/09 04/01/09

 Protection and Control

PRC-002-1 Define Regional Disturbance Monitoring and Reporting Requirements 08/02/06 05/02/07
PRC-003-1 Regional Procedure for Analysis of Misoperations of Transmission and Generation Protection Systems 02/07/06 05/01/06
PRC-004-WECC-1 Protection System and Remedial Action Scheme Misoperation (WECC) 10/29/08 04/01/09
PRC-006-0 Development and Documentation of Regional UFLS Programs 02/02/05 04/01/05
PRC-012-0 Special Protection System Review Procedure 02/02/05 04/01/05
PRC-013-0 Special Protection System Database 02/02/05 04/01/05
PRC-014-0 Special Protection System Assessment 02/02/05 04/01/05
PRC-020-1 Under-Voltage Load Shedding Program Database 02/07/06 05/01/06

 Transmission Operations

TOP-003-1 Planned Outage Coordination 10/17/08 04/01/09
TOP-005-1.1a Operational Reliability Information 11/05/09 TBD
TOP-005-2 Operational Reliability Information 10/17/08 04/01/09
TOP-006-2 Monitoring System Conditions 10/17/08 04/01/09
TOP-007-WECC-1 System Operating Limits (WECC) 10/29/08 01/01/09

 Transmission Planning

TPL-003-0a System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 07/30/08 07/30/08
TPL-005-0 Regional and Interregional Self-Assessment Reliability Reports 02/02/05 04/01/05
TPL-006-0 Data From the Regional Reliability Organization Needed to Assess Reliability 02/02/05 04/01/05
TPL-006-0.1 Data From the Regional Reliability Organization Needed to Assess Reliability 04/15/09 04/15/09

 Voltage and Reactive

VAR-002-1.1b Generator Operation for Maintaining Network Voltage Schedules 02/10/09 02/10/09
VAR-002-WECC-1 Automatic Voltage Regulators (AVR) (WECC) 10/29/08 01/01/09
VAR-501-WECC-1 Power System Stabilizer (PSS) (WECC) 10/29/08 01/01/09
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

United States
Inactive Standards

Standard
Number
Title (MM/DD/YY)
Initial Enforcement Date Inactive Date
Resource and Demand Balancing
BAL-001-0 Real Power Balancing Control Performance 06/18/07 08/28/08
BAL-001-0a Real Power Balancing Control Performance 08/28/08 05/12/09
BAL-003-0 Frequency Response and Bias 06/18/07 08/28/08
BAL-003-0a Frequency Response and Bias 08/28/08 05/12/09
BAL-003-0b Frequency Response and Bias 05/21/09 05/12/09
BAL-005-0 Automatic Generation Control 06/18/07 08/28/08
BAL-005-0b Automatic Generation Control 08/28/08 05/12/09
BAL-006-1 Inadvertent Interchange 06/18/07 05/12/09

Communications

COM-001-1 Telecommunications 06/18/07 05/12/09

Critical Infrastructure Protection

CIP-002-1 Critical Cyber Asset Identification 07/01/08 03/31/10
CIP-003-1 Security Management Controls 07/01/08 03/31/10
CIP-004-1 Personnel & Training 07/01/08 03/31/10
CIP-005-1 Electronic Security Perimeter(s) 07/01/08 03/31/10
CIP-006-1 Physical Security of Critical Cyber Assets 07/01/08 03/31/10
CIP-006-2

Cyber Security — Physical Security of Critical Cyber Assets

04/01/10 7/14/10
CIP-007-1 Systems Security Management 07/01/08 03/31/10
CIP-007-2 Cyber Security - Systems Security Management 03/31/10 03/31/10
CIP-008-1 Incident Reporting and Response Planning 07/01/08 03/31/10
CIP-009-1 Recovery Plans for Critical Cyber Assets 07/01/08 03/31/10

Emergency Preparedness and Operations

EOP-002-2 Capacity and Energy Emergencies 06/18/07 05/12/09

Facilities Design, Connections, and Maintenance

FAC-010-1 System Operating Limits Methodology for the Planning Horizon 07/01/08 04/28/09
FAC-010-2 System Operating Limits Methodology for the Planning Horizon 04/29/09 04/18/10
FAC-011-1 System Operating Limits Methodology for the Operations Horizon 10/01/08 04/28/09
FAC-014-1

Establish and Communicate System Operating Limits

01/01/09 04/28/09

Interchange Scheduling and Coordination

INT-001-2 Interchange Transaction Tagging 06/18/07 08/28/08
INT-004-1 Interchange Transaction Modifications 06/18/07 08/28/08
INT-005-1 Interchange Authority Distributes Arranged Interchange 06/18/07 08/28/08
INT-005-2 Interchange Authority Distributes Arranged Interchange 08/28/08 06/30/10
INT-006-1 Response to Interchange Authority 06/18/07 08/28/08
INT-006-2 Response to Interchange Authority 08/28/08 06/30/10
INT-008-1 Interchange Authority Distributes Status 06/18/07 08/28/08
INT-008-2 Interchange Authority Distributes Status 08/28/08 06/30/10

Interconnection Reliability Operations and Coordination

IRO-001-1 Reliability Coordination – Responsibilities and Authorities 06/18/07 05/12/09
IRO-005-1 Reliability Coordination – Current Day Operations 06/18/07 01/22/09
IRO-006-3 Reliability Coordination - Transmission Loading Relief 03/16/07 04/24/09
IRO-006-4 Reliability Coordination - Transmission Loading Relief 04/23/09 12/09/09

Modeling, Data, and Analysis

MOD-001-0 Documentation of Total Transfer Capability and Available Transfer Capability Calculation Methodologies n/a Withdrawn
MOD-002-0 Review of Transmission Service Provider Total Transfer Capability and Available Transfer Capability Calculations and Results n/a Withdrawn
MOD-003-0 Regional Procedure for Input on Total Transfer Capability and Available Transfer Capability Methodologies and Values n/a Withdrawn
MOD-004-0 Documentation of Regional Capacity Benefit Margin Methodologies n/a Withdrawn
MOD-005-0 Procedure for Verifying Capacity Benefit Margin Values n/a Withdrawn
MOD-006-0

Procedure for the Use of CBM Values

06/18/07 05/12/09
MOD-008-0 Documentation and Content of Each Regional Transmission Reliability Margin Methodology n/a Withdrawn
MOD-009-0 Procedure for Verifying Transmission Reliability Margin Values n/a Withdrawn
MOD-016-1 Documentation of Data Reporting Requirements for Actual and Forecast Demands  06/18/07 05/12/09
MOD-017-0 Aggregated Actual and Forecast Demands and Net Energy for Load 06/18/07 05/12/09
MOD-019-0 Reporting of Interruptible Demands and Direct Control Load Management 06/18/07 05/12/09
MOD-021-0 Documentation of the Accounting Methodology for the Effects of Controllable DSM in Demand and Energy Forecasts 06/18/07 12/09/09
MOD-030-1 Flowgate Methodology n/a Withdrawn

Nuclear

NUC-001-1 Nuclear Plant Interface Coordination n/a 03/31/10

Personnel Performance, Training, and Qualifications

PER-001-0 Operating Personnel Responsibility and Authority 06/18/07 12/09/09

 Protection and Control

PRC-016-0 Special Protection System Misoperations 06/18/07 05/12/09

 Transmission Operations

TOP-002-2 Normal Operations Planning 06/18/07 12/01/09
TOP-004-1 Transmission Operations 06/18/07 01/22/09
TOP-005-1 Operational Reliability Information 06/18/07 05/12/09

 Transmission Planning

TPL-001-0 System Performance Under Normal (No Contingency) Conditions (Category A) 06/18/07 05/12/09
TPL-002-0 System Performance Following Loss of a Single Bulk Electric System Element (Category B) 06/18/07 04/22/10
TPL-003-0 System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) 06/18/07 04/22/10

 Voltage and Reactive

VAR-001-1a Voltage and Reactive Control BOT withdrew approval 08/05/09 Remanded May 21, 2009
VAR-002-1a Generator Operations for Maintaining Network Voltage Schedules 08/28/08 05/12/09
VAR-002-1 Generator Operations for Maintaining Network Voltage Schedules 6/18/07 08/28/08
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Herb Schrayshuen at herb.schrayshuen@nerc.net or 609-452-8060.