Phase III–IV Planning Standards
Registered Ballot Body | Related Files
|
Reliability Standards Home Page
|
Drafting Team
Rosters
Status
Field testing of the generator capability verification (2) and protection
and control (2) standards is expected to continue into 2007.
Purpose/Industry Need
Certain
planning standards that were part of the Phase III–IV
NERC compliance program were not included in the Version 0 reliability
standards. The Version 0 drafting team, supported by industry
comments, realized it could not achieve industry consensus on these specific
standards in the timeframe or within the scope of the Version 0 standards
project. These standards are important, nonetheless, as they contain
critical reliability requirements in support of recommendations from the
NERC and U.S./Canada Power System Outage Task Force reports on the August
14, 2003 blackout. Recognizing the importance of these standards, the
NERC board resolved on October 15, 2004, that: "A satisfactory resolution of
the issues regarding Phases III and IV of the planning standards would be
to: (1) develop reliability standards covering the Phase III and Phase IV
issues separate from the Version 0 effort, using the NERC standards
development process; (2) have the Planning Committee expeditiously complete
the drafting of the proposed standards needed to address the Phase III and
Phase IV issues, and move those standards through the NERC standards
development process as promptly as possible, but not later than the May 2005
board meeting." This SAR proposes the development of reliability
standards that address the disturbance monitoring and reporting requirements
of those Phase III-IV planning standards.
|