|
Project 2008-18
Interpretation
−TOP-005-1
and IRO-005-1 −
Manitoba Hydro
Status:
The interpretation was approved by the NERC Board of Trustees on
November 5, 2009
and filed with FERC.
Summary:
Manitoba Hydro requests an interpretation of the meaning of the term
“degraded/degradation” as used in NERC Standards TOP-005-1 and IRO-005-1
and specifically, whether a Special Protection System that is operating
with only one communication channel in service would be considered
“degraded” for the purposes of these standards.
Purpose/Industry Need:
In accordance with the Reliability Standards
Development Procedure, the interpretation must be posted for a 30-day
pre-ballot review, and then balloted.
There is no public comment period for an interpretation.
Balloting will be conducted following the same method used for
balloting standards.
If the interpretation is approved by its ballot pool, then the
interpretation will be appended to the standard and will become
effective when adopted by the NERC Board of Trustees and approved by the
applicable regulatory authorities. The interpretation will remain
appended to the standard until the standard is revised through the
normal standards development process.
When the standard is revised, the clarifications provided by the
interpretation will be incorporated into the revised standard.
|