Project 2009-13
Interpretation of
CIP-006-1
R1.1
Status:
The interpretation was approved
by the NERC
Board of Trustees on February 16, 2010.
Summary:
The request asks to clarify the following: If a completely enclosed
border cannot be created, what does the phrase, “to control physical
access" require? Must the alternative measure be physical in nature?
If so, must the physical barrier literally prevent physical access e.g.
using concrete encased fiber, or can the alternative measure effectively
mitigate the risks associated with physical access through cameras,
motions sensors, or encryption? Does this requirement preclude the
application of logical controls as an alternative measure in mitigating
the risks of physical access to Critical Cyber Assets?
Interpretation
Process:
In accordance with the Reliability Standards
Development Procedure, the interpretation must be posted for a 30-day
pre-ballot review, and then balloted.
There is no public comment period for an interpretation.
Balloting will be conducted following the same method used for
balloting standards.
If the interpretation is approved by its ballot pool, then the
interpretation will be appended to the standard and will become
effective when adopted by the NERC Board of Trustees and approved by the
applicable regulatory authorities. The interpretation will remain
appended to the standard until the standard is revised through the
normal standards development process.
When the standard is revised, the clarifications provided by the
interpretation will be incorporated into the revised standard. |