Project 2009-25
Interpretation of BAL-001-0.1a and BAL-002-0 for the Bonneville Power
Administration
Status:
The initial ballot for an
interpretation of standards BAL-001-0.1a — Real Power Balancing Control
Performance and BAL-002-0 — Disturbance Control Performance for the
Bonneville Power Administration ended on January 15, 2010.
Since at least one negative ballot included a comment, these results are
not final. A second (or recirculation) ballot must be conducted.
Purpose/Industry Need:
In accordance with the Reliability Standards
Development Procedure, the interpretation must be posted for a 30-day
pre-ballot review, and then balloted.
There is no public comment period for an interpretation.
Balloting will be conducted following the same method used for
balloting standards.
If the interpretation is approved by its ballot pool, then the
interpretation will be appended to the standard and will become
effective when adopted by the NERC Board of Trustees and approved by the
applicable regulatory authorities. The interpretation will remain
appended to the standard until the standard is revised through the
normal standards development process.
When the standard is revised, the clarifications provided by the
interpretation will be incorporated into the revised standard.
|