Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  


Project 2009
-29

Interpretation of TOP-002-2a R6

Related Files

Status:
The initial ballot for an interpretation of standard TOP-002-2a — Normal Operations Planning, Requirement R6, for FMPP ended on February 22, 2010.  Since at least one negative ballot included a comment, these results are not final.  A second (or recirculation) ballot must be conducted.   As part of the recirculation ballot process, the drafting team must draft and post responses to voter comments. The drafting team has a meeting scheduled for Monday, March 1, 2010 from 4:00–5:00 p.m. EST in which they plan to address the voter comments, and determine whether or not to make revisions to the balloted item(s).  Should the team decide to make revisions, the revised item(s) will return to the initial ballot phase.

The meeting information is: Conference Number: 1.866.740.1260   Access Code: 9473673

Purpose/Industry Need:
Florida Municipal Power Pool (FMPP) is seeking clarification as to whether it is the responsibility of a BA to plan to meet CPS and DCS under unscheduled changes in the system configuration and generation dispatch.

In accordance with the Reliability Standards Development Procedure, the interpretation must be posted for a 30-day pre-ballot review, and then balloted.  There is no public comment period for an interpretation.  Balloting will be conducted following the same method used for balloting standards.  If the interpretation is approved by its ballot pool, then the interpretation will be appended to the standard and will become effective when adopted by the NERC Board of Trustees and approved by the applicable regulatory authorities.  The interpretation will remain appended to the standard until the standard is revised through the normal standards development process.  When the standard is revised, the clarifications provided by the interpretation will be incorporated into the revised standard.
 

Draft Action Dates Results Consideration of Comments
FMPP
TOP-002-2a Requirement R6


Request for Interpretation

Interpretation
Initial Ballot

Info>> | Vote>>
02/11/10 - 02/22/10
(closed)
Summary>>

Full Record>>
 
Pre-ballot Review

Info>> | Join>>
01/11/10 - 02/11/10
(closed)
   
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.
Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.  


All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Monica Benson - monica.benson@nerc.net or 404-446-2560.