Project 2009-32
Interpretation
of EOP-003-1 R3 and R5
Status:
A re-ballot
for an interpretation of standard EOP-003-1 — Load Shedding Plans,
Requirements R3 and R5, for FMPP ended on March 31, 2010.
Since at least one negative ballot included a comment, these results are
not final. A second (or
recirculation) ballot must be conducted.
Purpose/Industry Need:
Florida Municipal Power Pool
(FMPP) is seeking clarification as to whether R3 and R5 apply only to
automatic load shedding or both automatic and manual load shedding.
In accordance with the Reliability Standards
Development Procedure, the interpretation must be posted for a 30-day
pre-ballot review, and then balloted.
There is no public comment period for an interpretation.
Balloting will be conducted following the same method used for
balloting standards.
If the interpretation is approved by its ballot pool, then the
interpretation will be appended to the standard and will become
effective when adopted by the NERC Board of Trustees and approved by the
applicable regulatory authorities. The interpretation will remain
appended to the standard until the standard is revised through the
normal standards development process.
When the standard is revised, the clarifications provided by the
interpretation will be incorporated into the revised standard.
|