Purpose/Industry Need:
The SAR is to address FERC Order
RM06-16-009 which
required the ERO to clarify TPL-002-0, Table 1 — footnote ‘b’, regarding
the planned or controlled interruption of electric supply where a single
contingency occurs on a transmission system by June 30, 2010.
The SAR provides a revision to TPL Table 1 footnote ‘b’ to provide
clarity to industry with regard to the planned or controlled
interruption of electric supply where a single contingency occurs on a
transmission system. The
referenced table appears in TPL-001, TPL-002, TPL-003, and TPL-004 so
while the FERC Order was for TPL-002, the change is reflected in all 4
standards.
|