Project 2010-13.1 Phase 1 of Relay Loadability: Transmission

Related Files


Status:
The Relay Loadability Standard Drafting Team is considering the comments received from the posting of the "Determination and Application of Practical Relaying Loadability Ratings" reference document.

Purpose/Industry Need:
This proposed standard will address the cascading transmission outages that occurred in the August 2003 blackout when backup distance and phase relays operated on high loading and low voltage without electrical faults on the protected lines.  This is the so-called ‘zone 3 relay’ issue, which has been expanded to address other protection devices subject to unintended operation during extreme system conditions.  The standard will establish minimum loadability criteria for these relays to minimize the chance of unnecessary line trips during a major system disturbance.  In December 2005, the Planning Committee approved a white paper providing the engineering basis for the proposed standard, culminating a major project to analyze the performance of existing protection systems and to research preferred set points.


Draft Action Dates Results Consideration of Comments
Relay Loadability Reference Document

Clean | Redline

       
 

Relay Loadability Reference Document

Reference Document

Supporting Materials:
Comment Form (Word)

Comment Period

Info>>

Submit Comments>>

03/20/08 - 05/03/08
(closed)

Comments Received>>

 

Consideration of Comments>>

 

Draft 6
Relay Loadability Standard

PRC-023-1
Clean | Redline to initial ballot

Supporting Materials:
Implementation Plan
Reference Document

Posted for 
Board of Trustees Approval
     
 

 Draft 5
Relay Loadability Standard

PRC-023-1
Clean | Redline to initial ballot

Recirculation Ballot

Info>>

01/31/08 - 02/09/08

(closed) 

Summary>>

Full Record>>

 

 Draft 4
Relay Loadability Standard

Clean | Redline to last posting

Supporting Materials:
Implementation Plan
Clean | Redline to last posting
Reference Document
Initial Ballot

Info>>
11/19/07 - 12/04/07
(closed)
 Summary>>

Full Record>>

Consideration of Comments>>

Pre-ballot Review

Info>>

10/18/07 - 11/19/07
(closed)
   
 

 Draft 3
Relay Loadability Standard

Clean | Redline to last posting

Supporting Materials:
Implementation Plan
Clean | Redline

Comment Period

Info>>

Submit Comments>>

03/19/07 - 04/17/07

(closed)

Comments Received>> Consideration of Comments>>

Revised

 

Draft 2
Relay Loadability Standard

Clean | Redline to first posting

Supporting Materials:
Implementation Plan
Clean | Redline
Relay Loadability Reference

Comment Period

Info>>

Submit Comments>>
 

 12/09/07 - 02/07/07 (closed)

Comments Received>> Consideration of Comments>>
 

Draft 1

Relay Loadability Standard

Draft Standard Version 1

Supporting Materials:
Implementation Plan
Reference Document

Comment Period

Info>>

Submit Comments>>
 

08/16/06 - 09/29/06 (closed)

Comments Received>> Consideration of Comments>>
 

Draft 2

Draft SAR Version 2 - clean

Draft SAR Version 2 - redline

      
 

 

 

Standard Drafting Team Nomination Period
Info>>

Submit Nomination>>
 

Due May 3, 2006

(closed)

    
 

 Draft SAR Version 1

Supporting Materials:
Working Paper on
Proposed Transmission
Relay Loadability

Comment Period
Info>>

SAR Drafting Team Nomination Period
Submit Nomination>>

01/16/06 - 02/15/06

(closed)

Nominations
Due February 3, 2006

Comments Received>> Consideration of Comments>>
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Monica Benson - monica.benson@nerc.net or 404-446.2560.