Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  

Transmission and Generation Protection System Maintenance and Testing (Project 2007-17)

Registered Ballot Body
| Related Files | Drafting Team Rosters

Status: 
The Standards Committee is seeking industry experts to serve on the Transmission and Generation Protection System Maintenance and Testing Standard Drafting Team.

Purpose/Industry Need 
The purpose of standard PRC-005 should remain “To ensure all transmission and generation Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested.”

In Order 693, the Federal Energy Regulatory Commission directed that changes be made to these standards.

These standards should be consolidated into a single standard to reduce the costs of compliance and a number of technical short comings in these standards should be corrected to provide reliable performance when responding to abnormal system conditions.

Proposed Standard Supporting Materials Comment 
Period
Comments
Received

Response
to Comments

Announcement

 

07/15/07 - 07/29/07

(closed)

Nomination Form

 

Announcement

Draft SAR Version 1
Protection System Maintenance and Testing
Posted for 30-day Comment Period
June 11 through July 10, 2007

Draft SAR Version 1

NERC SPCTF Assessment of Standards 

06/11/07 - 07/10/07

(closed)

Comment Form

Comments

Consideration of Comments

To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Lauren Koller - lauren.koller@nerc.net or 609-452-8060.