Project 2007-17
Protection System Maintenance and Testing

 Related Files

Status:

In November 2010, a revised definition of “Protection System” was approved by stakeholders and adopted by the NERC Board of Trustees.  The definition is pending regulatory approval, while the development of PRC-005-2 Protection System Maintenance and Testing is ongoing.  After PRC-005-2 failed to reach ballot pool approval in the recirculation ballot that ended 6/30/11, the drafting team revised the standard, and updated the Supplemental Reference and FAQ.  The standard and associated documents were posted for a formal comment period and initial ballot that concluded September 29, 2011.  The drafting team is considering comments from that posting.

 

Purpose/Industry Need: 
The purpose of standard PRC-005 should remain “To ensure all transmission and generation Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested.”

In Order 693, the Federal Energy Regulatory Commission directed that changes be made to these standards.

These standards should be consolidated into a single standard to reduce the costs of compliance and a number of technical short comings in these standards should be corrected to provide reliable performance when responding to abnormal system conditions.

Draft Action Dates Results

Consideration of Comments

Drafting Team Nominations Nomination Period

Info>>

Submit Nomination>>
 09/01/11 - 09/23/11
(closed)
   
Standard PRC-005-2
Clean |Redline to Recirc Ballot

Implementation Plan
Clean | Redline to Recirc Ballot

SAR

Supporting Materials:
Definition of Protection System

Supplemental Reference & FAQ
Clean | Redline to Last Posting

Mapping  Document

Unofficial Comment Form

Last Approved Versions of Standards to be Retired

PRC-005-1
PRC-008-0
PRC-011-0
PRC-017-0


Initial Ballot and Non-Binding Poll of VRFs and VSLs

Info>>

Vote>>
09/19/11 - 09/29/11
(closed)
Summary>>

Full Record>>
 
Non-Binding Poll Results>>
Formal Comment Period

Submit Comments>>
08/15/11 - 09/29/11
(closed)
Comments Received>>
Join Ballot Pools>>
(Initial Ballot and Non-Binding Poll)

08/15/11 - 09/14/11
(closed)


 


After PRC-005-2 failed to reach ballot pool approval in the recirculation ballot that ended on 6/30/11, the drafting team revised the standard. The Standards Committee authorized re-initiating the project with a posting of the SAR and revised standard for a 45-day comment period, with an initial ballot of the standard conducted during the last 10 days of the comment period. 

Standard Draft 4
PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Supporting Materials:
Definition for Approval
Supplemental Reference & FAQ
Clean | Redline to Last Posting

Last Approved Versions of Standards to be Retired

PRC-005-1

PRC-008-0

PRC-011-0

PRC-017-0

Recirculation Ballot and Non-binding Poll

Info>>

Vote>>

       6/20/11- 6/30/11
(closed)

Summary>>

Full Record>>

Non-Binding Poll Results>>

Standard Draft 4
PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Supporting Materials:
Comment Form (Word)

Supplemental Reference & FAQ
Clean
Successive Ballot and Non-Binding Poll

Info>>
Vote>>
05/03/11 - 05/13/11
(closed)
Summary Update>>

    Full Records Update>> 

Non-Binding Poll Results>>
Consideration of Comments>>
Comment Period

Submit Comments>>

Info>>
04/13/11 - 05/13/11
(closed)
Comments Received>>

Standard Draft 3

PRC-005-2

Clean | Redline to Last Posting

 

Implementation Plan for Standard

Clean | Redline to Last Posting

 

Supporting Materials

Comment Form (Word)

 

 Frequently Asked Questions

Clean | Redline to Last Posting

 

 Supplemental Reference

Clean |Redline to Last Posting

 

 Last Approved Versions of Standards to be Retired

PRC-005-1

PRC-008-0

PRC-011-0

PRC-017-0

Successive Ballot and Non-binding Poll of VRFs and VSLs

Updated Info>>

Info>>

Join>>

12/10/10- 12/20/10
(closed)

Successive Ballot
(closed)

Non-binding Poll of VRFs and VSLs
(closed)
Summary>>

Full Records>>
Consideration of Comments>>
Non-Binding Poll Results>> Consideration of Comments>>

Comment Period

Submit Comments for Standard >>

 

Info>>

 

11/17/10-12/17/10
(closed)
Comments Received>> Consideration of Comments>>

Draft 5

Definition of "Protection System"

Clean | Redline to last approval

Implementation Plan for Definition

Clean | Redline to last posting

Recirculation Ballot >>

 

Vote>>

Info>>

 

11/01/10 - 11/11/10

(closed)

Summary>>

Full Record>>

 
Draft 4

 

Definition of "Protection System"

Clean | Redline to Second Ballot

Redline to Last Approval

 

Implementation Plan for Definition

Clean

 

Supporting Materials:

Comment Form (Word)

 

Successive Ballot >>

Vote>>

Info>>

10/2/10 - 10/14/10

(closed)

Summary>>

Full Record>>

Consideration of Comments>>
30-day Formal Comment Period

Info>>

Submit Comments>>

9/13/10 - 10/12/10

(closed)

Comments Received>> Consideration of Comments>>

Draft 3

Definition of "Protection System"

Clean | Redline to Initial Ballot

 

 

Implementation Plan for Definition

Clean | Redline to Initial Ballot

 

Second Ballot for Definition  

Vote>> | Info>>
07/23/10 - 08/02/10
(closed)
Summary>>

Full Record>> 
Consideration of Comments (definition)>>
 
Draft 2

PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Implementation Plan for Definition

Supporting Materials:
Comment Form for Proposed Definition (Word)

Comment Form for Standard (Word)

Frequently Asked Questions
Clean | Redline to Last Posting

Supplemental Reference
Clean | Redline to Last Posting

Definition of "Protection System"

Proposed Version of Issues Database
Initial Ballots and Non-binding VRF/VSL Poll

Vote>> | Info>>
07/08/10 - 07/17/10
(closed)
Summary>>

Full Record>>
Standard


Full Record>>
Definition


Non-binding Poll Results>>
Consideration of Comments (standard) >>

Consideration
of Comments
   (definition) >>

Consideration of Comments (non-binding poll) >>

Pre-ballot Review
Join>> | Info>>
06/11/10 - 07/02/10
(closed)
   
Comment Period

Submit Comments (For Standard)

Submit Comments (For Definition)

Info>>
06/11/10 - 07/16/10
(closed)
Comments Received (Standard)>>

Comments Received (Definition)>>

Consideration
of Comments
   (definition) >>

Consideration of Comments >>

Draft 1
Protection System Maintenance and Testing Standard

PRC-005-2

Supporting Materials:
Comment Form (Word)

Implementation Plan

Supplementary Reference

Status of Addressing Issues

Frequently Asked Questions

Assessment of Impact of Proposed Modification to the Definition of “Protection System”
Comment Period

Info>>

Submit Comments>>
07/24/09 - 09/08/09
(closed)
Comments Received>> Consideration of Comments>>
 

 

 Standard Drafting Team Nominations
Info>>

Submit Nomination>>

07/15/07 - 07/29/07

(closed)

 
 

 Draft SAR Version 1
Protection System Maintenance and Testing

Draft SAR Version 1

Supporting Materials:
NERC SPCTF Assessment of Standards

Comment Period

Info>>

Submit Comments>>

06/11/07 - 07/10/07

(closed)

Comments Received>>

Consideration of Comments>>

To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Monica Benson - monica.benson@nerc.net or 404-446-2560.