Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  


Real-time Operations (Project 2007-03)

Registered Ballot Body | Related Files | Drafting Team Rosters

Status
The Standards Committee is posting the 1st draft of the Real-time Operations standards for a 45-day comment period beginning October 7, 2008.

Purpose/Industry Need 
The industry needs clearer, unambiguous and enforceable standards in order to effectively operate the Bulk Electric System.

  1. Clarify requirements for real-time operations of the Bulk Electric System in the cited standards. 

  2. Consider stakeholder comments received during the initial development of the standards and other comments received from ERO regulatory authorities as noted in Appendix B.

  3. Consider other general improvements as described in Appendix A.

  4. This satisfies the ANSI procedure requirement for five-year review of the standards.

Applicable Standards:    

  • COM-001-1 Telecommunications

  • COM-002-2 Communications and Coordination

  • IRO-004-1 Reliability Coordination – Operations Planning

  • IRO-005-2 Reliability Coordination – Current Day Operations

  • IRO-006-3 Reliability Coordination – Transmission Loading Relief

  • TOP-001-1 Reliability Responsibilities and Authorities

  • TOP-002-2 Normal Operations Planning

  • TOP-003-0 Planned Outage Coordination

  • TOP-004-1 Transmission Operations

  • TOP-005-1 Operational Reliability Information

  • TOP-006-1 Monitoring System Conditions

  • TOP-007-0 Reporting Sol and IROL Violations

  • TOP-008-0 Response to Transmission Violations

  • PER-001-0 Operating Personnel Responsibility and Authority

Proposed Standard Supporting
Materials
Comment 
Period
Comments
Received

Response
to Comments

Announcement

Standards for Real-time Operations 
Posted for 45-day Comment Period

Draft Standards
TOP-001-004
Clean

TOP-001-008, PER-001
Redline

  Implementation Plan

(Note: The Implementation Plan contains a mapping table with explanations as to why things have been changed.)
 

10/07/08 – 11/20/08

Electronic Comment Form

Comment Form

Comments
(Please select icon in the left hand column to see individual response.) 
 

Announcement

Solicit Nominations for Real-time Operations Standard Drafting Team

 

11/13/07 - 11/30/07

(closed)

Nomination Form

   

Draft 3
SAR for Real-time Operations
Posted for 30-day Comment Period

Draft SAR Version 3

clean | redline to last posting

       

Announcement

Draft 2
SAR for Real-time Operations
Posted for 30-day Comment Period

Draft SAR Version 2

clean | redline to last posting

  08/07/07 - 09/07/07
(closed)

Comment Form

Comments

Consideration of Comments

Announcement

SAR for Real-time Operations 
Posted for 30-day Comment Period

Draft SAR Version 1

  05/15/07 - 06/13/07
 (closed)

Comment Form

Comments

Consideration of Comments
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Lauren Koller - lauren.koller@nerc.net or 609-452-8060.