Project 2007-03
Real-time Transmission Operations

Related Files

Status:
The Real-time Operations Standard Drafting Team is developing its consideration of comments from a parallel comment period and ballot for TOP-001-2, TOP-002-3, and TOP-003-2, the Implementation Plan, and associated VRFs and VSLs for a 30-day comment period that ended on  January 12, 2011.  TOP-001-2 failed ballot while TOP-002-3 and TOP-003-2 passed ballot.

Purpose/Industry Need:
The industry needs clearer, unambiguous and enforceable standards in order to effectively operate the Bulk Electric System.

  1. Clarify requirements for real-time operations of the Bulk Electric System in the cited standards. 

  2. Consider stakeholder comments received during the initial development of the standards and other comments received from ERO regulatory authorities as noted in Appendix B.

  3. Consider other general improvements as described in Appendix A.

  4. This satisfies the ANSI procedure requirement for five-year review of the standards.

Applicable Standards:    

  • TOP-001-1 Reliability Responsibilities and Authorities

  • TOP-002-2 Normal Operations Planning

  • TOP-003-0 Planned Outage Coordination

  • TOP-004-1 Transmission Operations

  • TOP-005-1 Operational Reliability Information

  • TOP-006-1 Monitoring System Conditions

  • TOP-007-0 Reporting Sol and IROL Violations

  • TOP-008-0 Response to Transmission Violations

  • PER-001-0 Operating Personnel Responsibility and Authority

Draft Action Dates Results Consideration of Comments

Draft 6
Standards for Real-time Operations

 

TOP-001-2

Clean | Redline to last posting

 

TOP-002-3

Clean | Redline to last posting

 

TOP-003-2

Clean | Redline to last posting

 

Supporting Material

Implementation Plan

Clean | Redline to last posting

 

Issues Database

Clean | Redline to last posting

 

VRF and VSL Assignment Documentation

Clean | Redline to last posting

Comment Form (Word)

Mapping Document





Successive Ballots & Non-Binding Polls of VRFs and VSLs

Extension Info on Non-binding Polls>>

Updated Info>>

Info>>

Vote>>
Successive Ballots: 01/03/12 - 01/12/12
(closed)


Non-binding Polls: 01/09/12 - 01/18/12

Extension of non-binding poll for TOP-001-2 and TOP-003-2 until 01/19/12
(closed)
Summary>>

Successive Ballot Results:
TOP-001-2
TOP-002-3
TOP-003-2

Comments Received>>

Non-binding Results:
TOP-001-2
TOP-002-3
TOP-003-2
 




Formal Comment Period 




Submit Comments>>
12/14/11 - 01/12/12
(closed)
   
         

                                Draft 5
              Standards for Real-time Operations

TOP-001-2
Clean | Redline to last posting

TOP-002-3
Clean | Redline to last posting

TOP-003-2
Clean | Redline to last posting

Supporting Material
Implementation Plan
Clean | Redline to last posting

Issues Database
Clean | Redline to last posting

VRF and VSL Assignment Documentation
Clean | Redline to last posting
Comment Form (Word)

Initial Ballot & Non-Binding Poll of VRFs and VSLs

Vote>>
5/31/11 - 6/9/11
(closed)
Summary>>

Full Record>>

Non-Binding Results>>
 
Join Ballot Pool>> 4/26/11 - 5/25/11
(closed)
   
Formal 45-day Comment Period

Submit Comments>>

Info>>
4/26/11 - 6/9/11
(closed)
Comments Received>> Consideration of Comments>>

Draft 4
Standards for Real-time Operations 

TOP-001-2
Clean | Redline to Last Posting

TOP-002-3
Clean | Redline to Last Posting

TOP-003-2
Clean | Redline to Last Posting

Supporting Materials:
Implementation Plan
Issues Database
VRF and VSL Assignment Documentation
Comment Form (Word)

Comment Period

Submit Comments>>

Info>>
08/04/10 - 09/03/10
(closed)
Comments Received>> Consideration of Comments>>
 

Draft 3
Standards for Real-time Operations 

TOP-001-2
Clean | Redline to Last Posting

TOP-002-3
Clean | Redline to Last Posting

TOP-003-2
Clean | Redline to Last Posting

Supporting Materials:
Comment Form (Word)

Comment Period

Info>>

Submit Comments>>
08/25/09 - 09/24/09
(closed)
Comments Received>> Consideration of Comments>>
 

Standards for Real-time Operations 

TOP-001-2
Clean | Redline

TOP-002-3
Clean | Redline

TOP-003-1
Clean | Redline

TOP-004-3
Clean | Redline

TOP-008-1 Redline from Last Posting(last posting included the wrong version of TOP-008-0)

Supporting Materials:
Comment Form (Word)
Implementation Plan
Clean | Redline

Comment Period

Info>>

Submit Comments>>
04/07/09 - 05/07/09
(closed)
Comments Received>> Consideration of Comments>>
 

 Standards for Real-time Operations 

Draft Standards
TOP-001-004
Clean

TOP-001-008, PER-001
Redline

Supporting Materials:
Comment Form (Word)
Implementation Plan
(Note: The Implementation Plan contains a mapping table with explanations as to why things have been changed.)

Comment Period

Info>>

Submit Comments>>

10/07/08 – 11/20/08
(closed)

Comments Received>> Consideration of Comments>>
 
Nominations for Real-time Operations Standard Drafting Team

Info>>

Submit Nomination>>

11/13/07 - 11/30/07

(closed)

   
 

Draft 2
SAR for Real-time Operations

Draft SAR Version 2

clean | redline to last posting

  Comment Period

Info>>

Submit Comments>>
08/07/07 - 09/07/07
(closed)

Comments Received>>

Consideration of Comments>>
 

SAR for Real-time Operations 

Draft SAR Version 1

  Comment Period

Info>>

Submit Comments>>
05/15/07 - 06/13/07
 (closed)

Comments Received>>

Consideration of Comments>>

All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Monica Benson - monica.benson@nerc.net or 404-446-2560.