Project 2007-18
Reliability-based Control
Related Files
|
Field Trial Documents and Tools
Status:
As of July 28, 2010 this project has
been merged with Project 2007-05 - Balancing Authority Controls and is
now Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls:
Reserves.
The new project page is available at:
Project 2010-14.1 Phase 1 BARC: Reserves
Purpose/Industry Need:
This
project includes expanding on the work already done in developing the
draft BAL-007 through BAL-011 by adding requirements to address the
following concerns:
-
To
support corrective action by the BA when excessive Area Control
Error (as determined by this standard) may be contributing to or
causing action to be taken to correct an SOL/IROL problem
-
To
prevent Interconnection frequency excursions of short duration
attributed to the ramping of on and off-peak Interchange
Transactions
-
To
support timely transmission congestion relief by requiring
corrective load/generation management by the Balancing Authority(ies)
within a defined timeframe when participating in transmission
loading relief procedures.
-
To
address the directives of FERC Order 693.
-
To
ensure that when finalized the standards associated with this
project conform to the latest versions of NERC’s Reliability
Standards Development Procedure, the Sanction Guidelines of the
North American Electric Reliability Corporation, and the ERO Rules
of Procedure.
Additionally, the frequency model used to establish the frequency-based
limits will be reviewed to see if additional enhancements are necessary.
|