Newsroom  •  Site Map  •  Contact NERC

  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs  


Violation Risk Factors


Related Files

Status:
NERC staff discovered that some requirements in some of the approved Version 1 standards were not assigned Violation Risk Factors.  To correct this error, violation risk factors have been drafted for those requirements associated with standards that are expected to become enforceable in June 2007.  Because violation risk factors are proposed for use when determining a penalty or sanction for a violation of the associated requirement and need to be “in place” and ready for use in June 2007, the Standards Committee authorized use of the Urgent Action process in the Reliability Standards Development Procedure. 

The Board of Trustees will consider adopting the Supplemental Version 1 VRF requirements at its May 2, 2007 meeting.

Purpose/Industry Need:
As NERC moves forward to become the Electric Reliability Organization (ERO) and enforcement of the NERC reliability standards and the requirements contained within begins, there will be a need to determine and specify the relative risk the violation of each requirement poses to the bulk electric system.  The requester proposes to develop a matrix (Violation Risk Matrix) delineating the relative risks associated with the violation of each NERC standard requirement.  The Violation Risk Matrix would be used for the initial basis for determining enforcement action for future violations.

Draft Action Dates Results Consideration of Comments

Urgent Action
Supplemental
Version 1 Violation Risk Factors

Supplemental V1 VRF Matrix (Amended)

Posted for Board of Trustees Adoption May 2, 2007  

 Urgent Action
Supplemental
Version 1 Violation Risk Factors

Supplemental V1 VRF Matrix (Amended)

Urgent Action SAR

Recirculation Ballot Window

Info>>
04/23/07 - 04/27/07
(closed)
Final Results>>  
Initial Ballot Window

Info>>
04/16/07 - 04/21/07
(closed)
Final Results>> Consideration of Comments>>
Pre-ballot Review

Updated Info>>

Info>>

03/15/07 - 04/16/07
(closed)
   

Version 1 Violation Risk Factors 

Critical Infrastructure Protection

Facility Ratings

Balancing and Interchange

Interconnection Reliability Operations

Modeling

Protection and Control

Emergency Operations, Voltage Control and Transmission Operations

Posted for Board of Trustees Adoption March 12, 2007    

 Version 1 Violation Risk Factors 

Critical Infrastructure Protection

Facility Ratings

Balancing and Interchange

Interconnection Reliability Operations

Modeling

Protection and Control

Emergency Operations, Voltage Control and Transmission Operations

 

Recirculation Ballot

Info>>
02/28/07 - 03/09/07
(closed)

Ballot Results

Critical Infrastructure Protection

Facility Ratings

Balancing and Interchange

Interconnection Reliability Operations

Modeling

Protection and Control

Emergency Operations, Voltage Control and Transmission Operations

 
10-day Ballot Window

Info>>
02/14/07 - 02/23/07
(closed)
Summary>>

Full Results>>

Response to Comments 

Critical Infrastructure Protection

Facility Ratings

Balancing and Interchange

Interconnection Reliability Operations

Modeling

Protection and Control

Emergency Operations, voltage Control and Transmission Operations

 Violation Risk Factors for Version 0

Protection and Control

Balance and Interchange

Communications and Facilities

Emergency Operations

Interconnection Reliability Operations

Modeling

Personnel

Transmission Operations and Voltage Control

Transmission Planning

Implementation Plan

Recirculation Ballot Window

Info>>

02/2/07 - 02/11/07
(closed)
   

 Version 1 Violation Risk Factors 

Critical Infrastructure Protection

Facility Ratings

Balancing and Interchange

Interconnection Reliability Operations

Modeling

Protection and Control

Emergency Operations, Voltage Control and Transmission Operations

Implementation Plan

15-day Pre-ballot Review Window

Info>>
01/29/07 - 02/13/07
(closed)
   

Violation Risk Factors for Version 0

Balancing and Interchange

Communications and Facilities

Emergency Operations

Interconnection Reliability Operations

Modeling

Personnel

Protection and Control

Transmission Operations and Voltage Control

Transmission Planning

Implementation Plan

10-day Ballot Window

Info>>
12/04/06 - 12/15/06
(closed)
Ballot Results

Protection and Control

Balance and interchange

Communications and Facilities

Emergency Operations

Interconnection Reliability Operations

Modeling

Personnel

Transmission Operations and Voltage Control

Transmission Planning

Consideration of Comments

Protection and Control

Balance and interchange

Communications and Facilities

Emergency Operations

Interconnection Reliability Operations

Modeling

Personnel

Transmission Operations and Voltage Control

Transmission Planning

Pre-ballot Review
 
Info>>
11/02/06 - 12/01/06
(closed)
   
Version 1 Requirements

Implementation Plan

30-day Comment Period

Info>>

Submit Comments>>

11/02/06 - 12/01/06
(closed)
Comments Received>> Summary of Comments>>

Supplementary Comments>>

 WebEx/Conference Call: PowerPoint Presentation   October 2, 2006    

Matrix of Risk Factors for Version 0 and Version 1 Requirements

Matrix of Risk Factors - Version 0 and Version 1 Requirements

 

10-day Ballot Window

Info>>
10/06/06 - 10/16/06
(closed)
Final Results>> Consideration of Comments>>
30-day Pre-ballot Review

Info>>
09/06/06 - 10/05/06
(closed)
   

 VRF Survey 2
Version 0

Implementation Plan

30-day Comment Period

Submit Comments>>

Info>>

Due August 31, 2006
(closed)

Survey Responses>> Results>>

Consideration of Comments>>

 Update VRF Survey
Version 1

Implementation Plan

45-day Comment Period

Submit Comments>> 

Info>>
Due August 30, 2006
(closed)
Survey Responses>> Results>>

Consideration of Comments>>

Consideration of Comments>>(zipped)

 Addendum VRF Survey
Version 1

Implementation Plan

45-day Comment Period

Submit Comments>>

Info>>
 

Due August 30, 2006
(closed)

   

 VRF Survey
Version 1

Implementation Plan

45-day Comment Period

Submit Comments>>

Info>>

Due August 30, 2006
(closed)

   

 VRF Survey 1
Version 0

Submit Comments>>

Submit Nomination>>

Info>>

Due June 4, 2006
(closed)

 Due May 3, 2006
(closed)

Comments Received>> Results of 1st V0 Survey

Consideration of Comments>>

Final VRF SAR
Development and Implementation of Violation Risk Factors for Enforcement of Compliance with NERC Reliability Standards
       
Draft SAR Version 1
Violation Risk Factor Document

Violation Risk Factor Matrix

Compliance Guideline Elements

Submit Comments>> 02/02/06 - 03/06/06
(closed)
Comments Received>> Consideration of Comments>>

All comments should be forwarded to sarcomm@nerc.com.