search
  |    Account Log-In/Register    |    Contact Us
Transmission Loading Relief (TLR) Procedure
TLR Investigation ReportsTLR Investigation Procedure

The NERC TLR Procedure is an Eastern Interconnection-wide process that allows Reliability Coordinators to mitigate potential or actual operating security limit violations while respecting transmission service reservation priorities. A TLR log contains the details of TLR incidents reported by Reliability Coordinators who are required to complete the logs whenever they invoke TLR Level 2 or above. 

For information about the TLR procedure and transmission service priorities, please refer to NERC Reliability Standard IRO-006-5 – Reliability Coordination – Transmission Loading Relief and IRO-006-EAST-1 Transmission Loading Relief Procedure for the Eastern Interconnection. These two documents are available on the Reliability Standards page.

 

 

 
 

home | account log-in/register | legal and privacy/trademark policy | site map | careers | contact us

Atlanta Office | 3353 Peachtree Road, NE Suite 600 North Tower, Atlanta, GA 30326 | 404-446-2560
Washington Office | 1325 G Street, NW Suite 600, Washington, DC 20005| 202-400-3000

Copyright 2016 North American Electric Reliability Corporation. All rights reserved.