Generator Verification (Project 2007-09)

Registered Ballot Body
| Related Files | Reliability Standards Home Page | Drafting Team Rosters

Status
The Standards Committee has collected nominations but has not yet appointed a standard drafting team.

Purpose/Industry Need
The purpose of Project 2007-09 Generator Verification is:
  • To ensure that generators will not trip off-line during specified voltage and frequency excursions or as a result of improper coordination between generator protective relays and generator voltage regulator controls and limit functions (such coordination will include the generating unit’s capabilities).  
  • To ensure that generator models accurately reflect the generator’s capabilities and operating characteristics.

New standards to be finalized as part of this project are:

  • PRC-019 — Coordination of Generator Voltage Regulator Controls with Unit Capabilities and Protection

  • PRC-024 — Generator Performance During Frequency and Voltage ExcursionsMOD-026 —Verification of Models and Data for Generator Excitation System Functions

  • MOD-026 —Verification of Models and Data for Generator Excitation System Functions

  • MOD-027 — Verification of Generator Unit Frequency Response

Standards to be revised as part of this project are:

  • MOD-024 — Verification of Generator Gross and Net Real Power Capability 

  • MOD-025 — Verification of Generator Gross and Net Reactive Power Capability

All six of the standards included in this project address generator verifications needed to support bulk power system reliability. All six of he standards included in this project were originally ”Phase III & IV Planning Measures” that were translated into new or a proposed standards as part of the Version 0 translation effort.  Stakeholders have already agreed that there is a reliability-related need for each of these standards as part of the work performed in association with the Phase III & IV Modeling SAR.  In addition, each of the standards included in this project has some “fill in the blank” requirements assigned to the Regional Reliability Organization that need to be replaced with more specific “continent-wide” requirements before the standards are approved.

 
Proposed Standard Supporting Materials Comment 
Period
Comments 
Received

Response 
to Comments

Announcement

  07/17/07 - 07/30/07(closed)

Nomination Form

   
SAR Version 2
Clean | Redline to 1st posting
       

Announcement

SAR Version 1

  04/20/07 - 05/21/07 (closed)

Comment Form

Comments Consideration of Comments

Announcement

SAR Version 1

 

04/18/07 - 05/02/06 (closed) 

Nomination Form

   
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.


All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Barbara Bogenrief - barbara.bogenrief@nerc.net or 609-452-8060.