Generator
Verification (Project 2007-09) Status The purpose of Project 2007-09 Generator Verification is:
New standards to be finalized as part of this project are:
Standards to be revised as part of this project are:
All six of the standards included in this project address generator verifications needed to support bulk power system reliability. All six of he standards included in this project were originally ”Phase III & IV Planning Measures” that were translated into new or a proposed standards as part of the Version 0 translation effort. Stakeholders have already agreed that there is a reliability-related need for each of these standards as part of the work performed in association with the Phase III & IV Modeling SAR. In addition, each of the standards included in this project has some “fill in the blank” requirements assigned to the Regional Reliability Organization that need to be replaced with more specific “continent-wide” requirements before the standards are approved. |
| Proposed Standard | Supporting Materials | Comment Period |
Comments Received |
Response |
|---|---|---|---|---|
| 07/17/07 - 07/30/07(closed) | ||||
|
SAR Version 2 Clean | Redline to 1st posting |
||||
| 04/20/07 - 05/21/07 (closed) | Comments | Consideration of Comments | ||
|
04/18/07 - 05/02/06 (closed) |
||||
| To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice. | ||||
|
Documents in the PDF format require use of the Adobe Reader® software. Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files. For more information download the Adobe Reader User Guide. | ||||
All comments should be forwarded to sarcomm@nerc.net.
Questions? Contact Barbara Bogenrief - barbara.bogenrief@nerc.net
or 609-452-8060.