Status
Field testing of the generator capability verification (2) and protection and control (2) standards is expected to continue into 2007.

Purpose/Industry Need
Certain planning standards that were part of the Phase IIIIV NERC compliance program were not included in the Version 0 reliability standards.  The Version 0 drafting team, supported by industry comments, realized it could not achieve industry consensus on these specific standards in the timeframe or within the scope of the Version 0 standards project.  These standards are important, nonetheless, as they contain critical reliability requirements in support of recommendations from the NERC and U.S./Canada Power System Outage Task Force reports on the August 14, 2003 blackout.  Recognizing the importance of these standards, the NERC board resolved on October 15, 2004, that: "A satisfactory resolution of the issues regarding Phases III and IV of the planning standards would be to: (1) develop reliability standards covering the Phase III and Phase IV issues separate from the Version 0 effort, using the NERC standards development process; (2) have the Planning Committee expeditiously complete the drafting of the proposed standards needed to address the Phase III and Phase IV issues, and move those standards through the NERC standards development process as promptly as possible, but not later than the May 2005 board meeting."  This SAR proposes the development of reliability standards that address the disturbance monitoring and reporting requirements of those Phase III-IV planning standards.

 Proposed Standard

Supporting
Materials

Comment
Period

Comments
Received

Response to Comments

Field Test

Phase III-IV Standards for Field Test

  Request for Volunteers    

Draft 3 Set 1

Draft 3 of Set 1 - Clean
Draft 3 of Set 1
- Redline

Implementation Plan

    Recirculation Ballot Results

Initial Ballot Results

Draft 2 Set 2

Draft 2 of Set 2 - Clean
Draft 2 of Set 2 - Redline

Background Information

Implementation Plan

10/19/05 - 12/03/05

Comments

Response to Comments on Set 2

Draft 2 Set 1

Draft 2 of Set 1 - Clean
Draft 2 of Set 1 - Redline

Background Information

Implementation Plan

09/01/05 - 10/15/05

Comments

Response to Comments on Set 1

Phase III-IV Planning Standards

Standards Proposed for Deletion

Index Cross Referencing Planning Standards and Proposed Standards

Mapping to Phase III-IV Planning Standards

04/22/05 - 06/13/05

Comments

Response to Comments on Set 1

Response to Comments on Set 2

Existing Planning Standards (Phases I, IIA, IIB, III, and IV) as provided to the Version 0 Standards Drafting Team

Planning Standard Compliance Templates Approved April 2004 in Connection with the August Blackout Review

Draft 1 Version 0 Planning Standards

Cross Reference for Phase III-IV and V0.2

Translation Phase III and IV Standard

Nomination Form
January 28, 2005

 

 

Comments

 

Response to Comments

To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.


All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Barbara Bogenrief - barbara.bogenrief@nerc.net or 609-452-8060.

Copyright