Regions | Committees | Meetings | Search | Site Map | Contact Us | Home

Reliability Standards


Reliability-based Control (Project 2007-18)

Registered Ballot Body | Related Files | Reliability Standards Home Page | Drafting Team Rosters

Status
The Standards Committee authorized moving the Reliability-based Control SAR forward to standard drafting
.

Purpose/Industry Need 
This project includes expanding on the work already done in developing the draft BAL-007 through BAL-011 by adding requirements to address the following concerns:

  • To support corrective action by the BA when excessive Area Control Error (as determined by this standard) may be contributing to or causing action to be taken to correct an SOL/IROL problem

  • To prevent Interconnection frequency excursions of short duration attributed to the ramping of on and off-peak Interchange Transactions

  • To support timely transmission congestion relief by requiring corrective load/generation management by the Balancing Authority(ies) within a defined timeframe when participating in transmission loading relief procedures.

  • To address the directives of FERC Order 693.

  • To ensure that when finalized the standards associated with this project conform to the latest versions of NERC’s Reliability Standards Development Procedure, the Sanction Guidelines of the North American Electric Reliability Corporation, and the ERO Rules of Procedure.

 Additionally, the frequency model used to establish the frequency-based limits will be reviewed to see if additional enhancements are necessary.

Proposed Standard Supporting
Materials
Comment 
Period
Comments
Received

Response
to Comments

Announcement

Nominations Requested for Reliability-based Control Standard Drafting Team

  11/09/07 - 11/28/07
(closed)

Nomination Form

   

Draft 3
SAR for Reliability-based Control

Draft SAR Version 3

Clean | Redline

Project 2007-18 — Reliability-Based Control

Issues Raised by Industry to be Considered by the Standard Drafting Team
     

Announcement

Draft 2
SAR for Reliability-based Control
Posted for 30-day Comment Period

Draft SAR Version 2

Clean | Redline

  09/10/07 - 10/09/07
(closed)

Comment Form

Comments

Consideration of Comments

Announcement

Draft 1
SAR for Reliability-based Control
Posted for 30-day Comment Period
May 15 through June 13, 2007

Draft SAR Version 1

  05/15/07 - 06/13/07 (closed)

Comment Form

Comments

Consideration of Comments

Announcement

 

  05/14/07 - 05/25/07 (closed) 

Nomination Form

 

 
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.


All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Barbara Bogenrief - barbara.bogenrief@nerc.net or 609-452-8060.

Copyright