Regions | Committees | Meetings | Search | Site Map | Contact Us | Home

Reliability Standards


Reliability Coordination - Transmission Loading Relief (Project 2006-08) 


Registered Ballot Body
| Related Files | Reliability Standards Home Page | Drafting Team Rosters

Status
The TLR Drafting Team is considering the comments received from the posting of the first draft of the Transmission Loading Relief Reference Manual.

Approved for adoption by the NERC Board of Trustees on October 23, 2007. 

Purpose/Industry Need
In August 2004, NERC and NAESB agreed to immediately begin a joint effort to update the Eastern Interconnection TLR Procedure, as reflected in Attachment 1 to reliability standard IRO-006-0, to divide the reliability requirements and business practices, and to incorporate other necessary improvements to the TLR procedure.  In December 2004 NERC and NAESB formed the joint TLR Subcommittee to clarify and focus Attachment 1 to NERC reliability standard IRO-006-0 on the TLR requirements that are necessary for reliability, as distinguished from those TLR requirements that are business practices. 
 

 Proposed Standard Supporting
Materials
Comment
Period
Comments
Received

Response to Comments

Announcement

TLR Reference Manual
Posted for a 45-day Comment Period

Joint NERC/NAESB System Operator's TLR Reference Manual

02/08/08 - 03/29/08
(closed)

Comment Form

Comments  
  Field Test      

TLR Standard IRO-006-4
Board of Trustees Approval
October 23, 2007

IRO-006-4

White Paper

  1. Implementation Plan

  2. IRO-006-4 Attachment 1 with "mapping"

  3. NERC/NAESB System Operator's TLR Reference Manual

  4. Violation Severity Level Guideline for IRO-006-4 Attachment 1

     

Announcement

 

09/13/07 - 09/23/07

Recirculation Ballot Window

 

Announcement

Final Ballot Results

Announcement

TLR Standard IRO-006-4
Posted for a 10-day Ballot Window

IRO-006-4
Clean | Redline to last posted

Redline to last approval

White Paper

  1. Implementation Plan
    Clean
    | Redline to last posting

  2. IRO-006-4 Attachment 1 with "mapping"

  3. NERC/NAESB System Operator's TLR Reference Manual

  4. Violation Severity Level Guideline for IRO-006-4 Attachment 1

08/20/07 - 08/29/07

Ballot Window
(closed)

 

Ballot Summary

Consideration of Comments

Announcement

TLR Standard IRO-006-4
Posted for a 30-day Pre-ballot Review
July 20 through August 20, 2007

IRO-006-4
Clean | Redline to last posted

Redline to last approval

  1. White Paper

  2. Implementation Plan
    Clean
    | Redline to last posting

  3. IRO-006-4 Attachment 1 with "mapping"

  4. NERC/NAESB System Operator's TLR Reference Manual

  5. Violation Severity Level Guideline for IRO-006-4 Attachment 1

07/20/07 - 08/20/07

Pre-ballot Review
(closed)

   

Announcement


TLR Standard IRO-006-4
Posted for a 45-day Comment Period
May 1 through June 14, 2007

IRO-006-4
Clean | Redline to last approved

  1. White Paper

  2. IRO-006-4 Attachment 1 with "mapping"
    Clean | Redline
         

  3. Implementation Plan

05/01/07 - 06/14/07 (closed)

Comment Form

 

Comments Consideration of Comments
Final SAR  

Nomination Form

Due 01/12/07 (closed)

   
Draft SAR Version 1

Proposed changes to IRO-006-0

NERC-NAESB Split Justification

 

 

Nomination Form

Due 7/24/06 (closed)

Comments

Consideration of  Comments
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.



All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Barbara Bogenrief - barbara.bogenrief@nerc.net or 609-452-8060.

Copyright