Reliability Standards

 
Reliability Coordination - Transmission Loading Relief - IRO-006-3


Registered Ballot Body
| Related Files | Reliability Standards Home Page | Drafting Team Rosters

Status
SAC authorized the formation of a SAR drafting team to work on IRO-006 General Update with NAESB.  The team will ultimately separate the business practice and reliability requirements, allowing future modifications to be addressed by either NERC or NAESB, as recommended by FERC.

Purpose/Industry Need
The Interchange Distribution Calculator Working Group (IDCWG) is requesting a modification to the NERC Transmission Loading Relief (TLR) Procedure to clarify the wording related to the implementation of a TLR Level 4 (Section 2.5).  In addition, the IDCWG proposes modifying Section 2.4 and Section 7 to provide for the Reallocation of Markets Flows and Interchange Transactions at the top of the next hour for the issuance of a TLR Level 3b.  The reliability benefit is that a Reliability Coordinator will no longer be required to call a TLR Level 3a as soon as the System Operating Limit or Interconnection Reliability Operating Limit violation that caused the TLR Level 3b to be initiated has been mitigated, since the proposed revision results in a next hour Reallocation.  The proposed revision to the standard has been endorsed by the NERC Operating Reliability Subcommittee.

 

 Proposed Standard Supporting Materials Comment
Period
Comments
Received

Response to Comments

Transmission Loading Relief
Modification to TLR Levels 3b and 4
Posted for Board of Trustees Adoption August 2, 2006

IRO-006-2

Implementation Plan

     

Announcement

Re-ballot
IRO-006 - Reliability Coordination - 
Transmission Loading Relief
Modification to TLR Levels 3b and 4
Posted for Re-ballot
June 5 through June 23, 2006

IRO-006-2 - Clean

IRO-006-2 - Redline

Implementation Plan

Ballot Period Ended

06/05/06 - 06/23/06

 

Ballot Results

Comments

Announcement

Initial Ballot
IRO-006 - Reliability Coordination - 
Transmission Loading Relief
Modification to TLR Levels 3b and 4
Posted for Ballot
May 22 through May 31, 2006

IRO-006-2 - Clean

IRO-006-2 - Redline

Implementation Plan

Ballot Period Ended

05/22/06 - 05/31/06

   

Announcement

IRO-006 - Reliability Coordination - 
Transmission Loading Relief
Modification to TLR Levels 3b and 4
Posted for 30-day Pre-ballot Review
April 17-May 16, 2006

IRO-006-2 - Clean

IRO-006-2 - Redline

Implementation Plan - Clean

Implementation Plan - 1st Posting - Redline

Pre-ballot Review

04/17/06 - 05/16/06

 

   

IRO-006 - Reliability Coordination - 
Transmission Loading Relief
Modification to TLR Levels 3b and 4
Posted for 45-day Comment Period
February 17-April 3, 2006

IRO-006 - Clean

IRO-006 - Redline

Proposed SAR

Implementation Plan

01/17/06 - 04/03/06

Comments

Responses
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.



All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Barbara Bogenrief - barbara.bogenrief@nerc.net or 609-452-8060.