Regions | Committees | Meetings | Search | Site Map | Contact Us | Home

Reliability Standards

Transmission Vegetation Management


Registered Ballot Body
| Related Files | Reliability Standards Home Page | Drafting Team Rosters

Status
FAC-003 was approved by a Ballot Pool on January 27 and approved for adoption by the NERC Board of Trustees on February 7, 2006.

Purpose/Industry Need 
This standard shall apply to 200 kV or higher voltage transmission lines (and lower voltage transmission lines determined to be critical to reliability by the Regional Reliability Councils) over which NERC has oversight.

This standard is intended to improve the reliability of the electric transmission systems by eliminating transmission outages from vegetation located on transmission rights-of-way (ROW) and minimizing outages from vegetation located adjacent to ROW, maintaining safe clearances between transmission lines and vegetation on and along transmission rights-of-way, and establishing a system for reporting vegetation-related outages of the transmission systems (+200 kV) to the respective Regional Reliability Councils and NERC.

The August 14, 2003 blackout is the most recent demonstration that ineffective vegetation management may have serious adverse impacts on the reliability of the electric transmission systems. This standard will assist in reducing vegetation-related transmission outages by requiring each transmission owner to have a documented vegetation management program in place, including documentation of its implementation.  Each program is to be designed for the geographical area and specific design configurations of the transmission owner’s system.  This standard will also provide for uniform reporting of vegetation-related outages to the Regions and to NERC so that Planning Authorities and Reliability Authorities may measure the impact of vegetation-related outages on the reliability of the interconnected electric transmission systems.

Proposed Standard Comment 
Period
Comments
Received

Response
to Comments

Draft 3
Recirculation Ballot
January 17-27, 2006

FAC-003-1 - Transmission Vegetation Management Program 

Implementation Plan

 

Ballot Results

Recirculation

Responses to Comments

Draft 3 (Corrected)
Initial ballot
December 19, 2005 - January 6, 2006

FAC-003-1 - Transmission Vegetation Management Program 

Implementation Plan

 

Ballot Results

Initial

 

Draft 3

FAC-003-1 - Transmission Vegetation Management Program

FAC-003-1 - Redline

Implementation Plan

     

Draft 2

FAC-003-1 - Transmission Vegetation Management Program

Implementation Plan

 

06/16/05 - 07/31/05

Comments Response

Draft 1

Proposed  Standards for Vegetation Management

01/03/05 - 02/18/05

Executive Summary

Comments

Response

 

Drafting Team Nomination Form

Due by July 2, 2004

 

 

Draft SAR Version 1

05/20/04 - 07/02/04

Comments

Response
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.

Documents in the PDF format require use of the Adobe Reader® software.  Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files.   For more information download the Adobe Reader User Guide.


All comments should be forwarded to sarcomm@nerc.net.  
Questions?  Contact Barbara Bogenrief - barbara.bogenrief@nerc.net or 609-452-8060.

Copyright