|
|||||||||||||
![]() |
|||||||||||||
|
Registered Ballot Body | Related Files | Reliability Standards Home Page | Drafting Team Rosters Status Purpose/Industry
Need This standard is
intended to improve the reliability of the electric transmission systems
by eliminating transmission outages from vegetation located on
transmission rights-of-way (ROW) and minimizing outages from vegetation
located adjacent to ROW, maintaining
safe clearances between transmission lines and vegetation on and along
transmission rights-of-way, and establishing a system for reporting
vegetation-related outages of the transmission systems (+200 kV) to the
respective Regional Reliability Councils and NERC. The purpose of revising this standard is to:
|
| Proposed Standard | Supporting
Materials |
Comment Period |
Comments Received |
Response |
|---|---|---|---|---|
|
Vegetation Management SDT Nominations |
07/03/07 - 07/17/07 (closed) | |||
|
Draft SAR
Version 3 |
||||
|
Draft SAR
Version 2 Redline to 1st Posting |
04/10/07 - 05/09/07 (closed) | Consideration of Comments | ||
|
Draft SAR
Version 1 |
01/15/07 - 02/14/07 Closed 01/29/07 (Closed) |
Consideration of Comments | ||
| To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice. | ||||
|
Documents in the PDF format require use of the Adobe Reader® software. Free Adobe Reader® software allows anyone view and print Adobe Portable Document Format (PDF) files. For more information download the Adobe Reader User Guide. |
|
|||
All comments should be forwarded to sarcomm@nerc.net.
Questions? Contact Barbara Bogenrief - barbara.bogenrief@nerc.net
or 609-452-8060.