Regions | Committees | Meetings | Search | Site Map | Contact Us | Home

Reliability Standards

 
Announcements

File Type

Size

Date

Description

Acrobat 171 KB 05/09/08 Announcement:

Initial Ballot Results

  • Revised Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for Ameren
  • Revised Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for MISO
Acrobat 166 KB 05/02/08 Announcement:

Two Ballot Pools and Pre-ballot Windows Open for:

  • Project 2008-04 - FAC-010-2, FAC-011-2, FAC-014-2
  • Interpretation of EOP-002-2 Requirement R6.3 and Requirement R7.1 for Brookfield Power
Acrobat 170 KB 04/24/08 Announcement:

Nomination Period Opens - System Operator Certification Standard Drafting Team (Project 2007-04)
Acrobat 51 KB 04/24/08 Announcement:

Two Ballot Windows Open

  • Revised Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for Ameren
  • Revised Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for MISO
Acrobat 230 KB 04/18/08 Announcement:

Comment Period Opens ― EOP VSL Revisions ― Project 2008-08
Acrobat 240 KB 04/18/08 Announcement:

Nomination Period Opens for Drafting Team ― Project 2008-08
Acrobat 165 KB 04/16/08 Announcement:

Comment Period Opens - ATC/TTC/AFC and CBM/TRM Revisions (Project 2006-07)

Acrobat 170 KB 04/15/08 Announcement:

Comment Period Opens - System Restoration and Blackstart (Project 2006-03)

Acrobat 172 KB 03/31/08 Announcement: to be announced

Comment Period Opens - FAC SAR and Standards

Acrobat 179 KB 03/26/08 Announcement:

Comment Period Opens - IROL Standards

Acrobat 50 KB 03/24/08 Announcement:

Pre-ballot Windows and Ballot Pools Open for Two Interpretations

Acrobat 58 KB 04/03/08 Reliability Standards Workshop Agenda:
  • April 29-30, 2008 - San Diego, California
Acrobat 51 KB 03/20/08 Announcement:

Comment Periods Open:

  • Project 2008-06 - Cyber Security SAR
  • Relay Loadability Reference Document
Acrobat 116 KB 03/20/08 Announcement:

Nomination Period Opens for SAR Drafting Team (Project 2008-06)

Acrobat 179 KB 03/14/08 Announcement:

Initial Ballot Results for Project 2006-07 — ATC/TTC and CMB/TRM

Acrobat 112 KB 04/03/08 Reliability Standards Workshop Announcement
  • April 29-30, 2008 - San Diego, California
Acrobat

60 KB

03/03/08 Announcement:

Final Ballot Results for Nine Sets of Violation Severity Levels — Project 2007-23

Acrobat

53 KB

03/03/08 Announcement:

Six Ballot Windows Open for Project 2006-07 — ATC/TTC and CMB/TRM

Acrobat

166 KB

02/25/08 Announcement:

Comment Period Opens for Project 2006-01 — System Operating Personnel

Acrobat

54 KB

02/11/08 Announcement:

Ballot Results - Initial Ballot for Violation Severity Levels and Recirculation Ballot for Relay Loadability

Acrobat

73 KB

02/08/08 Announcement:

Nine Ballot Windows Open for Project 2007-23 — Violation Severity Levels

Acrobat

43 KB

02/08/08 Announcement:

Comment Period for Project 2006-08 - TLR Reference Manual - Opens

Acrobat

167 KB

02/07/08 Announcement:

Comment Period for Project 2006-04 - Backup Facilities Opens

Acrobat

102 KB

02/01/08 Announcement:

Pre-ballot Windows and Ballot Pools Open for Draft Standards for Available Transfer Capability (Project 2006-07)

Acrobat

59 KB

01/31/08 Announcement:

Recirculation Ballot Window Open for PRC-023-1 - Transmission Relay Loadability

Acrobat

54 KB

01/25/08 Announcement:

Nomination Period Opens for SAR Drafting Team (Project 2008-05)

Acrobat

58 KB

01/25/08 Announcement:

Recirculation Ballot Results

  • Interpretation of VAR-001-1, Requirement 4
  • Interpretation of BAL-005-1, Requirement 17
Acrobat

59 KB

01/24/08 Announcement:

Comment Periods Open

  • Proposed Revisions to Timing Tables in INT-005-2, INT-006-2, INT-008-2
  • SAR to Revise FAC-010-1 and FAC-011-1 and Proposed Changes to FAC-010-1 and FAC-011-1 to Comply with FERC Order 705
  • SAR to Revise FAC-011-1 to Address Credible Multiple Contingencies
Acrobat

62 KB

01/21/08 Announcement:

Ballot Windows Open for Revised VSLs for NUC-001

Acrobat

74 KB

01/17/08 Announcement:

Pre-ballot Windows and Ballot Pools Open - Revised VSLs for NUC-001 Posted

Acrobat

177 KB

01/14/08 Announcement:

Recirculation Ballot Window for the Interpretation of BAL-005-1 Requirement R17 and VAR-001 Requirement R4 Opens  

Acrobat

177 KB

01/07/07 Announcement:

Initial Ballot Results for Interpretation of Requirement R17 in BAL-005-1 — Automatic Generation Control

Acrobat

162 KB

01/07/07 Announcement:

Comment Period Opens for System Restoration and Blackstart Standards

Acrobat

73 KB

01/02/08 Announcement:

Nomination Period Opens for Balancing Authority Controls Standard Drafting Team

Acrobat

59 KB

01/02/08 Announcement:

SAR for Certifying System Operators (Project 2007-04) posted for 30-day Comment Period

Acrobat

97 KB

12/21/07 Announcement:

Nine Pre-ballot Windows and Ballot Pools Open for Project 2007-23 — Violation Severity Levels

Acrobat

27 KB

12/21/07 Announcement:

Initial Ballot Windows Opens

  • Revised Interpretation of BAL-005-1 Requirement R17 for PGE
Acrobat

77 KB

12/14/07 Announcement:

Initial Ballot Results

  • Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for Ameren
  • Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for MISO
  • Interpretation of VAR-001-0 Requirement R4 for Dynegy
Acrobat

69 KB

12/06/07 Announcement:

Initial Ballot Results for Transmission Relay Loadability Standard

Acrobat

79 KB

12/04/07 Announcement:

Two Ballot Windows Open

  • Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for Ameren
  • Interpretation of TPL-002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for MISO
Acrobat

 77 KB

11/19/07 Announcement:
  • Initial Ballot Window for PRC-023 — Relay Loadability
  • Pre-ballot Window for Revised Interpretation of BAL-005 Requirement R17 (for PGE)
Acrobat

74 KB

11/16/07 Announcement:
  • Recirculation Ballot Window for Interpretation of CIP-006-1 (SCE&G)
  • Recirculation Ballot Window for Urgent Action Revisions to BAL-004-1
Acrobat

73 KB

11/13/07 Announcement:

Nominations for Project 2007-03 Real-time Operations Standards Drafting Team Open

Acrobat

71 KB

11/13/07 Announcement:

Draft Violation Severity Levels for Nuclear Plant Interface Coordination Standard (NUC-001-1) Standard Posted for Abbreviated 14-day Comment Period

Zip File

10,396 KB

11/14/07 Reliability Standards Workshop Presentations (Update)
  • November 13-14, 2007 - Albuquerque, New Mexico
Acrobat

73 KB

11/09/07 Announcement:

Nominations for Project 2007-18 Reliability-based Control Standards Drafting Team Open

Acrobat

80 KB

11/05/07 Announcement:
  • Pre-ballot Window and Ballot Pool for Interpretation of TPL-002-003 - Ameren
  • Pre-ballot Window and Ballot Pool for Interpretation of TPL-002-003 - MISO
  • Pre-ballot Window and Ballot Pool for Interpretation of VAR-001 - Dynegy 
Acrobat

88 KB

10/31/07 Announcement:

Initial Ballot Results

  • Urgent Action Revisions to BAL-004-1
  • Interpretation of CIP-006-1 (for SCE&G)
  • Interpretation of BAL-005 Requirement R17 (for PGE
Acrobat

84 KB

10/31/07 Announcement:

Draft Standards for Available Transfer Capability (Project 2006-07) Posted for 45-day Comment Period

Acrobat

90 KB

10/18/07 Announcement:
  • Initial Ballot Window for Urgent Action Revisions to BAL-004 is Open
  • Initial Ballot Window for Interpretation of CIP-006-1 (for SCE&G) is Open
  • Initial Ballot Window for Interpretation of BAL-005 Requirement R17 (for PGE) is Open
  • Pre-ballot Window and Ballot Pool for PRC-023-1 — Relay Loadability
Acrobat

68 KB

10/10/07 Announcement:

Violation Severity Levels (Project 2007-23) Posted for 45-day Comment Period October 10 through November 27, 2007

Acrobat 72 KB 10/09/07 Reliability Standards Workshop Announcement
  • November 12-13, 2007 - Albuquerque, New Mexico
Acrobat

71 KB

10/08/07 Announcement:

WebEx and Conference Call to Provide Overview of First Draft of TPL-001-1 — Transmission System Planning Performance Requirements on Wednesday, October 10, 2007

Acrobat

68 KB

10/01/07 Announcement:

Final Ballot Results for Interpretation of BAL-003-0, R2, 2.2, 5, and 5.1

Acrobat

68 KB

09/24/07 Announcement:

Final Ballot Results for IRO-006-4 — Reliability Coordination — Transmission Loading Relief

Acrobat

72 KB

09/20/07 Announcement:

Recirculation Ballot Window for the Interpretation of BAL-003-0 Requirements R2, R2.2, R5, and R5.1 Opens

Acrobat

70 KB

09/19/07 Announcement:

Nominations for Project 2007-14 Permanent Changes to Coordinate Interchange Timing Tables Standards Drafting Team Open

Acrobat

77 KB

09/19/07 Announcement:

Pre-ballot Window and Ballot Pool for Interpretation of CIP-006-1 (for SCE&G) and BAL-005 Requirement R17 (for PGE) both Open

Acrobat

79 KB

09/17/07 Announcement:

Pre-ballot Window and Ballot Pool for Urgent Action Revisions to BAL-004 Open

Acrobat

71 KB

09/13/07 Announcement:

Recirculation Ballot Window for the First Phase of Changes to IRO-006 — Reliability Coordination — Transmission Loading Relief Opens 

Acrobat

68 KB

09/12/07 Announcement:

First Draft of TPL-001-1 — Transmission System Planning Performance Requirements Posted for 45-day Comment Period

Acrobat

72 KB

09/10/07 Announcement:

Second Draft of SAR for Reliability-based Control (Project 2007-18) Posted for 30-day Comment Period

Acrobat

68 KB

09/07/07 Announcement:

Initial Ballot Results for Interpretation of BAL-003-0, R2, 2.2, 5, and 5.1

Acrobat

72 KB

09/04/07 Announcement:
  • Initial Ballot Results for IRO-006-4 — Reliability Coordination — Transmission Loading Relief
  • Final Ballot Results for Interpretation of BAL-001-0 R1 and BAl-003-0 R3
Acrobat

68 KB

08/27/07 Announcement:

Initial Ballot Window for Interpretation of BAL-003-0 Requirements R2, R2.2, R5, and R5.1 Opens

Acrobat

75 KB

08/23/07 Announcement:
  • Recirculation Ballot Window for Interpretation of BAL-001-0 Requirement 1 and BAL-003-0 Requirement 3
  • Final Ballot Results for Removal of WECC Waiver from INT-001 and INT-004
Acrobat

68 KB

08/17/07 Announcement:

Initial Ballot Window for First Phase of Changes to IRO-006

Acrobat

68 KB

08/17/07 Announcement:

Initial Ballot Results for Interpretation of BAL-001-0 R1 and BAl-003-0 R3

Acrobat

80 KB

08/15/07 Announcement:

Nomination Periods Open for Three Drafting Teams

  • Project 2006-01 System Personnel Training Standard Drafting Team
  • Project 2007-06 System Protection Coordination Standard Drafting Team
  • Project 2007-17 Protection System Maintenance and Testing Standard Drafting Team
Acrobat

75 KB

08/15/07 Announcement:

Posted for 45-day Comment Period

  • EOP-005-2 — System Restoration and Blackstart – Operations and EOP-006-2 — System Restoration and Blackstart — Coordination Standards
  • PER-005-1 — System Personnel Training Standard and Implementation Plan
Acrobat

72 KB

08/13/07 Announcement:

Re-ballot Results and Opening of Re-circulation Ballot Window for Withdrawal of “WECC Tagging Dynamic Schedules and Inadvertent Payback Waiver”

Acrobat

39 KB

08/13/07 Announcement:

SAR for Real-Time Transmission Operations and Balancing of Load and Generation Posted for 30-day Comment Period

Acrobat

31 KB

08/06/07 Announcement:

Initial Ballot Window for Interpretation of BAL-001-0 Requirement 1 and BAL-003-0 Requirement 3 Opens August 7, 2007

Acrobat

69 KB

07/27/07 Announcement:

Pre-ballot Window and Ballot Pool for BAL-003-0 — Frequency Response and Bias Requirements Open  

Acrobat

82 KB

07/20/07 Announcement:

Pre-ballot Window and Ballot Pool for IRO-006-4 — Reliability Coordination — Transmission Loading Relief Open

Acrobat

76 KB

07/19/07 Announcement:

FAC-008-2 — Facility Ratings Standard and Implementation Plan Posted for 30-day Comment Period

Acrobat

68 KB

07/19/07 Announcement:

Initial Ballot Results and Re-ballot for Withdrawal of WECC Waiver for INT-001 and INT-004

Acrobat

 73 KB

07/17/07 Announcement:

Comment Periods Open

  • SAR for Certifying System Operators (Project 2007-04)
  • SAR for Violation Severity Levels (Project 2007-23)
Acrobat

93 KB

07/17/07 Announcement:

Nomination Periods Open for Five New Drafting Teams

  • Project 2007-04 — Certifying System Operators SAR Drafting Team
  • Project 2007-05 — Balancing Authority Controls SAR Drafting Team
  • Project 2007-09 — Generator Verification Standard Drafting Team
  • Project 2007-12 — Frequency Response Standard Drafting Team
  • Project 2007-23 — Violation Severity Levels Drafting Team
Acrobat

69 KB

07/09/07 Announcement:

Ballot Window for Withdrawal of WECC Waiver for INT-001 and INT-004; Pre-ballot Window and Ballot Pool for Interpretation of BAL-001 and BAL-003 Open

Acrobat

69 KB

07/03/07 Announcement:

Nominations for Project 2007-07 Transmission Vegetation Management Standard Drafting Team

Acrobat

72 KB

07/03/07 Announcement:

SAR for Balancing Authority Controls (Project 2007-05) Posted for 30-day Comment Period

Acrobat

67 KB

07/03/07 Announcement:

Final Ballot Results for Interpretation of VAR-002 Requirements 1 and 2

Acrobat

70 KB

06/20/07 Announcement:

Recirculation Ballot Window Opens for Interpretation of VAR-002-1, Requirements 1 and 2

Acrobat

76 KB

06/12/07 Announcement:

Nomination Period Opens

  • Nominations for Project 2007-11 Disturbance Monitoring Standard Drafting Team
Acrobat

72 KB

06/11/07 Announcement:

Comment Periods Open

  • SAR for System Protection Coordination (Project 2006-06)
  • SAR for Protection System Maintenance & Testing (Project 2006-17)
Acrobat

69 KB

06/06/07 Announcement:

Pre-ballot Window and Ballot Pool for Withdrawal of “WECC Tagging Dynamic Schedules and Inadvertent Payback Waiver” Open June 6, 2007

Acrobat

87 KB

05/25/07 Announcement:

Comment Periods Open

  • SAR and Draft Standards for Available Transfer Capability (Project 2006-07)
Acrobat

79 KB

05/25/07 Announcement:

Nomination Period Opens

  • Nominations for Project 2006-07 ATC/TTC/AFC and CBM/TRM Revisions
Acrobat

82 KB

05/15/07 Announcement:

Comment Periods Open

  • SAR for Real-time Operations (Project 2007-03)
  • SAR for Reliability-based Control (Project 2007-18)
Acrobat

76 KB

05/11/07 Announcement:

Nomination Periods Open for Two Drafting Teams

  • Project 2006-06 Reliability Coordination Standard Drafting Team
  • Project 2007-18 Reliability-based Control SAR Drafting Team
Acrobat

80 KB

05/09/07 Announcement:

Correction for Effective Date for BAL-006-1, Inadvertent Interchange

Acrobat

76 KB

05/01/07 Announcement:

Comment Period Opens for IRO-006-4 — Transmission Loading Relief (Project 2006-08)

Acrobat

68 KB

04/30/07 Announcement:

Nominations Period Opens for Backup Facilities Standard Drafting Team

Acrobat

73 KB

04/30/07 Announcement:
  • Final Ballot Results for Supplemental Version 1 Violation Risk Factors
  • Final Ballot Results for Balance Resources and Demand Standards Final Ballot Results for Nuclear Plant Interface Coordination Standard (NUC-001)
  • Final Ballot Results for Interpretation Request for BAL-005 Requirement 17
  • Initial Ballot Results for Interpretation Request for VAR-002 Requirements 1 and 2
Acrobat

72 KB

04/23/07 Announcement:

Expedited Standards Recirculation Ballot Window for Supplemental Version 1 Violation Risk Factors Open April 23–27, 2007

Acrobat

80 KB

04/20/07 Announcement:

Comment Periods Open for Two SARs:

  • Generator Verification (Project 2007-09)
  • Permanent Changes to the Timing Table in the Coordinate Interchange Standards (Project 2007-14)
Acrobat   04/18/07 Announcement:

Nomination Periods Open for Three Drafting Teams:

  • Project 2007-09 Generator Verifications SAR Drafting Team
  • Project 2006-03 System Restoration and Blackstart Standard Drafting Team
  • Project 2007-02 Operating Personnel Communications Protocols SAR Drafting Team
Acrobat

80 KB

04/17/07 Announcement:

One Initial Ballot Window and Three Recirculation Ballot Windows Open on April 17, 2007

  • Interpretation of VAR-002-1 Requirements 1 and 2 (Initial Ballot)
  • Balance Resources and Demand Standards (Recirculation)
  • Nuclear Plant Interface Coordination Standard (NUC-001) (Recirculation)
  • Interpretation of BAL-005 — Automatic Generation Control Requirement 17  (Recirculation)
Acrobat

72 KB

04/16/07 Announcement:

Standards Ballot Window Open - Supplemental Version 1 Violation Risk Factors 

Acrobat

68 KB

04/10/07 Announcement:

Comment Period Opens (Project 2007-07)

Acrobat

72 KB

04/03/07 Announcement:

Initial Ballot Results:

  • Balance Resources and Demand Standards (BAL-007-011)
  • Urgent Action SAR to Modify Coordinate Interchange Standards (INT-005, INT-006, INT-008)
  • Nuclear Power Interface Coordination Standard (NUC-001)
  • Interpretation Request for BAL-005 Requirement 17
Acrobat

71 KB

03/23/07 Announcement:

Amendment to Supplemental Version 1 Violation Risk Factors for Standards Posted for Pre-ballot Review that Opened March 15, 2007

Acrobat

 75 KB

03/22/07 Announcement:

SAR for Disturbance Monitoring (Project 2007-11) Posted for 30-day Comment Period

Acrobat

72 KB 03/22/07 Announcement:

Pre-ballot Window and Ballot Pool for IROL Standards Open March 22, 2007

Acrobat

72 KB 03/19/07 Announcement:

Three Comment Periods Open

  • SAR to Modify the Reliability Coordinator Standards
  • Transmission Relay Loadability Standard
  • SAR for Project 2007-02 Operating Personnel Communications Protocols

Acrobat

76 KB 03/19/07 Announcement:

Three Ballot Windows Open March 19, 2007

  • Initial Ballot for Balance Resources and Demand Standards
  • Initial Ballot for Nuclear Plant Interface Coordination Standard (NUC-001)
  • Initial Ballot for Urgent Action SAR to Modify Coordinate Interchange Standards (INT-005, INT-006, INT-008)
  • Initial Ballot for Interpretation of BAL-005 - Automatic Generation Control Requirement 17

Acrobat

83 KB 03/15/07 Announcement:

Pre-ballot Window and Ballot Pool Open on March 15, 2007 for Interpretation of VAR-002-1, Requirements 1 and 2

Acrobat

72 KB 03/15/07 Announcement:

Pre-ballot Window and Ballot Pool for Supplemental Version 1 Violation Risk Factors for Standards Open March 15, 2007

Acrobat

72 KB 03/15/07 Announcement:

Nomination Period Opens for Two Drafting Teams - Underfrequency Load Shedding and Operating Personnel Communications Protocols

Acrobat

66 KB 03/07/07 Announcement:

Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx - March 8, 2007

Acrobat

67 KB 03/06/07 Announcement:

Initial Ballot Results for the Reliability Standards Development Procedure, Version 7 

Acrobat

75 KB 02/28/07 Announcement:

Standards Recirculation Ballot Windows for V1 Risk Factors Open February 28-March 9, 2007

Acrobat

68 KB 02/26/07 Announcement:

Nomination Period Opens for SAR Drafting Team - Disturbance Monitoring

Acrobat 74 KB 02/26/07 Announcement:
  • Announcement of Initial Ballot Results - Version 1 Violation Risk Factors
  • Intent to Forward Approved Standards to NERC Board of Trustees for Adoption
Acrobat 77 KB 02/26/07 Announcement:

Five-day Ballot Window Opens for Reliability Standards Development Procedure, Version 7

Acrobat 103 KB 02/22/07 Reliability Standards Workshop Announcement
  • April 19-20, 2007 - Orlando, Florida
  • April 23-24, 2007 - San Diego, California
Acrobat 74 KB 02/15/07 Announcement:

Three 30-day Comment Periods Open February 15, 2007:

Acrobat 79 KB 02/15/07 Announcement:

Pre-ballot Windows and Ballot Pools Open February 15, 2007:

  • Balance Resources and Demand Standards, 
  • Nuclear Plant Interface Coordination Standard, and 
  • Urgent Action SAR to modify Coordinate Interchange Standards 
Acrobat 81 KB 02/13/07 Announcement:

Ballot Windows for Version 1 Violation Risk Factors Open February 14–23, 2007

Acrobat 72 KB 02/12/07 Announcement:

Ballot Pool Opens for Changes to Reliability Standards Development Procedure

Acrobat 70 KB 02/12/07